Zip HT4786 Quick Guide

Quick Start Guide
A1
A2
B
801599 - HydroTap User Guide - Nov 2013 UK - V1.05 Page 1 of 20
801600 - Zip Quick Start Guide - October 2013 - V1.06
1 x Mounting
1 x Kickboard
1 x Door vent
1 x front vent grill
Booster heater
(Supplied with 240/175 models)
QUICK START GUIDE
Note: This quick start guide must be read in conjunction with the main installation and user instructions
Ensure the underbench can support the product weight when full of water,
Before installing ensure the following have been provided at
with these Installation Instructions. Refer to technical specification for dimensions. If required, make allowance for a booster heater. (Refer to the main book, for detailed
reach of the flexible braided hose and positioned so that the connection point and the
required. (One GPO is for the Zip HydroTap and the other for the Booster heater).
NOTE: Check the cable lengths and outlet positions before proceeding.
For the mains pressure All-IN-ONE, both a hot and cold water supply will be required.
STEP 1-
Prepare and fit the Taps
Hole positioning: Position the tap such that it dispenses into
the sink bowl with ample clearance for a cup or tea pot. Alternatively, the tap could be mounted away from the sink using a Zip Font, avail- able as an accessory.
Apply a light smearing of silicon sealant on the underside of the upper spacer to ensure a watertight t.
For HydroTap and Mixer taps
cut a 35mm hole in the bench / sink top.
BENCH TOP
Ø35mm
HydroTap Tap
Mixer Tap
4-in-1
(If required)
NUT
LOWER RUBBER
WASHER
UPPER RUBBER
WASHER
WASHER
BRAIDED HOSE x 3
UPPER RUB- BER WASHER
LOWER RUB- BER WASHER
WASHER
NUT
White Hose Ext. Mains
Blue band Mixer IN
Red band Mixer Out
O-RING
BASE BLOCK SPIDER
BASE BLOCK NUT
USB CABLE
ALL THREAD ROD
NOTE: feed each of the tubes and elec- trical cable evenly in between the legs of the BASE BLOCK SPIDER.
All-In-One Tap
(If required)
For AIO mains and vented Taps
Cut a 50mm hole in the bench / sink top.
NOTE: make sure the tap location will allow the nozzle to drain into the sink.
SINK TOP
50mm
ALL THREAD
ROD
STAINLESS STEEL WASHER
SPIDER CLAMP
NUT
BLACK PLASTIC SPACER
NOTE: feed each of the three tubes and electrical cable evenly in between the legs of the SPIDER CLAMP when installing.
Fit the STAINLESS STEEL WASHER, SPIDER CLAMP, AND 6mm NUT.
6mm NUT
SPIDER CLAMP
Stainless washer
Black plastic spacer
35mm dia hole
Sink
O-RING
SINK TOP
Fit the O-ring to the underside of the AIO tap then pass all hoses through the 50mm hole.
Chiller connection BLUE
From Mixer OUT to Tap - Vented version only
Boiler connection RED
Blue ring on RHS mains IN to
Mixer IN
White ring on LHS to
Mains in
Tap
O ring Base
Clear tube to Vent
Quick Start Guide
This Quick start guide must be read in conjunction with the Installation instructions and User
This Quick start guide must be read in conjunction with the Installation instructions and User
guide.
guide.
Before proceeding, read the Installation instructions and User guide
Check all the components are present and correct.
Check that you have all the necessary tools.
Ensure the under-counter cupboard floor can support the product weight when full of
water,(check the specifications in the Installation instructions and allow an extra 3kg when full of water).
Prior to installation, ensure that the following have been provided at the installation site.
Step 1-
Prepare and install the taps. (For All-in-One and Arc / Cube taps see the Installation
instructions).
HydroTap®G4 Classic & Elite tap installation
Ø35mm hole
Black plastic
spacer
Step 2-
Prepare the ventilation.
Ventilation
Ventilation for all models
The clearance envelope dimensions stated in the specification sheets and installation instructions must be observed.
Adequate ventilation must be provided to ensure that the cupboard space temperature does not exceed 350C.
Preferred arrangement
Sufficient space in the cupboard to install the Command-CentreTM and it’s ancillary components. Refer to the Technical specification of the Installation instructions for dimensions. If required, make allowance for a booster, (refer to the Installation instructions for details).
A potable water supply connection with min / max working pressures of: (refer to the Technical specification of the Installation instructions for specific model information).
