Zuwa Solarcheck Mobilcenter UNISTAR 2000-A, Solarcheck Mobilcenter UNISTAR 2000-B Operating Instructions

-Zumpe GmbH
Pumps and Sprayers
Operating Instructions
Solar Filling Unit
SOLARCHECK MOBILCENTER UNISTAR 2000-A SOLARCHECK MOBILCENTER UNISTAR 2000-B
ZUWA SOLARCHECK MOBILCENTER
Operating Instructions Solarcheck Mobilcenter UNISTAR 2000-A Solarcheck Mobilcenter UNISTAR 2000-B
Content
1. Declaration of conformity................................................................................ 3
2. Introduction .................................................................................................... 3
2.1 Legend ....................................................................................................... 3
2.2 General safety instructions ......................................................................... 4
3. Transportation and unpacking........................................................................ 5
4. Mounting and commissioning......................................................................... 6
5. End of operation............................................................................................. 8
6. Maintenance................................................................................................... 8
6.1 Connections................................................................................................ 8
6.2 Cleaning the filter........................................................................................ 8
6.3 Disassembling the pump ............................................................................ 9
6.4 Replacing components ............................................................................... 9
6.5 Assembling the pump ................................................................................. 9
7. Troubleshooting ........................................................................................... 10
8. Accessories.................................................................................................. 11
9. Parts lists ..................................................................................................... 12
9.1 Solarcheck Mobilcenter UNISTAR 2000-A ............................................... 12
9.2 Solarcheck Mobilcenter UNISTAR 2000-B ............................................... 14
10. Technical data.............................................................................................. 16
2
ZUWA SOLARCHECK MOBILCENTER
1. Declaration of conformity
The product complies with the requirements of the applicable european directives. The conformity was declared. The documents to which the declaration relates and the original declaration of conformity are available at the manufacturer.
2. Introduction

Intended use

The filling unit is designed for filling, flushing and venting thermal solar systems and heat pump systems. Any other use or extended use is considered to be improper. The manufacturer is not liable for any resulting damage.
Notes on the documentation
This manual provides important information for a safe and correct operation of the solar filling unit Solarcheck Mobilcenter UNISTAR 2000-A and Solarcheck Mobilcenter UNISTAR 2000-B. The manual is designed for qualified personnel who are trained and specialised in installing heating systems. Service and maintenance works must only be carried out by approved specialists.
Subject to technical modifications
The continuous development and improvement of our products may cause minor modifications of technical data and illustrations.
2.1 Legend
Danger: immediate danger of death and severe injury
Danger: danger of death from electric shock
Danger: danger of scald burn
Danger of environmental and material damage
Information, note
3
ZUWA SOLARCHECK MOBILCENTER
2.2 General safety instructions
Store these instructions in such a way that they are accessible at all times for operating personnel!
In addition to these operating instructions the following documents of related components and of the pumping media should be applicated:
technical specifications material safety data sheets operating instructions
Danger
Danger
Danger
Warning
The manufacturer shall not be held liable for damage resulting from non­adherence to the operating instructions.
Danger of death due to electric shock
> Prior to work on the pump, always disconnect the drive from the
power supply.
Danger of death due to explosion
> Do not pump any liquids with a flash point of less than 55 ° C. > Do not pump petrol or solvents.
Danger of scald burn due to high media temperature
> Fill the solar system only when cold – if necessary cover the solar
collectors.
Danger of burn due to hot motor casing
> Do not block neither suction nor pressure hose more than 1 minute
to avoid overheating of the motor.
Danger of injury due to splashing liquid
> Connect the hoses tightly to the pump.
4
ZUWA SOLARCHECK MOBILCENTER
Material damage due to dry running
> Never allow the pump to run dry for more than 1 minute.
Caution
Material damage due to tilting of the cart on uneven ground
> Operate the filling unit only on even ground.
Danger of environmental damage due to hazardous pumped media
> Collect escaping pumped media and dispose of according to the
locally applicable regulations.
Material damage due to improper storage
> Prior to extended periods of pump down time clean pump to avoid
adhesions and damage to the impeller.
> Store pump under frost-protected conditions.
3. Transportation and unpacking
> After unpacking, immediately check the filling unit for completeness and damage. > Immediately report any transit damage to the supplying company. > Dispose of packaging material according to the respective local regulations.
5
ZUWA SOLARCHECK MOBILCENTER
4. Mounting and commissioning
1. Connect filling hose to pump outlet.
1
3
2
3. Connect filling hose (1) and return hose (2) to the fill/vent valves and open valves. Close stop valve (3).
2. Connect return hose to tank.
4. Fi .
ll tank and open ball valve
5. Insert cable of pump motor into socket.
6. Switch on pump.
6
ZUWA SOLARCHECK MOBILCENTER
7. Open tank lid to ensure the circulation of the air.
Caution: Monitor fluid level in the tank and, if necessary, refill heat transfer fluid to prevent air entering the solar circuit.
8. Flush the solar circuit with the fluid. Check at the vision panel of the filter or through the tank opening if there are still air bubbles in the heat transfer fluid. Continue flushing until there is no air remaining in the fluid.
7
ZUWA SOLARCHECK MOBILCENTER
5. End of operation

