
Reason why ( missing, scratched, broken glass, bent, bad finish)
PARTS & ASSEMBLY SHEET
This fixture assembled PO:__________ Date: ________
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Read and review installation instruction sheet
before assembling the fixture.
1. Place the Glass (J) put in the fixture's Canopy (F),
counterclockwise rotation on until tight.
(DO NOT EXCEED MAXIMUM WATTAGE RATING! )
Notice: Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for
replacement parts.
PARTS LIST
Mounting screw Mounting screw
1ea
L4"*H1.5mm
Hex nut Wire connnector Deco Nut
Part Needed Quantity
2ea 8/32-IP*H1"
3 ea P4 Orange
2ea
8/32-IP*H1-1/2"
2ea 10x 9.5mm
FIXTURE ASSEMBLY INSTRUCTIONS
with on glass mouth scoop channel and fixture's
Canopy inside of salient point coordination,
For Customer Service, contact t he place of purchase to arrange for replacement parts.

For Customer Service, contact the place of purchase to arrange for r eplacem ent parts.
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE (Fig. 1)
from wall, including the old mounting strap.
Mounting Screws (A) are vertical.
two Mounting Screws (C). Tighten the screws securely .
CONNECTING THE WIRES (Fig. 2)
9. Tuck these wire connections neatly into the junction box.
INSTALLATION INSTRUCTIONS
FINISHING THE INSTALLATION (Fig. 3)
TO THE JUNCTION BOX AND TEST THE FIXTURE.
BARE COPPER
(Ground)
GREEN
(Ground)
FIXTURE WIRES
SMOOTH (BLACK)
RIBBED (WHITE)
BLACK
WHITE
HOUSE WIRES
A
B
C
D
E
OUTLET
BOX
(CEILING)
1. Carefully remove the new fixture from the carton and the
yellow bag that holds all your parts. Check that all parts are
included as shown in the illustration and parts list.
2. Shut off power at the circuit breaker and remove the old fixture
3. Mounting Strap (B) contains several pairs of threaded holes.
Find the pair of holes that matches the holes spacing in your
Canopy (F) and thread the two Mounting Screws (A) halfway into
the Mounting Strap (B).
4. Place the Mounting Strap (B) over the junction box so the
5. Attach the Mounting Strap (B ) to the junction box by using the
6. Take the black wire from the ceiling junction box and the
smooth wire leg from the fixture and twist bare ends together.
Twist wire connector onto end of wires until snug.
7. Repeat same process with white junction box wire and ribbed
wire of fixture.
NOTE: Twist wires together in the same direction y ou twist the
wire connector onto wires.
8. If your junction box has a grounding wire (green or bare
copper), attach this wire and the bare copper wire from the fixture
together as in step 7. If junction box has no ground wire, att ach
the bare copper fixture wire to the junction box with a screw.
For Flush Mount Light Fixture
10. Place the fixture’s Canopy (F) over the Mount i ng S t rap (B )
and over the Mounting Screws (A). Adjust the fixture canopy until
the Mounting Screws (A) protrude out from the canopy. Secure
the fixture against the ceiling by t hreading the Decorative Nuts (E)
on until tight.
11. Install the light bulbs and glass shade according to the fixture
assembly sheet.
YOUR INSTALLATION IS NOW COMPLETE. RETURN POWER