ADC HD Rail User Manual

FlowCon Fabric Air Diffusers
HD Rail Installation Guide

204 Hallberg St.
PO BOX 507
Delavan, WI.
53115
INSTALLATION INSTRUCTIONS OVERVIEW
STEP ONE: INVENTORY STEP TWO: SUSPENSION HARDWARE
A) SINGLE SUSPENSION
B) DOUBLE SUSPENSION STEP THREE: INSTALLATION OF FABRIC DIFFUSER STEP FOUR: START UP WARRANTY CLEANING AND REPAIR
STEP ONE: INVENTORY
Before installing fabric diffuser system read all general information in the following sections. For best results use this manual in conjunction with the mechanical blue print or diffuser layout if supplied. Check the shipment carefully. Diffuser systems are shipped in polyethylene bags or boxes. Larger or­ders will be shipped in large skidded containers with individual contents in polyethylene bags or folded. All packages will be labeled with diffuser diameter and length. Make sure contents match the packing list. Note any missing or damaged pieces and notify your sup­plier before starting installation. Check length & diameters before installing & contact supplier before installation. (Not responsible for labor costs accrued from installing incorrect lengths or layouts.)
STEP TWO: SUSPENSION HARDWARE
The aluminum rail supplied comes in 10 foot sections. The orientation ( 12 o, clock ) suspen­sion should be 3” from the diffuser to where the vertical cable, (Speed Link), connects to the rail support bracket. Rail must be aligned with the centerline of the air flow. Determine the height of the rail. Rail must be supported level in order for the components to assemble prop­erly. Start from the air handler end of system and support rails with speed links from rail sup­port up to bar joist, eyebolts, beam clamps, etc. Because applications differ, what the cable can be anchored to is up to the installer. The supports slide into the top opening of the rail. It is recommended to use 2 supports per 10 foot rail. Support the next rail and connect it to the pre­vious with the rail couplers. Rail couplers slip into the center of each end of the rails. Slip Cou­pler in first rail and secure with zip screw in side of rail. Then slide next rail over coupler and bump end flush with first rail and secure with zip screw. Repeat this process until done.
CADDY SPEED LINK ERICO
CADDY SPEED LINK ERICO
When fabric fittings are incorporated in your installation, align rails with the centerline of the sys­tem. All rails must be installed at the same elevation. When elbows are used in the system rail should be installed as indicated as above. Rail bends and precut rail sections will be provided for suspension of the elbows. (Note: rail bends may come in two sections, a coupler may be needed to connect.) When tee’s or take offs are used install rails as above. Install rail perpendicular to main rail to suspend branch runs. To insure proper alignment the main of the fabric system can be installed to the rail and the air handler first. Then the cross rails perpendicular to the main can be installed to suspend the branch runs. If the take off port is top even all glides will be the same distance of the diffuser. If the take off port is centered on the side of the main, the glides are normally extended the same level as the glides of the main duct. Fittings may have quick connect joints such as zippers to ease the instal­lation and maintenance of the system.
CADDY SPEED LINK ERICO
Loading...
+ 2 hidden pages