After filling and flushing the solar system:

> Switch off pump. > Close fill and vent valve (1+2) at the solar s > p valve (3) between fill and vent valve.
Open sto
u
Ca tion: Collect escaping pumped media in a
container.
Only Solar
By opening the drain valve at the pump outlet you ca generated between pump outlet and fill valve when flushing the pipe:
> Turn the green handwheel of the drain valve at the pump outlet an
Afte filling hose easily from the fill valve.
Solarcheck Mobilcenter all types:
> Unscrew filling hose and return h > Screw open hose ends together with the provided connecting
check Mobilcenter UNISTAR 2000-A:
remaining liquid run out.
r that you can unscrew the
ose from fill and vent valve.
avoid dripping or escaping of fluid during transport.
tation.
n release the pressure that is
3
piece in order to
6. Maintenance
Danger of death due to electric shock
Dange
> Prior to work on the pump, always dis
r
supply.
connect the drive from the power
1
2
d let the
Danger of environmental damage due to hazardous pumped media
Caution
applicable regulations.
6.1 Connections
> Check regularly if hose couplings are tight.
6.2 Cleaning the filter
There is a built-in fine filter on the welder residues. Check the vision panel at the filter regularly and clean the filter when you see dirt deposits on the strainer.
> Screw off the filter casing, remove the st
or compressed air.
suction side of the pump to filter out sold and
rainer and clean both with rinsing water
8
lly > Collect escaping pumped media and dispose of according to the loca
ZUWA SOLARCHECK MOBILCENTER
6.3 Disassembling the pump
1. Disconnect line connections
2. Unscrew bolts on the pump side
3. Remove cover and side disc
4. Pull housing with impeller and rear side disc off the shaft
6.4 Replacing components
Impeller
To change the impeller we recommend to use a special tool. See chapter 8, Accessories.
> Push impeller out of the casing > Insert a new impeller. Observe direction of
impeller wings (see adjacent illustration): Impeller wings must be bent to the opposite side of the rotating direction.
Lateral discs
> Turn around or replace
Seals
> Replace O-rings and push firmly into the recesses
Replacing shaft gasket:
1. Remove retaining ring with suitable pliers
2. Push out bearing and shaft gasket
3. Push in new shaft gasket and bearing
4. Insert retaining rings
Intake
Outlet
6.5 Assembling the pump
Assembly of the pump is the reverse of disassembly – see exploded drawing.
1. Connect lateral disc with punched hole to the rear of the casing
2. Push casing with impeller and second lateral disc onto the shaft
3. Insert and tighten bolts
4. Attach lines
The lateral discs and O-rings must lie precisely in the recesses to ensure that the O-rings are not pinched.
9
ZUWA SOLARCHECK MOBILCENTER
7. Troubleshooting
Fault Possible cause Remedy
Pump does not take in liquid
Pump does not build up pressure
Liquid escapes from the pump
Pump does not start
Intake line is not leaktight Seal connection or line
Impeller worn or damaged Replace impeller
Suction line or foot valve is blocked
Pressure line closed or blocked
Ball valve at the tank outlet closed or tank empty
Impeller or lateral discs are worn
Filter clogged Clean filter (see chapter 6,
Ball valve at the tank outlet closed
Shaft gasket or O-ring is missing or defective
Impeller blocked Fill pump with the medium to
Impeller clogged up or macerated
Motor defective Have motor checked by
Clean suction line or foot valve
Open fittings on the pressure side or clean pressure line
Open ball valve or fill tank
Replace impeller or lateral discs
Maintenance)
Open ball valve
Check whether part is in place and insert or replace defective component
be pumped
Use an impeller appropriate to the medium
specialist personnel and have repaired if necessary
10
ZUWA SOLARCHECK MOBILCENTER
8. Accessories
Multifunction valve with bypass for mixing the heat transfer medium on-site Kit for filling ground loops including two 150 litre tanks, hose extension, additional
stop valves and multifuncion valve to switch the suction line from external tanks to internal tank
Remote control with 10 metre cable Tool for changing the impeller
