Installation
Instructions
TOWNSQUARE |
2555.652 |
|
PRESSURE BALANCING BATH AND |
||
|
||
SHOWER with Built-in Diverter for |
|
|
RIM MOUNT TUB FILLER |
|
|
with EverClean™ Finish |
|
Congratulations on purchasing your American Standard faucet with EverClean finish found only on American Standard faucets.
EverClean Finish
•One wipe effortlessly removes spots
•Eliminates the need for cleaners and scrubbing
•Permanent surface protectant remains beautiful for the life of the faucet
•EverClean™ available on: Polished Chrome, Satin Nickel,
Stainless Steel, Polished Brass (or any combination of these finishes)
Certified to comply with ANSI A112.18.1
. 3FW
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
|
ROUGHING-IN DIMENSIONS |
|
|
|
Required Tools |
To assure proper positioning in relation to wall, note |
|
||
roughing-in dimensions. |
|
|
||
|
|
FINISHED WALL |
1-5/8" TO 3-1/4" |
|
|
|
|
|
|
Phillips Screwdriver |
|
1 |
1/2" I.P.S. |
|
|
|
|
||
|
|
|
|
|
|
2" REF. |
|
|
|
Flat Blade Screwdriver |
|
|
OPTIONAL TO |
|
|
|
FINISHED FLOOR |
|
|
|
|
|
USUALLY BETWEEN |
|
|
|
|
65'' AND 78'' |
|
|
|
8" REF. |
|
OUTLETS 1/2" NPT |
|
74" FOR |
|
|
|
|
|
|
|
|
|
HEAD CLEARANCE |
|
|
|
|
|
|
"SEE ILLUSTRATION" |
|
|
|
|
SHW |
|
Plumbers' Putty or Caulking |
|
7-1/2" |
5-5/8" |
|
|
|
|||
|
|
|
TUB |
|
|
42 to 54" |
|
|
|
|
OPTIONAL |
|
|
|
|
|
|
|
1-3/4" |
Channel Locks |
|
8-1/4" |
INLETS |
5-5/8" |
|
|
|
||
|
|
|
1/2" NPT |
|
|
|
|
|
THREADED INLETS (STOPS) |
|
|
|
SPOUT MTG. |
|
|
3-11/16" |
|
SURFACE |
|
|
|
1-1/4 |
|
|
Adjustable Wrench |
|
MAX. |
|
|
BOTTOM OF |
|
|
||
|
1/2" NPT |
|
||
|
TUB |
1/2" NPT |
|
|
|
|
|
||
|
|
|
|
1 |
ROUGHING-IN |
CAUTION |
Turn off water at main supply. |
|
|
|
|
|
|
|
|
|
|
5 |
NOTE When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering, |
7 |
|||
|
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread |
|
sealant or Teflon tape on threaded connections.
See Roughing-in diagram before starting. Connections are:
1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB".
For proper positioning the finished wall must be within side wall of PLASTER GUARD (4).
|
|
If the valve is installed on a fiberglass |
1 |
|
|
||||
|
|
or other thin wall application, the |
|
|
|
|
PLASTER GUARD (4) can be used as a support. |
2 |
|
|
|
|
Cut a 4" dia. hole in the shower stall. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Drill two additional 1" holes to allow access |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to the stops. |
HOT |
|
|
|
Remove PLASTER GUARD (4), rotate 90˚ |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
so that indicated screw holes fit MANIFOLD (2). |
|
|
|
|
Push CAP on valve, place ESCUTCHEON on and |
3 |
|
|
|
||
|
|
|
||
|
|
|
attach with screws. |
|
|
|
Connect hot and cold water supplies. |
|
|
|
|
|||
|
|
Cap off shower pipe (5) and tub filler pipe (6). |
|
|
|
|
For support, use pipe BRACES (7) secured to wooden braces. With valve turned off, turn on water supplies. Check for leaks.
COLD 4
6