American Standard 2462.016, 2876.016, 2467.016 Installation Instructions Manual

INSTALLATION INSTRUCTIONS
CADET 1.6 GPF TWO-PIECE PRESSURE-ASSISTED TOILETS
- Model 2462.016 Cadet Elongated 15"
- Model 2467.016 Cadet Elongated 16-1/2" High Bowl
YORKVILLE 1.6 GPF TWO-PIECE PRESSURE-ASSISTED TOILETS
- Model 2878.016 Yorkville Elongated 16-1/2" High Bowl
Thank you for selecting American Standard - the benchmark of fine quality for over 100 years. To ensure this product is installed properly, please read these instructions carefully before you begin. (Certain installations may require professional help.) Also be sure your installation conforms to local codes.
CAUTION: PRODUCT IS FRAGILE. TO AVOID BREAKAGE AND POSSIBLE INJURY HANDLE WITH CARE!
!
NOTE: For proper operation the recommended working pressure is between 25 psi at valve when flushing and 80 psi static.
RECOMMENDED TOOLS AND MATERIALS
Putty Knife Regular Screwdriver Adjustable Wrench Sealant Tape Measure Hacksaw Wax Ring/Gasket Flexible Supply Tube Closet Bolts Carpenters Level
Closet Flange Set (Cadet Toilets) Neoprene or Graphite Felt Gasket (Yorkville Toilets)
1 REMOVE OLD TOILET
a. Close toilet supply valve and flush tank completely. Towel or sponge remaining water from tank and bowl. b. Disconnect and remove supply line. NOTE: If replacing valve, first shut off main water supply! c. Remove old mounting hardware, remove toilet and plug floor waste opening to prevent escaping sewer gases. d. Remove closet bolts from flange and clean away old wax, putty, etc. from base area. NOTE: Mounting surface must be clean and level before new toilet is installed!
FOR CADET TOILETS: FOR YORKVILLE TOILETS:
DIMENSIONS (Nominal) NOTE: Distance from wall to closet
2-1
flange centerline (rough-in) must be 12" (305 mm)
30-1/4"
1"
(27mm)
3-1
(226mm)
12"
(305mm)
INSTALL CLOSET BOLTS
Install closet bolts in flange channel, turn 90°, and slide into place 6" (152 mm) apart and parallel to wall.
9"
6"
(150mm)
CLOSET BOLTS
(768mm)
(470mm)
13-3/4"
(347mm)
18-1/2"
16-1/2"
(419mm)
HIGH BOWL
15"
(381mm)
CLOSET FLANGE
20-1/2"
(516mm)
(356mm)
9-1/2"
(238mm)
305mm
(12)
14"
HIGH BOWL
29-1/4"
(742mm)
DIMENSIONS (Nominal) NOTE: Distance from floor to closet
2-2
flange centerline (rough-in) must be 4" (102 mm) with flange surface flush to 1/16" (16mm) max. beyond finished wall.
29-3/4"
(752mm)
1/2" (11mm)
9"
(226mm)
30-3/4"
(781mm)
13-5/8"
(346mm)
INSTALL CLOSET BOLTS
3-2
Install closet bolts in flange channel, turn 90°, and slide into place 6" (152 mm) apart and parallel to floor. (Use putty to hold bolts in place if necessary.) Brace under flooring as needed and drill two mounting pilot holes as shown.
18-1/2"
(470mm)
12"
(305mm)
15"
(381mm)
16-1/2"
(419mm)
HIGH BOWL
CLOSET BOLTS
102mm
346mm (13-5/8)
20-1/2"
(516mm)
14"
(356mm)
(230mm)
(4)
30-3/4"
(780mm)
HIGH BOWL
SAVE FOR FUTURE USE
29-1/4"
(743mm)
9"
FLUSH TO 1/16" (16mm) EXPOSED CLOSET FLANGE
Product names listed herein are trademarks of AS America, Inc. © AS America, Inc. 2009
168mm (6-5/8")
PILOT
HOLES
7301312-100
con’t. FOR CADET TOILETS:
4-1
INSTALL
WAX SEAL
Invert toilet on floor (cushion to prevent damage), and install wax ring evenly around waste flange (horn), with tapered end of ring facing toilet. Apply a thin bead of sealant around base flange.
5-1
NUT
TAPERED WASHER
SEALANT
WAX RING
con’t. FOR YORKVILLE TOILETS:
INSTALL NEOPRENE OR GRAPHITE FELT SEAL*
4-2
Install seal evenly around waste flange (horn). Apply a thin bead of sealant around base flange.
* Note: Wax seal not recommended for this
NEOPRENE SEAL
application.
5-2
FLANGE
FLANGE BOLTS
SEALANT
CLOSET BOLT
FLANGE
INSTALL TOILET ON FLANGE
a. Unplug floor waste opening and install toilet on closet flange so bolts project through mounting holes. b. Loosely install retainer washers and nuts. Side of washers marked "THIS SIDE UP" must face up!
6-1
BOLT CAP
CLOSET BOLT
WASHER
INSTALL TOILET
a. Position toilet squarely to wall and, with a rocking motion, press bowl down fully on wax ring and flange. Alternately tighten nuts until toilet is firmly seated on floor.
!
b. Install caps on washers. (If necessary, cut bolt height to size before installing caps.) c. Smooth off the bead of sealant around base. Remove excess sealant.
NUT
CAUTION: DO NOT OVERTIGHTEN NUTS
OR BASE MAY BE DAMAGED!
CLOSET FLANGE
LAG
TAPERED WASHERS
BOLT
INSTALL TOILET ON FLANGE
a. Unplug floor waste opening and install toilet on closet flange so bolts project through mounting holes. b. Loosely install retainer washers and nuts. Side of washers marked "THIS SIDE UP" must face up!
6-2
BOLT CAP
NUT & WASHER
BOLT CAP
BOLT
WASHER
INSTALL TOILET
a. Position toilet squarely to wall and, with a rocking motion, push bowl against ring and flange. Alternately tighten nuts until toilet is firmly anchored.
b. Insert the tapered washers (supplied in the kit) into the lag bolts (not supplied). Insert bolts through mounting holes and tighten into pre-drilled floor openings. c. Install the four bolt caps on tapered washers. (If necessary, cut wall bolt length to size before installing caps.) d. Smooth off the bead of sealant around base. Remove excess sealant.
HEAD
CAUTION: DO NOT OVERTIGHTEN NUTS
!
OR BASE MAY BE DAMAGED!
- 2 -
7301312-100
Loading...
+ 2 hidden pages