Zip 5053UK, 5061UK, HydroTap G4, 5261UK, 2924UK Installation Instructions Manual

...
1
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
VENTILATION
IS ESSENTIAL
‘VENTILATION’
BEFORE YOU START
Installation instructions
Zip HydroTap G4
The Worlds most advanced Drinking Water Appliance
Model :
Command Centre (see table of contents for specific models)
®
2
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Tap options
The G4 series offers a range of interchangeable taps to suit the customer's needs.
Classic range
Arc / Cube range
Elite range
All-in-One range
Mixer range
These standalone taps offer instant boiling, chilled and sparkling water* and are directly compatible with the G4 Command Centre.
The All-in-One tap may be used as alternatives to the above HydroTap and mixer tap combinations*.
The mixer tap range may be used in conjunction with any of the above to provide mixed hot and cold water for sanitary use*.
Celsius range
The Celsius range offer instant boiling, chilled and sparkling / boiling and chilled / boiling and ambient / chilled and sparkling / chilled or boiling* water together with the an integral mixer to provide mixed hot and cold water from the mains.
*Dependant upon model purchased.
3
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
HydroTap G4 specifications
Installation check list .................................................................................................................... 4
General product features ............................................................................................................. 5
Important safety instructions ........................................................................................................ 6
Warnings and regulatory information ........................................................................................... 7
Major components and accessories ............................................................................................. 8
Tap - Command Centre compatibility ........................................................................................... 9
Technical specifications ............................................................................................................... 11
Before installation and site requirements ..................................................................................... 12
Installation instructions Step 1 -
Measure and cut all the tap holes, fit the taps : Refer to 803341UK Tap installation instructions.
Step 2
- Check for adequate ventilation.
Section 1 - Ventilation.
Section 1.1 - 1.9 Ventilation for all models ................................................................................... 13
Step 3
- Install the booster / scale filter / water block / carbonation valve (if required).
Section 2 - Booster installation ..................................................................................................... 21
Section 3 - Scale filter installation ................................................................................................ 24
Section 4 - CO2 cylinder installation ............................................................................................. 25
Section 5 - Water block installation .............................................................................................. 27
Section 6 - Carbonation valve installation .................................................................................... 29
Step 4
- Install the Command Centre.
Section 7 Commercial & residential Command Centre installation.
Section 7.1 - Generic Command Centre installation instructions ................................................. 30
Section 7.2 - External bypass valve ............................................................................................. 31
Section 7.3 - 5253UK & 5053UK BCS commercial installation .................................................... 33
Section 7.4 - 2957UK, 2857UK, 1456UK & 1256UK BCS comm. and res. compact installation . 38
Section 7.5 - 5261UK & 5061UK BC commercial installation ...................................................... 43
Section 7.6 - 2924UK, 2824UK,1414UK & 1214UK BC comm. and res. compact installation .... 48
Section 7.7 - 5200UK, 5201UK, 5000UK, 5001UK 1500UK, 1501UK, 1300UK,1301UK
BO, BA installation ....................................................................................................................... 53
Section 7.8 - 0053UK CS commercial installation ........................................................................ 60
Section 7.9 - 0061UK C commercial installation .......................................................................... 63
Section 7.10 - 0056UK CS residential installation ........................................................................ 66
Section 7.11 - 0015UK C residential installation .......................................................................... 69
Step 5
- Commission the HydroTap G4.
Section 8 - Commissioning
Section 8.1 - Generic commissioning instructions ....................................................................... 72
Section 8.2 - Select the language ................................................................................................ 72
Section 8.3 - CO2 purge ............................................................................................................... 72
Section 8.4 - Filter flush ............................................................................................................... 73
Section 8.5 - Boiling calibration .................................................................................................... 73
Section 8.6 - Booster enable ........................................................................................................ 73
Section 8.7 - Safety sensor calibration ......................................................................................... 74
Section 8.8 - System flush ........................................................................................................... 74
Trouble shooting
Trouble shooting table .................................................................................................................. 76
End of life disposal ....................................................................................................................... 77
Warranty ....................................................................................................................................... 78
Contact details ............................................................................................................................. 80
Table of contents
4
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Before installation
Read the instructions and check if there is adequate space to install all of the components.
• Note Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
Check the mains water pressure is within min / max requirements (see page 11).