An isolating valve inside the cupboard within reach of the flexible braided hose and positioned so that the connection point and the stop cock will not be obstructed when the Command-Centre
®
For Zip HydroTap
G4, a single 220-240V AC, 13A socket is required.
TM
and it’s ancillary components are installed.
For Zip HydroTap®G4 + Booster, two 220-240V AC, 13A sockets are required. (One socket is for the Zip HydroTap®G4 and the other for the booster).
Note Check the cable lengths and outlet positions before proceeding and ensure that the
tap location will allow the tap spout to drain into the sink.
TM
The Command-Centre
and booster must be mounted in upright positions, with
their base mounted horizontally, as shown overleaf.
IMPORTANT!
Do not proceed with the installation if these requirements are not met.
Parts supplied Description Parts supplied Description
®
ZIP HydroTap
User Guide
Tap Operation...................(Pages 2-5)
LCD Screen & Menu .......(Pages 6-18)
Maintenance.................... (Pages 18-20)
Date of Installation.........
1 x User guide and
BC160/125G4 BC240/175G4 BCH160/125G4 BCH240/175G4 AV160/125G4 AN160/125G4 AV240/175G4 AN240/175G4
1 x Quick start guide
Affix Model Number Label
Here
801599
1 x Installation
1 x Restrictaflow
valve and T-piece
(supplied with
vented mixer taps)
1 x Booster inc.
connection hoses
(supplied with mixer
instruction
tap models)
1 x HydroTap®G4*
Classic, Elite or Arc / Cube
1 x Mixer tap*
Classic, Arc or
Cube
1 x
Command-
TM
Centre
with air
and water filters
Before proceeding, read the installation and user instructions
Check all the components are present and correct.
Check that you have all the necessary tools
(Check the specifications in the main book and allow an extra 5-8kg when full. )
the installation site:
Sufficient space in the cupboard to install all of the undersink units in accordance
installation instructions).
A potable water supply connection with isolating valve inside the cupboard within
stop cock will not be obstructed when all the undersink units are installed.
For Zip HydroTap 160/125 &160/175 models, a 220-240Vac, 10A GPO will be required. For Zip HydroTap 240/175 models, two 220-240Vac, 10A GPOs will be
A potable cold water supply with a minimum working pressure of 172kPa and a maximum working pressure of 700kPa connected via an isolation valve.
The undersink appliances must be mounted in upright positions as shown in the
diagrams.
IMPORTANT!
Do not proceed with the installation if these
requirements are not met.
Parts Supplied Description Parts Supplied Description
1 off Hydrotap Tap and hoses
1 off Undersink Unit
with air and water-
filter
1 x Restrictaflow valve and Tee piece for Mixer
Taps
1 off Mains water connection hose
Duct kit 1x Air Duct
plate
Vent kit
louvre
louvre
1 off HydroTap
and hoses
All thread
Stainless steel
rod
stainless steel
Black
washer, spider
plastic
spacer
Stainless
steel
washer
Spider
clamp
6mm nut
HydroTap®G4 & Elite taps cut a 35mm hole in the
work / sink top.
Note Feed each of the tubes and USB cable evenly in between
the legs of the spider clamp during installation.
Hole positioning Position the tap such that it dispenses
into the sink bowl with ample clearance for a cup or tea pot. Alternatively, the tap could be mounted away from the sink using a Zip Font, available as an accessory.
Apply a light smearing of silicon sealant on the
underside of the spacer to ensure a watertight t.
Mixer tap installation
Upper rubber
washer
washer
Fit the
clamp, and
6mm nut.
Upper rubber
washer
Spider
clamp
6mm nut
Ø35mm
hole
4mm door buffers (at the four corners of each door) supplied with the Command-Centre
TM
should be used to provide adequate ventilation in normal usage, (as shown in the adjacent illustration).
Door buffer
For applications where the cupboard space temperature is near 350C or higher,
a vent kit (SP91545) must be used to provide ventilation by convection. See arrangements below for details.
Alternative arrangement
Note The vent kit has to be installed in a way that allows air to be drawn in from the
bottom of the cupboard and expelled through the top of the cupboard. The outlet vent should be towards the top of the door (position A1) or side of the cupboard (position
A2). (Where possible air inlet vent and the air outlet vent should be positioned at
opposite ends of the same cupboard space).
Vent cut-out details
1 x Mains water
connection hose
* Tap options supplied are dependant upon configuration purchased.
802259UK - Residential Boiling (& ambient) - Quick start guide - August 2015 - V2.01
Lower rubber
washer
Washer
Nut
Braided
Hose x 3
Mixer taps
cut a 35mm hole in the work / sink top.
