Zip 5053UK, 5061UK, HydroTap G4, 5261UK, 2924UK Installation Instructions Manual

...
1
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
VENTILATION
IS ESSENTIAL
‘VENTILATION’
BEFORE YOU START
Installation instructions
Zip HydroTap G4
The Worlds most advanced Drinking Water Appliance
Model :
Command Centre (see table of contents for specific models)
®
2
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Tap options
The G4 series offers a range of interchangeable taps to suit the customer's needs.
Classic range
Arc / Cube range
Elite range
All-in-One range
Mixer range
These standalone taps offer instant boiling, chilled and sparkling water* and are directly compatible with the G4 Command Centre.
The All-in-One tap may be used as alternatives to the above HydroTap and mixer tap combinations*.
The mixer tap range may be used in conjunction with any of the above to provide mixed hot and cold water for sanitary use*.
Celsius range
The Celsius range offer instant boiling, chilled and sparkling / boiling and chilled / boiling and ambient / chilled and sparkling / chilled or boiling* water together with the an integral mixer to provide mixed hot and cold water from the mains.
*Dependant upon model purchased.
3
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
HydroTap G4 specifications
Installation check list .................................................................................................................... 4
General product features ............................................................................................................. 5
Important safety instructions ........................................................................................................ 6
Warnings and regulatory information ........................................................................................... 7
Major components and accessories ............................................................................................. 8
Tap - Command Centre compatibility ........................................................................................... 9
Technical specifications ............................................................................................................... 11
Before installation and site requirements ..................................................................................... 12
Installation instructions Step 1 -
Measure and cut all the tap holes, fit the taps : Refer to 803341UK Tap installation instructions.
Step 2
- Check for adequate ventilation.
Section 1 - Ventilation.
Section 1.1 - 1.9 Ventilation for all models ................................................................................... 13
Step 3
- Install the booster / scale filter / water block / carbonation valve (if required).
Section 2 - Booster installation ..................................................................................................... 21
Section 3 - Scale filter installation ................................................................................................ 24
Section 4 - CO2 cylinder installation ............................................................................................. 25
Section 5 - Water block installation .............................................................................................. 27
Section 6 - Carbonation valve installation .................................................................................... 29
Step 4
- Install the Command Centre.
Section 7 Commercial & residential Command Centre installation.
Section 7.1 - Generic Command Centre installation instructions ................................................. 30
Section 7.2 - External bypass valve ............................................................................................. 31
Section 7.3 - 5253UK & 5053UK BCS commercial installation .................................................... 33
Section 7.4 - 2957UK, 2857UK, 1456UK & 1256UK BCS comm. and res. compact installation . 38
Section 7.5 - 5261UK & 5061UK BC commercial installation ...................................................... 43
Section 7.6 - 2924UK, 2824UK,1414UK & 1214UK BC comm. and res. compact installation .... 48
Section 7.7 - 5200UK, 5201UK, 5000UK, 5001UK 1500UK, 1501UK, 1300UK,1301UK
BO, BA installation ....................................................................................................................... 53
Section 7.8 - 0053UK CS commercial installation ........................................................................ 60
Section 7.9 - 0061UK C commercial installation .......................................................................... 63
Section 7.10 - 0056UK CS residential installation ........................................................................ 66
Section 7.11 - 0015UK C residential installation .......................................................................... 69
Step 5
- Commission the HydroTap G4.
Section 8 - Commissioning
Section 8.1 - Generic commissioning instructions ....................................................................... 72
Section 8.2 - Select the language ................................................................................................ 72
Section 8.3 - CO2 purge ............................................................................................................... 72
Section 8.4 - Filter flush ............................................................................................................... 73
Section 8.5 - Boiling calibration .................................................................................................... 73
Section 8.6 - Booster enable ........................................................................................................ 73
Section 8.7 - Safety sensor calibration ......................................................................................... 74
Section 8.8 - System flush ........................................................................................................... 74
Trouble shooting
Trouble shooting table .................................................................................................................. 76
End of life disposal ....................................................................................................................... 77
Warranty ....................................................................................................................................... 78
Contact details ............................................................................................................................. 80
Table of contents
4
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Before installation
Read the instructions and check if there is adequate space to install all of the components.