Check the water quality to determine if extra filtration will be required.
• Note This product must be fitted to a wholesome water supply.
Check the Command Centre rating plate and ensure correct power is available.
Check the under counter cupboard floor supporting the Command Centre is adequate for its total weight, when full of water.
Before commissioning
Check the system has been installed correctly.
Check all plumbing fittings for water tightness.
Ensure the outlet and vent pipes are positioned to drain correctly.
Ensure there is adequate ventilation.
Check all tubes and pipes from the Command Centre to the tap have a constant rise and there are no sags or kinks in the hoses.
Check all electrical connections are correct and there are no loose wires.
Commission (see section 8)
Flush the supply line before connecting.
Turn on the water and check for leaks.
Flush the filter(s).
Activate / enable the booster (if fitted).
Calibrate the safety sensor for boiling models.
Where applicable, programme the Command Centre to suit the customer’s requirements.
Installation checklist
5
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Thank you for purchasing a Zip HydroTap G4. Please read and follow these instructions carefully to ensure safe and trouble free operation. If help and advice is required, please call 0345 6 005 005.
What is the Zip HydroTap G4 ?
This Zip HydroTap G4
is an electronically controlled, filtered, boiling, chilled and sparkling (functionality is dependant upon model purchased) drinking water system for the kitchen. The HydroTap G4 systems are under counter drinking water appliances with a dispensing tap mounted on a sink or worktop, which have been designed for commercial or residential applications. The HydroTap G4 utilises a conventional refrigerant compressor to chill the water and an immersion heating element to boil the water. These units are NOT designed to be used solely as sanitary fixtures. The Zip HydroTap G4
models which dispense boiling water are fitted with a tap mounted safety lock. In addition, there are various energy saving options accessible via the main menu. The system is equipped with a self-calibrating program which caters for altitude adjustment. The water filter is a disposable item which will require periodic replacement and is covered by a limited OEM warranty. It is important that the installation be undertaken safely, correctly and completely in order to utilise all the benefits that the HydroTap G4
can provide. HydroTap G4
Classic taps can be ordered with the tap head
assembly for disabled use. The disabled levers are supplied with Braille caps for the visually impaired.
General product features
Command Centre
6
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important safety and installation instructions for the Zip HydroTap G4. Please read all warnings, installation requirements and installation instructions before installing any Zip HydroTap G4. This system must be installed in accordance with water supply byelaws, current IEE regulations and relevant local authority byelaws.
Safety
This appliance is not intended for use by children under 8 years or persons (including children under 8 years) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning the use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.
Refrigerant
The Zip HydroTap G4 Command Centre contains R134A refrigerant under pressure. Maintenance of the refrigeration unit must be carried out by an accredited service provider or qualified refrigeration technician.
CO
2
You can have serious health problems if breathing air containing concentrations of CO2 up to 15000ppm (1.5%) for more than 10 minutes. Proper ventilation must be provided to ensure that, in case of escape, concentrations of CO2 remain below this level.
Qualifications
If the power cable is damaged it must be repaired only by a qualified technician. To avoid hazards, all installation procedures must be carried out by a suitably qualified tradesperson. The power cable and power outlet must be in a safe visible position for connection.
Venting
Sometimes steam and / or boiling water droplets may discharge through a vent outlet on the tap. If the tap is not installed using the font, ensure the tap body is located so the tap outlet safely dispenses into the sink bowl area.
Lifting
Take care when lifting. The Command Centre may exceed safe lifting limits. If you feel this is beyond your personal capabilities, please seek assistance with the lift. The weight of the Command Centre is marked on the packaging. Do not lift the Command Centre by the front cover or any of its connections. Refer to the technical specification, see page 11, for the weight of the product.
Airflow
The Zip HydroTap G4 operates within the ambient temperature range 5ºC - 35ºC. Proper air circulation must be provided. The system will operate satisfactorily only if the recommended air gaps are provided. See Section 1 'Ventilation', page 13, for correct installation to prevent overheating. The vent kit supplied must be fitted.
Altitude
Water boils at varying temperatures at different altitudes. The HydroTap G4 adjusts for this during startup calibration and will recalibrate itself on a regular basis.