Lower rubber
washer
Washer
Nut
White marking -
Ambient mains
supply
Blue marking -
MIXER IN on
Command-CentreTM.
Red marking -
MIXER OUT on
Command-Centre
TM
.
A1 or A2 Air outlet vent
B Air inlet vent
Step 3 -
Install the booster (if required).
Step 4-
Installing the Command-CentreTM.
Booster system
Note 1 Water connection.
Blue cap - water in. Red cap - water out. The braided hoses cannot be lengthened.
Note 2 Position the booster
according to the flexible hose and cable lengths supplied. Keep the booster as close as possible to the Command-
TM
Centre
Note 3 Ensure the booster
heater is mounted in an upright position (as shown) with a horizontal base.
Remove the mounting chassis for wall mounting.
inlet / outlet fittings.
Tilt Forward Lift UP
Release
Strainer
Cold water connection
(inlet,3/8”
BSP)
Hold the hexagon while tightening the braided hose fittings.
mount base horizontally
Braided hoses
Hot water connection (outlet,3/8”
BSP)
Command-CentreTM installation
Example HydroTap®G4 Classic boiling ambient model
Elite Classic
BRAIDED
MAINS
IN
MIXER
OUT
MIXER
IN
535mm
50mm
Arc / Cube
RED
BOILING
OUT
Clearance Envelope
280mm
Note Connect the mains water braided hoses to
the Command-Centre
CLEAR
BYPASS INVENT
Note All silicon tubes / plastic pipes must
be cut to size. They must have a constant
fall back to the Command-CentreTM.
50mm
TM
before locating in place.
BLUE
OUT
AMBIENT
OUT
BYPASS
Note
mains water braided
hose length is
750mm.
Electrical power
cable length is
1800mm.
Position the
Command-CentreTM
according to the
hose and cable
lengths supplied.
Note The braided hose and connection tubes cannot be lengthened.
Step 5-
Commissioning.
Commissioning
To set the language
Press the [Language] button for main menu.
Select [English] of [Deutsch].
Initial commissioning screen
Language selection screen
USB
Ambient
POWER
CABLE
Commissioning
Have a bucket or similar container (not supplied) at the ready to hold a quantity of water that will be ejected while the filter flush mode is in operation. Open the filter access door on the front of the Command-CentreTM and the filter cartridge will be exposed. Located to the rear right hand side of the cartridge is a flush line, approx 600mm long, and the flush line stop cock. Place the free end of the flush line into the bucket or container (not supplied).
at first commissioning, the system will select the filter flush screen automatically.
Turn the flush stop cock on.
Press [START] button to start filter flush.
Allow at least 10 litres of water to flush through the filter.
Once the filter flush is finished, turn the flush stop cock off then press [STOP] to end filter flush mode.
Press [NEXT] and the screen will display the flow calibration screen.
Press the [START] button and the tank will first empty then fill. Upon completion the pulse count will be displayed. Check this reading is within the limits.
Press [NEXT] for the boiling calibration screen.
Press the [Calibrate] button and the system will commence the boiling calibration procedure. This will take approximately 5-6 minutes.
Upon completion, a booster reminder screen will appear and allow you to return to the home screen by pressing the [HOME] button.
Check the date and time settings, see section G of the User guide.
To enable the booster (if fitted).
Press the [MENU] button for main menu.
Press the [Install] button.
Press the [Boost] button.
In the next screen select [YES] to
enable the booster.
Water must be run through the booster
for a minimum of 30 seconds, before the heater is activated.
Dispense boiling water for 30 seconds
and check the booster outlet hose is warm when the boiling water tank is replenishing.
OPEN Position
ON
Stop cock
OFF
CLOSED Position
Zip
Boiling
Prepare filter flush as per instructions
and press START
START
Zip
Boiling
To calibrate, touch START button
Empty / Filling
START
Zip
Boiling
Boiling Water
97.5
Steam Vent
53.0
Zip
Boiling
If a BOOSTER is installed,
enable in < INSTALL > Menu
HOME
Zip Boiling
03:01 PM, TUE 12, Feb 2013
NEXT
03:01 PM, TUE 12, Feb 2013
Pulses/L (360 - 440)
NEXT
03:01 PM, TUE 12, Feb 2013
Calibrate
EL
03:01 PM, TUE 12, Feb 2013
STOP
To start
press
Calibrate
button
802259UK - Residential Boiling (& ambient) - Quick start guide - August 2015 - V2.01
Loading...