• Note Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
Check the mains water pressure is within min / max requirements (see page 11).
Check the water quality to determine if extra filtration will be required.
• Note This product must be fitted to a wholesome water supply.
Check the Command Centre rating plate and ensure correct power is available.
Check the under counter cupboard floor supporting the Command Centre is adequate for its total weight, when full of water.
Before commissioning
Check the system has been installed correctly.
Check all plumbing fittings for water tightness.
Ensure the outlet and vent pipes are positioned to drain correctly.
Ensure there is adequate ventilation.
Check all tubes and pipes from the Command Centre to the tap have a constant rise and there are no sags or kinks in the hoses.
Check all electrical connections are correct and there are no loose wires.
Commission (see section 8)
Flush the supply line before connecting.
Turn on the water and check for leaks.
Flush the filter(s).
Activate / enable the booster (if fitted).
Calibrate the safety sensor for boiling models.
Where applicable, programme the Command Centre to suit the customer’s requirements.
Installation checklist
5
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Thank you for purchasing a Zip HydroTap G4. Please read and follow these instructions carefully to ensure safe and trouble free operation. If help and advice is required, please call 0345 6 005 005.
What is the Zip HydroTap G4 ?
This Zip HydroTap G4
is an electronically controlled, filtered, boiling, chilled and sparkling (functionality is dependant upon model purchased) drinking water system for the kitchen. The HydroTap G4 systems are under counter drinking water appliances with a dispensing tap mounted on a sink or worktop, which have been designed for commercial or residential applications. The HydroTap G4 utilises a conventional refrigerant compressor to chill the water and an immersion heating element to boil the water. These units are NOT designed to be used solely as sanitary fixtures. The Zip HydroTap G4
models which dispense boiling water are fitted with a tap mounted safety lock. In addition, there are various energy saving options accessible via the main menu. The system is equipped with a self-calibrating program which caters for altitude adjustment. The water filter is a disposable item which will require periodic replacement and is covered by a limited OEM warranty. It is important that the installation be undertaken safely, correctly and completely in order to utilise all the benefits that the HydroTap G4
can provide. HydroTap G4
Classic taps can be ordered with the tap head
assembly for disabled use. The disabled levers are supplied with Braille caps for the visually impaired.
General product features
Command Centre
6
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important safety and installation instructions for the Zip HydroTap G4. Please read all warnings, installation requirements and installation instructions before installing any Zip HydroTap G4. This system must be installed in accordance with water supply byelaws, current IEE regulations and relevant local authority byelaws.
Safety
This appliance is not intended for use by children under 8 years or persons (including children under 8 years) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning the use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.
Refrigerant
The Zip HydroTap G4 Command Centre contains R134A refrigerant under pressure. Maintenance of the refrigeration unit must be carried out by an accredited service provider or qualified refrigeration technician.
CO
2
You can have serious health problems if breathing air containing concentrations of CO2 up to 15000ppm (1.5%) for more than 10 minutes. Proper ventilation must be provided to ensure that, in case of escape, concentrations of CO2 remain below this level.
Qualifications
If the power cable is damaged it must be repaired only by a qualified technician. To avoid hazards, all installation procedures must be carried out by a suitably qualified tradesperson. The power cable and power outlet must be in a safe visible position for connection.
Venting
Sometimes steam and / or boiling water droplets may discharge through a vent outlet on the tap. If the tap is not installed using the font, ensure the tap body is located so the tap outlet safely dispenses into the sink bowl area.
Lifting
Take care when lifting. The Command Centre may exceed safe lifting limits. If you feel this is beyond your personal capabilities, please seek assistance with the lift. The weight of the Command Centre is marked on the packaging. Do not lift the Command Centre by the front cover or any of its connections. Refer to the technical specification, see page 11, for the weight of the product.
