Certified to comply with ANSI A112.18.1M U.S. PATENT NO. D269,696
Certificado para cumplir con ANSI A112.18.1M PATENTE U.S. Nº D269,696
Certifié conforme à la norme ANSI A 112.18. 1M Brevet É.-U. no D269,696
ROUGHING-IN DIMENSIONS
DIMENSIONES CALCULADAS
DIMENSIONS
PLOMBERIE BRUTE
TWO-HANDLE BATH/SHOWER
CONJUNTO DE TINA/DUCHA DE 2 MANIJAS
ROBINETS DE BAIN/DOUCHE À 2 POIGNÉES
3-5/8" REF.
3-5/8" REF.
RÉF. 3-5/8"
6-1/2 REF.
6-1/2 REF.
RÉF. 6-1/2"
FINISHED WALL
PARED TERMINADA
MUR FINI
1-1/4 DIA HOLE
AGUJERO 1-1/4 DIAM.
TROU DIA. 1-1/4
TOP OF TUB RIM
PARTE SUPERIOR
DEL ANILLO DE TINA
HAUT - BORD DE
LA BAIGNOIRE
VALVE INLETS
1/2 C.W.T. OR
1/2 N.P.T.M.
ENTRADAS DE VÁLVULA
1/2 C.W.T. O
1/2 N.P.T.M.
SOUPAPES D’ENTRÉE
1/2 CWT OU 1/2 NPTM
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 78''
OPCIONAL PARA TERMINAR
PISO HABITUALMENTE
ENTRE 65'' Y 78''
OPTIONNEL : NIVEAU DÉFINITIF DU SOL,
HABITUELLEMENT ENTRE 165 ET
198 CM (65" - 78")
1/2 N.P.T. SHOWER ARM
1-1/4 DIA HOLE
AGUJERO 1-1/4 DIAM.
TROU DIA. 1-1/4
1/2 N.P.T. SPOUT NIPPLE
1/2 N.P.T.
PICO BOQUILLA DE UNIÓN
MAMELON 1/2 NPT
1/2 N.P.T. BRAZO DE DUCHA
BRAS DE DOUCHE 1/2 NPT
4-3/4 REF.
4-3/4 REF.
RÉF. 4-3/4
4-3/8 REF.
4-3/8 REF.
RÉF. 4-3/8
1" MIN. 2" MAX.
1" MIN. 2" MAX.
2,54 CM MIN. 5,08 CM MAX.
(2) 1-3/4 DIA. HOLES
FOR VALVES ON 8" CENTERS
(2) AGUJEROS 1-3/4 DIAM.
PARA VÁLVULAS EN CENTROS DE 8"
(2) TROUS DIA. 1-3/4 POUR
ÉLÉMENT CENTRAL DE 20 CM
NOTE: NO CONCEALED PIPING FURNISHED
NOTA: CAÑERÍA ABIERTA ABASTECIDA
NOTA : NE COMPREND PAS LA TUYAUTERIE DISSIMULÉE
M96875 6 R e v 1.2
Gracias por seleccionar los productos American Standard, sinónimo de la mejor
calidad durante más de 100 años. Por favor lea estas instrucciones detenidamente
antes de comenzar para que lleve a cabo la instalación sin contratiempos.
Nous vous remercions d’avoir choisi American Standard… synonyme de qualité supérieure
depuis plus de 100 ans. Pour vous assurer que l’installation se déroulera sans difficulté,
veuillez lire attentivement ces instructions avant de commencer.
Thank you for selecting American-Standard...the benchmark of fine
quality for over 100 years. To ensure that your installation proceeds
smoothly--please read these instructions carefully before you begin.
CARE INSTRUCTIONS:
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH
A SOFT COTTON FLANNEL CLOTH.
INSTRUCCIONES DE CUIDADO DEL PRODUCTO:
LIMPIE EL PRODUCTO CON AGUA LIMPIA Y SÉQUELO CON UNA TELA SUAVE
DE FRANELA DE ALGODÓN.
INSTRUCTIONS POUR L'ENTRETIEN
FAIRE : SIMPLEMENT RINCER LE PRODUIT AVEC DE L'EAU CLAIRE JUSQU'À
CE QU'IL SOIT PROPRE SÉCHER AVEC UN LINGE DE FLANELLE DE COTON DOUX.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH,
ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE.
NO LIMPIE EL PRODUCTO CON JABÓN, ÁCIDOS, PULIDORES, ABRASIVOS,
LIMPIADORES FUERTES O TELAS ÁSPERAS.
NE PAS FAIRE : NE PAS NETTOYER LE PRODUIT AVEC DES SAVONS, DE
L'ACIDE, DU POLISH, DES ABRASIFS, DES NETTOYANTS AGRESSIFS OU UN
LINGE À TEXTURE RUGUEUSE.
