Allied Telesis AT-SB4108-00 User Manual

SwitchBlade Chassis and Fan Tray
Quick Install Guide
SwitchBlade Chassis and Fan Tray Quick Install Guide Document Number C613-04029-01 REV C.
Copyright © 2002-2003 Allied Telesyn International, Corp. 19800 North Creek Parkway, Suite 200, Bothell, WA 98011, USA.
All rights reserved. No part of this publication may be reproduced without prior written permission from Allied Telesyn.
Allied Telesyn International, Corp. reserves the right to make changes in specifications and other information contained in this document without prior written notice. The information provided herein is subject to change without notice. In no event shall Allied Telesyn be liable for any incidental, special, indirect, or consequential damages whatsoever, including but not limited to lost profits, arising out of or related to this manual or the information contained herein, even if Allied Telesyn has been advised of, known, or should have known, the possibility of such damages.
All trademarks are the property of their respective owners.
Quick Install Guide 3
Documentation Roadmap
SwitchBlade
Safety and Statutory Information Booklet
Hardware Reference
Software Reference
Chassis & Fan Tray Quick Install Guide
Power Supply Unit Quick Install Guide
Switch Controller Quick Install Guide
Line Card Quick Install Guide
Bandwidth Expander Quick Install Guide
CAM Quick Install Guide
General Customer Support
Visit www.alliedtelesyn.co.nz for the latest documentation, FAQs, and support information.
Printed Acrobat PDF
Website

Models Covered By This Guide

This Quick Install Guide includes information on installing the following components:
AT-SB4108-00 SwitchBlade 8 triple feed AC chassis.
AT-SB4108-60 SwitchBlade 8 dual feed AC chassis.
AT-SB4104-00 SwitchBlade 4 dual feed AC chassis.
AT-SB4108-80 SwitchBlade 8 dual feed DC chassis.
AT-SB4104-80 SwitchBlade 4 dual feed DC chassis.
AT-SB4152 SwitchBlade 8 fan tray.
AT-SB4151 SwitchBlade 4 fan tray.
Quick Install Guide updates can be downloaded from www.alliedtelesyn.co.nz/support/switchblade/
C613-04029-01 REV C

Chassis Package Contents

The following items are included with each SwitchBlade chassis. These items may arrive in more than one package. Contact your sales representative if any items are damaged or missing.
One SwitchBlade chassis.
One SwitchBlade fan tray (pre-installed at factory).
One fan tray faceplate (pre-installed at factory).
4 SwitchBlade Chassis and Fan Tray
Blank faceplates for all but one switch controller bay and one line card bay
(pre-installed at factory). That is, eight faceplates for the SwitchBlade 8 and four faceplates for the SwitchBlade 4.
One blank faceplate for each PSU bay (pre-installed at factory).
Two rack-mount brackets (pre-installed at factory).
One 19 inch rack-mount kit.
Two RS-232 DB9 cables for connecting switch controller RS-232 ASYN0
ports to a terminal or PC.
Two Ethernet patch cables for connecting switch controller RJ-45 ETH0
ports to a terminal or PC.
One SwitchBlade Documentation and Tools CD-ROM (which includes the
complete SwitchBlade documentation set and utilities).
One SwitchBlade Chassis and Fan Tray Quick Install Guide.
One Safety and Statutory Information booklet.
One warranty card.
One cable manager with four wire loops (with the SwitchBlade 8 only).
One rack crossbar (to support the chassis’s weight during installation).
Related items that can be purchased separately:
Blank faceplates for switch controller and line card bays (AT-SB4193).
Blank faceplates for PSU bays (AT-SB4192).
Fan trays (AT-SB4152 for the SwitchBlade 8 or AT-SB4151 for the
SwitchBlade 4).
Blank faceplates for fan tray bays (AT-SB4191 for the SwitchBlade 8 or
AT-SB4194 for the SwitchBlade 4).

Selecting A Site

The chassis can be installed in a standard 19-inch rack or on a level surface such as a sturdy bench. When installing the chassis, choose a site that:
allows adequate airflow around the chassis and its vents.
is free of dust and moisture.
will allow the chassis and its components to operate within a temperature
range of 0 to 40º C (32 to 104º F) and a humidity range of 5 to 95% non­condensing.
has a reliable and earthed (grounded), preferably dedicated and filtered
power supply circuit.
does not expose cabling to sources of electrical noise, such as radios,
transmitters, broadband amplifiers, power lines, electric motors, and fluorescent fixtures.
allows easy access to the chassis’s power and cable connections.
will allow all related network devices to be connected to the chassis
without exceeding maximum cable length limitations. See the SwitchBlade Hardware Reference for cable length specifications.
C613-04029-01 REV C
Loading...
+ 7 hidden pages