Frost protection
If the HydroTap G4 is located where the ambient air temperature could fall below 5ºC when the heater is not in use, do not turn off the appliance electrically. This safeguard does not offer the same protection to the connecting pipework and fittings.o
!
7
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
WARNINGS AND REGULATORY INFORMATION
Warnings
The Zip HydroTap G4 must be earthed. The resistance of the earth connection from each exposed metal part must be less than 1Ω.
• All installation and service work must be completed by trained and suitably qualified tradespeople. Faulty operation due to unqualified persons working on this product, or any other Zip product may void warranty coverage.
• As the installer, it is your responsibility to supply (if necessary) and install all valves as required by local regulations and relevant standards.
• The HydroTap G4 is rated for 230V 50/60Hz AC operation (supply frequency dependant upon model purchased).
• Do not remove the cover of the appliance under any circumstances without first isolating the appliance from the power supply.
• Never locate the Command Centre near, or clean with water jets.
• Do not expose the Zip HydroTap G4 to the elements of nature.
• Due to the process of continuous improvement, Zip reserves the right to change details mentioned in this manual, without notice.
• Visit www.zipwater.co.uk to ensure you have the latest copy of this document.
!
IMPORTANT SAFETY INSTRUCTIONS
Positioning
It is important to ensure the Command Centre is positioned in an accessible area close to the floor level. The Command Centre must have its base mounted in a horizontal position with all inlets and outlets facing up. The tap must be located above the Command Centre. See Section 7, Command Centre installation.
8
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Major components and accessories
Accessories Description
Booster
(inc. connection
hoses)
Scale, taste &
odour filter
Scale filter
installation kit
(Filter not included).
Font, Integrated or
Stand alone
Replacement
internal 0.2 micron
filter
Disabled lever kit
(Classic HydroTap)
Mixer upgrade
All-in-One upgrade
(vented)
(mains)
Recommended
water block
Parts supplied Description
Tap options*
1 x HydroTap G4
1 x All-in-One
HydroTap G4
Mains or Vented
1 x mixer tap
Command Centre and components
Duct kit*
1 x Exhaust duct
1 x Mounting plate
2 x Outlet vent
1 x Inlet vent
1 x Command Centre with air and water
filters
1 x Mains water
connection hose
1 x Booster inc.
connection hoses
(supplied with
140 or 240 models)
1 x Installation
fittings (supplied
with vented mixer
tap models)
1 x User guide and
1 x Quick start guide
1 x Installation
instruction
801599 - HydroTap User Guide - Nov 2013 UK - V1.05 Page 1 of 20
ZIP HydroTap
User Guide
®
Tap Operation...................(Pages 2-5)
LCD Screen & Menu .......(Pages 6-18)
Maintenance.................... (Pages 18-20)
Date of Installation.........
Affix Model Number Label
Here
801599
BC160/125G4 BC240/175G4 BCH160/125G4 BCH240/175G4 AV160/125G4 AN160/125G4 AV240/175G4 AN240/175G4
801600 - Zip Quick Start Guide - October 2013 - V1.06
Parts Supplied Description Parts Supplied Description
1 off Hydrotap Tap and hoses
Duct kit 1x Air Duct
1 x Mounting
plate
1 off Undersink Unit
with air and water-
filter
Vent kit
1 x Kickboard
louvre
1 x Door vent
louvre
1 x front vent grill
1 x Restrictaflow valve and Tee piece for Mixer
Taps
1 off HydroTap Booster heater and hoses
(Supplied with 240/175 models)
1 off Mains water connection hose
QUICK START GUIDE
Note: This quick start guide must be read in conjunction with the main installation and user instructions
Before proceeding, read the installation and user instructions
Check all the components are present and correct.
Check that you have all the necessary tools
Ensure the underbench can support the product weight when full of water,
(Check the specifications in the main book and allow an extra 5-8kg when full. )
Before installing ensure the following have been provided at the installation site:
Sufficient space in the cupboard to install all of the undersink units in accordance with these Installation Instructions. Refer to technical specification for dimensions. If required, make allowance for a booster heater. (Refer to the main book, for detailed installation instructions).
A potable water supply connection with isolating valve inside the cupboard within reach of the flexible braided hose and positioned so that the connection point and the stop cock will not be obstructed when all the undersink units are installed.