Airflow
The Zip HydroTap G4 operates within the ambient temperature range 5ºC - 35ºC. Proper air circulation must be provided. The system will operate satisfactorily only if the recommended air gaps are provided. See Section 1 'Ventilation', page 13, for correct installation to prevent overheating. The vent kit supplied must be fitted.
Altitude
Water boils at varying temperatures at different altitudes. The HydroTap G4 adjusts for this during startup calibration and will recalibrate itself on a regular basis.
Frost protection
If the HydroTap G4 is located where the ambient air temperature could fall below 5ºC when the heater is not in use, do not turn off the appliance electrically. This safeguard does not offer the same protection to the connecting pipework and fittings.o
!
7
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
WARNINGS AND REGULATORY INFORMATION
Warnings
The Zip HydroTap G4 must be earthed. The resistance of the earth connection from each exposed metal part must be less than 1Ω.
• All installation and service work must be completed by trained and suitably qualified tradespeople. Faulty operation due to unqualified persons working on this product, or any other Zip product may void warranty coverage.
• As the installer, it is your responsibility to supply (if necessary) and install all valves as required by local regulations and relevant standards.
• The HydroTap G4 is rated for 230V 50/60Hz AC operation (supply frequency dependant upon model purchased).
• Do not remove the cover of the appliance under any circumstances without first isolating the appliance from the power supply.
• Never locate the Command Centre near, or clean with water jets.
• Do not expose the Zip HydroTap G4 to the elements of nature.
• Due to the process of continuous improvement, Zip reserves the right to change details mentioned in this manual, without notice.
• Visit www.zipwater.co.uk to ensure you have the latest copy of this document.
!
IMPORTANT SAFETY INSTRUCTIONS
Positioning
It is important to ensure the Command Centre is positioned in an accessible area close to the floor level. The Command Centre must have its base mounted in a horizontal position with all inlets and outlets facing up. The tap must be located above the Command Centre. See Section 7, Command Centre installation.
8
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Major components and accessories
Accessories Description
Booster
(inc. connection
hoses)
Scale, taste &
odour filter
Scale filter
installation kit
(Filter not included).
Font, Integrated or
Stand alone
Replacement
internal 0.2 micron
filter
Disabled lever kit
(Classic HydroTap)
Mixer upgrade
All-in-One upgrade
(vented)
(mains)
Recommended
water block
Parts supplied Description
Tap options*
1 x HydroTap G4
1 x All-in-One
HydroTap G4
Mains or Vented
1 x mixer tap
Command Centre and components
Duct kit*
1 x Exhaust duct
1 x Mounting plate
2 x Outlet vent
1 x Inlet vent
1 x Command Centre with air and water
filters
1 x Mains water
connection hose
1 x Booster inc.
connection hoses
(supplied with
140 or 240 models)
1 x Installation
fittings (supplied
with vented mixer
tap models)
1 x User guide and
1 x Quick start guide
1 x Installation
instruction
801599 - HydroTap User Guide - Nov 2013 UK - V1.05 Page 1 of 20
ZIP HydroTap
User Guide
®
Tap Operation...................(Pages 2-5)
LCD Screen & Menu .......(Pages 6-18)
Maintenance.................... (Pages 18-20)
Date of Installation.........
Affix Model Number Label
Here
801599
BC160/125G4 BC240/175G4 BCH160/125G4 BCH240/175G4 AV160/125G4 AN160/125G4 AV240/175G4 AN240/175G4
801600 - Zip Quick Start Guide - October 2013 - V1.06
Parts Supplied Description Parts Supplied Description
1 off Hydrotap Tap and hoses
Duct kit 1x Air Duct
1 x Mounting
plate
1 off Undersink Unit
with air and water-
filter
Vent kit
1 x Kickboard
louvre
1 x Door vent
louvre
1 x front vent grill
1 x Restrictaflow valve and Tee piece for Mixer
Taps
1 off HydroTap Booster heater and hoses
(Supplied with 240/175 models)
1 off Mains water connection hose
QUICK START GUIDE
Note: This quick start guide must be read in conjunction with the main installation and user instructions
Before proceeding, read the installation and user instructions
Check all the components are present and correct.