A useful tool to install the impeller easily into the casing. Suitable for all ZUWA impellers. Order No.: 110 124 00
tool for changing the impeller
11
ZUWA SOLARCHECK MOBILCENTER
9. Parts lists
9.1 Solarcheck Mobilcenter UNISTAR 2000-A
30
60
40
20
80
Pos.: Part / Designation Code Number
10 Chassis 13405110BT 1
20 Inflatable wheel 80120 2 30
30 litre tank
40 Steam suction hose 13 x 6 30026 1
60 Steam hose 13 x 6 3 m 131123 2
70 T-piece brass 3 x ¾“ internal thread 80110 1
71 Reducer plug ¾"- " internal thread 132236 1
72 Drain valve ⅜" 132232 1
73 Threaded nipple brass ¾" x ¾" external thread 131215 1
80 Pressure pipe filter series 324-o ½" int. thread 53240T0235 1
71-73
70
10
13405 1
12
ZUWA SOLARCHECK MOBILCENTER
260
230
220
210
200
140180
130
150
250
240
Pos.: Part / Designation Code Number
110 Hexagon screw M5 x 55 70031 4
120 Front plate 11012002 1
130 Lateral disc – stainless steel 11012009 1
140 O-ring 56-2 NBR 80003 3
150 Perbunan impeller narrow with brass bush 11012907 1
160 Housing UNISTAR-A small 11012001 1
170 Lateral disc stainless steel with hole 11012709 1
180 Rotary shaft seal NBR 14 x 26 x 7 80537 1
190 Locking ring I 26 x 1,2 70284 1
200 Rear plate 12000502 1
210 Fitting key A 3 x 3 x 16 70315 1
220 Control box 80628 1
230 Handle for CEG motor 14000202 1
240 Motor base FUSS00071 1
250 Fan cover for CEG motor 80621 1
260 Motor 230 V; 0,37 kW; 2800 rpm 80607 1
190
170
160
140
120
110
13
ZUWA SOLARCHECK MOBILCENTER
9.2 Solarcheck Mobilcenter UNISTAR 2000-B
30
60
40
70
80
20
90
10
Pos.: Part / Designation Code Number
10 Chassis 13405110BT 1
20 Inflatable wheel 80120 2
30 30 litre tank 80105 1
40 Steam suction hose 19 x 7 30028 1
60 Steam hose 19 x 7 3m 30087 2
70 Threaded nipple 1“ internal x ¾“ external thread 131062 1
80 Pressure pipe filter series 324-o ½" internal thread 53240T0235 1
90 Reducer plug 1" internal x ½" external thread 52452024 1
14
ZUWA SOLARCHECK MOBILCENTER
260
230
220
190
210
250
240
200
Pos.: Part / Designation Code Number
110 Hexagon screw M5 x 75 70312 4
120 Front plate 11012009 1
130 Lateral disc – stainless steel 11012009 1
140 O-ring 56-2 NBR 80003 3
150 Perbunan impeller wide with brass bush 11012910 1
160 Housing UNISTAR-B 11013008 1
170 Lateral disc stainless steel with hole 11012709 1
180 Rotary shaft seal NBR 14 x 26x 7 80537 1
190 Locking ring I 26 x 1,2 70284 1
200 Rear plate 12000502 1
210 Fitting key A 3 x 3 x 36 70317 1
220 Switch box motor 80628 1
230 Handle for CEG motor 14000202 1
240 Motor base FUSS00071 1
250 Fan cover for CEG motor 80621 1
260 Motor 230 V; 0,55 kW; 2800 rpm 80606 1
140
180
170
160
130
150
120
110
15
ZUWA SOLARCHECK MOBILCENTER
10. Technical data
Solarcheck Mobilcenter
Voltage 230 V 230 V
Frequency 50 Hz 50 Hz
Maximum power consumption 370 W 550 W
Maximum fluid temperature 80 °C 80 °C
Approved pumping media water, heat transfer medium
Maximum operating pressure 4 bar 4 bar
Maximum flow rate with water / heat transfer medium
Diameter return hose / pressure hose Inch ½ / ½ Inch ¾ / ¾
Tank content 30 L 30 L
UNISTAR 2000-A UNISTAR 2000-B
30 / 27 L/min 60 / 55 L/min
Motor protection class IP 55 IP 55
Dimensions (height/width/depth) 985/495/555 mm 985/495/555 mm
Weight without packaging (empty tank)
21 kg 23 kg
16
ZUWA SOLARCHECK MOBILCENTER
17
ZUWA SOLARCHECK MOBILCENTER
18
ZUWA SOLARCHECK MOBILCENTER
19
ZUWA-Zumpe GmbH
Franz-Fuchs-Straße 13 - 17 • D-83410 Laufen
Fon: +49 8682 8934-0 • Fax: +49 8682 8934-34
e-Mail: info@zuwa.de • Internet: www.zuwa.de
© 2008 ZUWA
Position Part / Designation Code Number
10 Chassis 13405110BT 1 20 Inflatable wheel 80120 2 30 30 litre tank 13405 1 40 Steam hose extension 13 x 6, 3m complete 131123 2 50 T-piece brass 3 x ¾" internal thread 80110 1 51 Reducer plug ¾" - Ǫ" internal thread 132236 1 52 Drain valve Ǫ" 132232 1 53 Threaded nipple brass ¾" x ¾" external thread 131215 1 60 Spare filter with suction line UNISTAR 2000-A (Pos.61-65) 13405220 1 61 Filter pressure line, series 324-o ½" internal thread 8105042 1 62 Extension piece with ¾" internal and external thread 52452033 1 63 Bent hose connection ¾" external thread 8011201 1 64 O-Ring 26-3 80011 2 65 Steam suction hose SMC UNISTAR 2000-A 13 x 6 30026 1
Parts List Solarcheck UNISTAR 2000-A
Parts list
10
50-53
30
20
40
65
62
63
64
61

