Allegri 021021018FR001, 021021010FR001 User Manual

Customer Service: (702)361-4345, (800) 525-2655, customer.service@kalco.com WARNING - TO REDUCE THE RISK OF FIRE OR INJURY:
1.lf you are unfamiliar with electrical wiring, call a qualified electrician to install this unit. More than one person may be necessary to install fixture, make sure you have enough qualified help.
2.Turn off the power to the fixture's circuit at the service panel. Use a voltage detector to verify the power is off.
3.DO NOT install bulb which exceeds the maximum wattage specified on the socket label.
FRAME INS TALLATIO N :
wall
1-Outlet Box
NOTE: Carefully unpack frame and crystals and lay them down on a clean softh cloth for identification.
Step 1. Screw Crossbar 2 to outlet box 1 with original outlet box screws 4. Make sure crossbar studs 3 are pointing away from wall.
Step 2. Get frame a few inches close to
wall and connect wires: Connect fixture ribbed wire (L) to power supply black wire. Connect fixture smooth wire (N) to power supply white wire. Connect fixture silver or copper bare wire (G) to power supply green wire.
Step 3. Align fixture back plate holes to crossbar studs 3 and fix it flat to wall, secure fixture with decorative nuts 5, then
Install light bulbs.
2-Cross Bar 3-Cross bar stud s x 2
4-Scre ws for out let box
Light Bulbs (not provided)
Frame chrome
L N
G
5-Decorative Nuts
(Krypton 40w max bulbs are recommended)
Proceed to install crystal set; follow directions on pages 2 and 3 .
P1
021021-010-FR001
Customer Service: (702) 361-4345, (800) 525-2655, customer.service@kalco.com
CRYSTAL SET INSTRUCTIONS:
Step 1. Carefully unwrap all crystal components and lay them down on a clean softh cloth for identification.
Step 2. Use inspection gloves (provided) to handle all crystal parts to avoid finger prints marks.
Step 3. Install 3 crystals (A) and 4 crystals (B) Use Top View crystal diagram (below) as a reference for correct pattern. Secure crystals with decorative nuts 6 attached on ring.
B
A
6
C
D
Step 4. Install 16 crystals (D) start from bottom center ball head screw with hole
7. Then 3 rings going up.
Step5. Install 8 crystals (C1) and 9 (C2) to Top Ring; alternate them as shown in Top View Crystal pattern below.
Turn Lights ON.
B
C2
7
C1
C2
B
C1
C2
C1
B
(All holes are for
Crystal strand D)
C2
C1
D
B
C1
C2
C1
B
Top View Crystal Pattern
B
C2
C1
C2
B
C1
C2
P2
Loading...
+ 1 hidden pages