Check that you have all the necessary tools
Ensure the underbench can support the product weight when full of water,
(Check the specifications in the main book and allow an extra 5-8kg when full. )
Before installing ensure the following have been provided at the installation site:
Sufficient space in the cupboard to install all of the undersink units in accordance with these Installation Instructions. Refer to technical specification for dimensions. If required, make allowance for a booster heater. (Refer to the main book, for detailed installation instructions).
A potable water supply connection with isolating valve inside the cupboard within reach of the flexible braided hose and positioned so that the connection point and the stop cock will not be obstructed when all the undersink units are installed.
For Zip HydroTap 160/125 &160/175 models, a 220-240Vac, 10A GPO will be required. For Zip HydroTap 240/175 models, two 220-240Vac, 10A GPOs will be required. (One GPO is for the Zip HydroTap and the other for the Booster heater).
NOTE: Check the cable lengths and outlet positions before proceeding.
A potable cold water supply with a minimum working pressure of 172kPa and a maximum working pressure of 700kPa connected via an isolation valve.
For the mains pressure All-IN-ONE, both a hot and cold water supply will be required.
The undersink appliances must be mounted in upright positions as shown in the
diagrams.
IMPORTANT!
Do not proceed with the installation if these
requirements are not met.
STEP 1-
Prepare and fit the Taps
Hole positioning: Position the tap such that it dispenses into
the sink bowl with ample clearance for a cup or tea pot. Alternatively, the tap could be mounted away from the sink using a Zip Font, avail- able as an accessory.
Apply a light smearing of silicon sealant on the underside of the upper spacer to ensure a watertight t.
For HydroTap and Mixer taps
cut a 35mm hole in the bench / sink top.
BENCH TOP
Ø35mm
HydroTap Tap
Mixer Tap
4-in-1
(If required)
NUT
LOWER RUBBER
WASHER
UPPER RUBBER WASHER
WASHER
BRAIDED HOSE x 3
UPPER RUB- BER WASHER
LOWER RUB- BER WASHER
WASHER
NUT
White Hose Ext. Mains
Blue band Mixer IN
Red band Mixer Out
O-RING
BASE BLOCK SPIDER
BASE BLOCK NUT
USB CABLE
ALL THREAD ROD
NOTE: feed each of the tubes and elec- trical cable evenly in between the legs of the BASE BLOCK SPIDER.
All-In-One Tap
(If required)
For AIO mains and vented Taps
Cut a 50mm hole in the bench / sink top.
NOTE: make sure the tap location will allow the nozzle to drain into the sink.
SINK TOP
50mm
ALL THREAD
ROD
STAINLESS STEEL WASHER
SPIDER CLAMP
NUT
BLACK PLASTIC SPACER
NOTE: feed each of the three tubes and electrical cable evenly in between the legs of the SPIDER CLAMP when installing.
Fit the STAINLESS STEEL WASHER, SPIDER CLAMP, AND 6mm NUT.
6mm NUT
SPIDER CLAMP
Stainless washer
Black plastic spacer
35mm dia hole
Sink
O-RING
SINK TOP
Fit the O-ring to the underside of the AIO tap then pass all hoses through the 50mm hole.
