American Standard 2373.920, 2373.900, 2373.901, 2373.921 User Manual

Installation
Instructions
ENFIELD
with EverClean™ Finish
Congratulations on purchasing your American Standard faucet with EverClean finish found only on American Standard faucets.
EverClean Finish
• One wipe effortlessly removes spots
• Eliminates the need for cleaners and scrubbing
• Permanent surface protectant remains beautiful for the life of the faucet
• EverClean™ available on: Polished Chrome, Satin Nickel, Stainless Steel, Polished Brass (or any combination of these finishes)
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
IMPORTANT NOTICE TO INSTALLER!
Please check with local Code Authority for the installation requirements of this product. Some codes require an additional temperature mixing valve to limit the maximum hot water temperature and vacuum breaker (for products with hand spray) to be installed with this product.
2373.900
2373.920
2373.901
2373.921
Certified to comply with ANSI A112.18.1M
M968288 Rev. 1.1
Required Tools
Flat Blade Screwdriver
ROUGHING-IN DIMENSIONS
MOUNTING
SURFACE
8"
Adjustable Wrench
5-3/16"
3-3/4"
1-1/8 DIA.
LEVER
HANDLE
2-7/8"
Channel Locks
ADJ. 6-1/2 TO 12
2-7/8 DIA.
1-1/4
MAX.
*Hex key
*Supplied with Fitting
CROSS
HANDLE
2-1/4 DIA.
3
*Wrench
2-1/16
DIA.
1-1/2 MAX.
8-3/16
3/4-14 MALE
N.P.T. INLETS
(H)
1-1/16 DIA.
1-3/16 DIA.
(C)
12 MAX
SPOUT ASSEMBLY
1
CAUTION
Install RING WASHER (1) into SPOUT BASE recess. Check that O-RING (2) on end of SPOUT SHANK (3) is in place. Insert SPOUT SHANK (3) through SPOUT ESCUTCHEON (4) and into center hole on mounting surface.
Assemble RUBBER WASHER (5) and LOCKNUT (6) onto SPOUT SHANK (1). Align SPOUT ASSEMBLY and from underside of ledge secure SPOUT ASSEMBLY into position with LOCKNUT (6).
Turn off hot and cold water supplies before beginning.
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
2
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center VALVE (2) location (between 6-1/2" and 12"). If necessary, cut and/or bend TUBING carefully. Make sure tube bend is close to the TEE (1) so that it will not effect the compression joint at the VALVE CONNECTION.
Remove COUPLING NUT (3) and FERRULE (4) from each VALVE (2) and slide onto TUBING (5).
4
3
1
5
3
4
SPOUT BASE RECESS
2
2
1
3
4
5
6
VALVE ASSEMBLY
3
Install LOCKNUTS (1) and RUBBER WASHERS (2) onto valve shanks.
Push TUBING (3) ends into VALVE (4) side outlets. Insert VALVES (4) into mounting holes from underside of ledge.
Press TEE (5) onto SPOUT SHANK (6) making certain that the O-RING (7) is properly seated on SHANK (6). Push COUPLING (8 or 8a) into TEE (5) and attach to SPOUT SHANK (6) and tighten. Note: For product with Hand
Shower, COUPLING (8) is tightened using a 10mm (3/8”) Hex Wrench.
Thread of VALVE BODY (4) should extend at least 5/16 inch above MOUNTING SURFACE (11). If necessary, adjust LOCKNUT (1).
Place RUBBER RING (10) into ESCUTCHEON ADAPTERS (9) and thread onto valves until snug against internal stop.
Tighten LOCKNUT (1) to secure VALVE (4) position.
Slide FERRULE (12) and COUPLING NUT (13) to outlet of VALVE (4) and tighten COUPLING NUT (13) firmly.
Connect HOT water supply to inlet of left VALVE and COLD water supply to inlet of right VALVE using appropriate connector.
5/16'' MIN.
10
4
MOUNTING SURFACE
9
11
2
1
NOTE
MOUNTING SURFACE
FOR FITTING LESS SPRAY
ADJ. 6-1/2 TO 12
VALVE inlet is 3/4-inch NPT male.
9
10
4
12
HOT
13
3
5
88a
MOUNTING
9
10
7
6
12
13
SURFACE
2
11
MOUNTING
SURFACE
4
COLD
M968288 Rev. 1.1
Loading...
+ 2 hidden pages