Adaptec FS4100, FS4500, SC4100, FC4100 User Manual

2U STORAGE ENCLOSURE
QUICK INSTALL GUIDE
FS4100, FS4500, SC4100, AND FC4100

Kit Contents

Adaptec Storage Enclosure (FS4100, FS4500, SC4100, or FC4100)
CD, including software, drivers, and documentation
Two power cables

Installation Checklist

Read and follow the safety tips. See page 2.
Install the enclosure in an equipment rack or tower assembly
(optional.) See page 2.
Install the drive carriers. See page 6.
Set the drive slot and enclosure IDs. See page 7.
Connect the I/O cables. See page 7.
Connect the AC power cords to the APC modules. See page 11.
Follow the instructions in Next Steps on page 11.
1

Safety Tips

Caution: A fully loaded enclosure is heavy. Reduce the weight
!
of the enclosure by removing the drive carriers before installing the enclosure in the rack or tower. (You can also remove the two APCs to further reduce the weight, if required. See the Adaptec Storage Enclosure Installation and User’s Guide on the CD for instructions.)
Caution: To prevent personal injury, have someone assist you
!
during rack installation.
Caution: If you are installing your enclosure in a rack, prevent
!
personal injury and equipment damage by following the rack manufacturer’s safety instructions. Install your enclosure only in a rack that has been properly secured in an area with suitable environmental conditions.

Step 1: Installing into a Rack or Tower (optional)

Note: Mounting rails for rack installation are sold separately.
To purchase a rail kit, see your Adaptec reseller.
Required tools:
Phillips-head screwdriver
Wrench for tightening nuts (if your rack does not have threaded
holes)
If you are not installing your Storage Enclosure into a rack or tower, skip to Step 2: Installing the Drive Carriers on page 6.
To install your Storage Enclosure into an rack, see page 3.
To install your Storage Enclosure into a tower assembly, see
page 5.
2

Installing into an Equipment Rack

Begin the installation by removing the components from the packaging and placing them on an antistatic surface until you need them.
Ensure that you have all these rail kit components:
Front rails (1 left, 1 right)
Rear rails, two different sizes (2 left, 2 right)
Two sizes of screws (10 large, 4 small)
Two types of nuts (10 of each)
To install your Storage Enclosure in an equipment rack:
1 Secure the front rails to the front supports of the rack, using the
supplied screws, as shown below.
Note: Use either the speednuts or cagenuts provided if your rack does not have threaded holes.
2 Check the length between the front and rear supports of your
equipment rack and determine which set of rear rails to use, the long or the short.
3
Loading...
+ 9 hidden pages