Chiller connection BLUE
From Mixer OUT to Tap - Vented version only
Boiler connection RED
Blue ring on RHS mains IN to
Mixer IN
White ring on LHS to
Mains in
Tap
O ring Base
Clear tube to Vent
For Accessories contact Zip: Tel 0345 6 005 005 Website: www.zipwater.co.uk
Email: sales@zipindustries.co.uk
*Dependant on model purchased
9
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Tap - Command Centre compatibility
Commercial B, BA, BC and BCS HydroTap G4 range
All-in-One Classic
Filtered Boiling and Chilled plus unfiltered Hot and Cold Filtered Boiling, Chilled and Sparkling plus unfiltered Hot and Cold
Filtered Chilled Filtered, Chilled and Sparkling
Commercial C and CS HydroTap G4 range
HydroTaps
Filtered Chilled plus unfiltered Hot and Cold Filtered Chilled and Sparkling plus unfiltered Hot and Cold
Celsius
Arc / Cube
Elite Classic
HydroTaps
Mixer taps
Classic Vented
+
Filtered Boiling Filtered Boiling and Ambient Filtered Boiling and Chilled Filtered Boiling, Chilled and Sparkling
Plus unfiltered Hot and Cold.
Filtered Boiling plus unfiltered Hot and Cold Filtered Boiling and Ambient plus unfiltered Hot and Cold Filtered Boiling and Chilled plus unfiltered Hot and Cold Filtered Boiling, Chilled and Sparkling plus unfiltered Hot and Cold
Celsius & All-in-One Celsius Arc
All-in-One
Celsius Arc
Arc / Cube
Elite Classic
Celsius
Arc / Cube
All-in-One
Classic
Vented
Celsius
Arc / Cube
All-in-One
Classic
Mains
10
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Residential B, BA, BC and BCS HydroTap G4 range
Arc / Cube
Elite Classic
HydroTaps
Residential C and CS HydroTap G4 range
Filtered Chilled Filtered, Chilled and Sparkling
Tap - Command Centre compatibility
Filtered Chilled plus unfiltered Hot and Cold Filtered Chilled and Sparkling plus unfiltered Hot and Cold
Celsius
Arc / Cube
Celsius
All-in-One taps
All-in-One
Classic
Vented
Arc / Cube
Elite Classic
HydroTaps
Mixer taps
Arc Mains Cube Mains
+
Filtered Boiling Filtered Boiling and Ambient Filtered Boiling and Chilled Filtered Boiling, Chilled and Sparkling
Filtered Boiling plus unfiltered Hot and Cold Filtered Boiling and Ambient plus unfiltered Hot and Cold Filtered Boiling and Chilled plus unfiltered Hot and Cold Filtered Boiling, Chilled and Sparkling plus unfiltered Hot and Cold
Celsius
Arc / Cube
Celsius & All-in-One Celsius Arc
All-in-One
Celsius Arc
Filtered Boiling and Chilled plus unfiltered Hot and Cold Filtered Boiling, Chilled and Sparkling plus unfiltered Hot and Cold
Plus unfiltered Hot and Cold
All-in-One
Classic
Mains
11
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Command
Centre
Capacity boiling
(167ml cups
/hr)
Capacity
chilled/
sparkling
(200ml
glasses/hr)
Power
rating
(kW)
230V
Boost rating
(kW) 230V
Boost
(10A)
**13A sockets
required
Unit Dimensions****
W x D x H (mm) with air
duct
***Dry
weight
(kg)
Commercial Command Centres
Filtered Boiling, Chilled and Sparkling, with and without booster
5253UK
#
5053UK
160 / 240* 175 2.30 2.20 optional 1 / 2* 450 x 470 x 335 39
2957UK
#
2857UK
100 / 140* 75 2.13 2.20 optional 1 / 2* 338 x 461 x 335 30
Filtered Boiling and Chilled, with and without booster
5261UK
#
5061UK
160 / 240* 175 2.13 2.20 optional 1 / 2* 450 x 470 x 335 28
2924UK
#
2824UK
100 / 140* 75 2.05 2.20 optional 1 / 2* 280 x 470 x 335 22
Filtered Boiling and Ambient, with and without booster
5201UK
#
5001UK
160 / 240* - 1.90 2.20 optional 1 / 2* 280 x 313 x 335 13
Filtered Boiling, with and without booster
5200UK
#
5000UK
160 / 240* - 1.90 2.20 optional 1 / 2* 280 x 313 x 335 11
Filtered Chilled and Sparkling
0053UK - 175 0.45 - - 1 336 x 476 x 335 36
Filtered Chilled
0061UK - 175 0.3 - - 1 336 x 480 x 335 24
Residential Command Centres
Filtered Boiling, Chilled and Sparkling, with and without booster
1456UK
#
1256UK
1.7 2.2 optional 1 / 2* 338 461 x 335 30
Filtered Boiling and Chilled, with and without booster
1414UK
#
1214UK
1.55 2.2 optional 1 / 2* 280 x 470 x x335 21
Filtered Boiling and Ambient, with and without booster
1501UK
#
1301UK
1.43 2.2 optional 1 / 2* 280 x 313 x 335 13
Filtered Boiling, with and without booster
1500UK
#
1300UK
1.43 2.2 optional 1 / 2* 280 x 313 x 335 11
Filtered Chilled and Sparkling
0056UK 0.35 - - 1 280 x 405 x 335 30
Filtered Chilled
0015UK 0.13 - - 1 280 x 420 x 335 20
#
Supplied with venturi for vented mixer tap * With boost ** One for the Command Centre, and one for the booster *** Add 3 - 8Kg when full **** Refer to Section 7, Command Centre installation, for clearance envelope.