Parts List Solarcheck Mobilcenter UNISTAR 2000-A

Position Part/ Designation Code Number
110 Hexagon screw M5 x 55 70031 4 120 Front plate 11012002 1 130 Lateral disc - stainless steel 11012009 1 140 O-ring 56-2 NBR 80003 3 150 Perbunan impeller narrow / polyamide bush 11012909 1 160 Housing UNISTAR-A small 11012001 1 170 Lateral disc with hole - stainless steel 11012709 1 180 Rotary shaft seal NBR 14 x 26 x 7 80537 1 190 Locking ring I 26 x 1,2 70284 1 200 Rear plate 12000502 1 210 Fitting key A3x3x16 70315 1 220 Control box 80628 1 230 Handle for CEG motor 14000202 1 240 Motor base FUSS00071 1 250 Fan cover for CEG motor 80621 1 260 Motor 230 V; 0,37 kW; 2800 rpm 80607 1
Parts list pump
130
110
140
150
160
140
170
140
180
190
120
200
210
260
230
220
240
250
ZUWA-Zumpe GmbH Pumps and Plant Protection Equipment
Franz-Fuchs-Straße 13 - 17 • D-83410 Laufen Fon: +49 8682 89340 • Fax: +49 8682 893434 E-mail: info@zuwa.de • Internet: www.zuwa.de
© ZUWA 2009
Loading...