For Zip HydroTap 160/125 &160/175 models, a 220-240Vac, 10A GPO will be required. For Zip HydroTap 240/175 models, two 220-240Vac, 10A GPOs will be required. (One GPO is for the Zip HydroTap and the other for the Booster heater).
NOTE: Check the cable lengths and outlet positions before proceeding.
A potable cold water supply with a minimum working pressure of 172kPa and a maximum working pressure of 700kPa connected via an isolation valve.
For the mains pressure All-IN-ONE, both a hot and cold water supply will be required.
The undersink appliances must be mounted in upright positions as shown in the
diagrams.
IMPORTANT!
Do not proceed with the installation if these
requirements are not met.
STEP 1-
Prepare and fit the Taps
Hole positioning: Position the tap such that it dispenses into
the sink bowl with ample clearance for a cup or tea pot. Alternatively, the tap could be mounted away from the sink using a Zip Font, avail- able as an accessory.
Apply a light smearing of silicon sealant on the underside of the upper spacer to ensure a watertight t.
For HydroTap and Mixer taps
cut a 35mm hole in the bench / sink top.
BENCH TOP
Ø35mm
HydroTap Tap
Mixer Tap
4-in-1
(If required)
NUT
LOWER RUBBER
WASHER
UPPER RUBBER WASHER
WASHER
BRAIDED HOSE x 3
UPPER RUB- BER WASHER
LOWER RUB- BER WASHER
WASHER
NUT
White Hose Ext. Mains
Blue band Mixer IN
Red band Mixer Out
O-RING
BASE BLOCK SPIDER
BASE BLOCK NUT
USB CABLE
ALL THREAD ROD
NOTE: feed each of the tubes and elec- trical cable evenly in between the legs of the BASE BLOCK SPIDER.
All-In-One Tap
(If required)
For AIO mains and vented Taps
Cut a 50mm hole in the bench / sink top.
NOTE: make sure the tap location will allow the nozzle to drain into the sink.
SINK TOP
50mm
ALL THREAD
ROD
STAINLESS STEEL WASHER
SPIDER CLAMP
NUT
BLACK PLASTIC SPACER
NOTE: feed each of the three tubes and electrical cable evenly in between the legs of the SPIDER CLAMP when installing.
Fit the STAINLESS STEEL WASHER, SPIDER CLAMP, AND 6mm NUT.
6mm NUT
SPIDER CLAMP
Stainless washer
Black plastic spacer
35mm dia hole
Sink
O-RING
SINK TOP
Fit the O-ring to the underside of the AIO tap then pass all hoses through the 50mm hole.
Chiller connection BLUE
From Mixer OUT to Tap - Vented version only
Boiler connection RED
Blue ring on RHS mains IN to
Mixer IN
White ring on LHS to
Mains in
Tap
O ring Base
Clear tube to Vent
For Accessories contact Zip: Tel 0345 6 005 005 Website: www.zipwater.co.uk
Email: sales@zipindustries.co.uk
*Dependant on model purchased
9
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Tap - Command Centre compatibility
Commercial B, BA, BC and BCS HydroTap G4 range
All-in-One Classic
Filtered Boiling and Chilled plus unfiltered Hot and Cold Filtered Boiling, Chilled and Sparkling plus unfiltered Hot and Cold
Filtered Chilled Filtered, Chilled and Sparkling
Commercial C and CS HydroTap G4 range
HydroTaps
Filtered Chilled plus unfiltered Hot and Cold Filtered Chilled and Sparkling plus unfiltered Hot and Cold
Celsius
Arc / Cube
Elite Classic
HydroTaps
Mixer taps
Classic Vented
+
Filtered Boiling Filtered Boiling and Ambient Filtered Boiling and Chilled Filtered Boiling, Chilled and Sparkling
Plus unfiltered Hot and Cold.
Filtered Boiling plus unfiltered Hot and Cold Filtered Boiling and Ambient plus unfiltered Hot and Cold Filtered Boiling and Chilled plus unfiltered Hot and Cold Filtered Boiling, Chilled and Sparkling plus unfiltered Hot and Cold
Celsius & All-in-One Celsius Arc
All-in-One
Celsius Arc
Arc / Cube
Elite Classic
Celsius
Arc / Cube
All-in-One
Classic
Vented
Celsius
Arc / Cube
All-in-One
Classic
Mains
Loading...
+ 20 hidden pages