ASSISTANCE TÉLÉPHONIQUENUMBERO DE EMERGENCIAHOTLINE FOR HELP
CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
For toll-free information and answers to your questions, call:
Para información y respuestas a sus preguntas, llame sin costo al:
Pour information et réponses à vos questions, composer sans frais:
1 800 442-1902
Weekdays Días laborales de las Sur semaine:
8:00 to 6:00 p.m. EST
Weekdays Días laborales de las Sur semaine:
8:00 to 6:00 p.m. EST
BOTTOM OF TUB
FONDO DE LA BAÑERA
FOND DE BAIGNOIRE
15/16"
15/16" (21.5 MM)
21.5 mm (15/16 po.)
4"
4" (102 MM)
102 mm (4 po.)
1-3/4"
1-3/4" (44 MM)
44 mm (1-3/4 po.)
3275
CADET
Installation Instructions
Instrucciones de Instalacion
Instructions d'installation
1
Prepare water supplies per Roughing-in Dimensions.
ROUGHING-IN FITTING
AJUSTE CALCULADO
IMPORTANT: DO NOT REMOVE PLASTER GUARDS (2) UNTIL STEP 2.
Install VALVE (1) at indicated height and depth. Make sure the outlet marked "SHR" is pointing upward.
Apply Teflon Tape to threaded end of SUPPLY PIPE (6, 6a).
Install SUPPLY PIPES (6, 6a) into round end of UNION (7, 7a).
Hand tighten Hex End of UNION (7, 7a) onto valve inlet ports, then tighten with adjustable
wrench an aditional 1/2 turn. Secure VALVE BODY (1) to cross brace of wall structure.
Prepare SHOWER RISER (4) and ELBOW (3). Connect to TOP outlet, marked
"SHR" of VALVE BODY (1). (Plug "SHR" for Tub Filler installation only).
Prepare TUB FILLER PIPE (8), ELBOW (10) and roughing-in NIPPLE (9). Connect to
BOTTOM outlet of VALVE BODY (1). (Plug "Tub Outlet" for Shower installation only).
Add cross braces to wall structure and secure SHOWER RISER (4) and TUB FILER PIPE (8).
Cap (11) NIPPLE (9) and PLUG (5) ELBOW (3), with valves closed open supply lines
and check for leaks. Open both VALVES and check for leaks.
Close both valves and turn off water supplies. Finish wall construction.
COLD
FRÍA
FROID
HOT
CALIENTE
CHAUD
CAUTION
Turn off hot and cold water supplies before beginning.
CROSS
BRACE
CRUZAR
PLANTILLA
IMPORTANTE: NO REMUEVA LAS PROTECCIONE S DE YESO (2) HASTA EL PASO 2.
Prepare l a i nst ala ció n p ara ag ua de acue rdo co n l as dim ens ion es calculadas .
Instale l a VÁ LVULA (1) a l a a ltu ra y p rof und ida d indicada s. Ase gúr ese de qu e l a salida marc ada co mo "SH R" est é h acia arrib a.
Aplicar c int a d e Te flon a la tube ría de la fu ent e
Instale l as tub erí as de la fue nte (6, 6a ) e n e l e xtr emo re don do de la ‘uni ón’ (7 , 7 a)
Mano apri eta el ex tre mo de la tuerca hex ago nal de la ‘u nió n’ (7, 7a) sobre pu ertos de la ent rad a d e l a v álv ula , entonces ap rie te con
llave aju sta ble un a ∏ vu elt a a dicional
Asegure q ue el CUE RPO DE LA VÁLV ULA (1 ) c ruc e l a plantill a d e l a e str uct ura de la pared.
Prepare l a T UBE RÍA DE SU BID A (4) y el C ODO (3 ). Con ect e a la salida SUPER IOR , m arc ada co mo
"SHR" en el CUE RPO DE LA VÁLV ULA (1 ). (Ca pór pa ra instala cio n d e s ali da de tin a).
Prepare l a T UBE RÍA DE LL ENA DO DE LA TINA (8 ), el COD O ( 10) y la BOQUILLA D E U NIÓ N ( 9) cal cul ada . Conecte a l a s ali da INF ERI OR del
CUERPO DE LA VÁLVULA (1).
Agregue l as abr aza der as cru zad as a la es tru ctu ra de la par ed y asegure la TUB ERÍ A D E S UBI DA (4) y la TUBE RÍA DE LL ENA DO DE LA TINA (8),
Tapa (1 1) BOQ UIL LA DE UNIÓN (9) y TAPÓN (5 ) C ODO (3 ), con la s válvulas ce rra das ab ra las lí neas de abast eci mie nto y bus que pé rdidas.
Abra amba s VÁ LVULAS y busq ue pér did as.
Cierre am bas vá lvu las y cie rre el abaste cim ien to de agu a. Termi ne la con str ucc ión en la pared.
Cierre el abastecimiento de agua fría y caliente antes de comenzar.
SHR
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
3
5
4
2
7
7a
6
8
10
6a
9
1
11