Component Min. / Max. water supply pressure MPa (bar)
(in a G4 Hydrotap system)
HydroTap 0.17 (1.7) - 0.5 (5.0)
Sparkling Hydrotap 0.25 (2.5) - 0.5 (5.0)
Mixer tap 0.20 (2.0) - 0.5 (5.0)
Booster 0.20 (2.0) - 0.5 (5.0)
Scale filter 0.20 (2.0) - 0.5 (5.0)
Technical specifications
Water supply pressure requirements
12
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Before installation
Before installation ensure that the following have been provided at the installation site
Review of all the technical specifications.
Ensure the under counter cupboard floor can support the product weight when full of water (allow an extra 3-8kg when full).
Sufficient space in the cupboard to install the Command Centre and other components in accordance with these installation instructions. See Technical specification, page 11 for dimensions. Make allowance for a booster if required. See sections 2 page 21 for installation instructions.
For Zip HydroTap G4 models without booster, 1 x 220-240V AC 13A socket will be required. For Zip HydroTap G4 models with booster, 2 x 220-240V AC 13A sockets will be required. (One socket is for the Command Centre and the other for the booster).
Both the Command Centre and booster must be installed in accordance with IEE regulations, See Technical specification, page 11 for power ratings.
Note Check all cable and hose lengths against inlet /outlet positions before
proceeding (see section 7 for general layout).
A wholesome water supply connection with a minimum working pressure of: (see page 11 min. / max. water supply pressure) with isolating valve inside the cupboard within reach of the braided hoses and positioned so that the connection point and the stop cock will not be obstructed when the Command Centre is installed.
For the All-in-One, Celsius and Mains mixer taps a hot and cold water supply are required. (see page 11 for min/max. water supply pressure).
If external filtration or a lime-scale protection filter is required, then it is important to allow extra space for it.
If pressure is likely to exceed 0.5 MPa (5 bar), install a 0.35 MPa (3.5 bar) pressure limiting valve.
The appliance must be placed with its base in a horizontal position.
Ensure proper ventilation for CO2, see Important safety instructions, page
6.
IMPORTANT!
Do not proceed with the installation if these requirements are
not met.
!
!
13
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Section 1
Ventilation
Ventilation table of contents
1.1 Generic requirements ............................................................................................................. 13
1.2 BC,BCS Commercial Command Centre installation .............................................................. 14
1.3 BC, BCS Commercial compact Command Centre installation ............................................... 16
1.4 BO,BA Commercial and Residential Command Centre installation ....................................... 17
1.5 CS, C Commercial Command Centre installation .................................................................. 18
1.6 BC, BCS, CS, C Residential Command Centre installation ................................................... 20
Generic requirements
!
Important Read this section in conjunction with section 7 Command Centre installation,
page 30.
When installing air flow vents, the following tools will be required
Jigsaw and drill or equivalent equipment.
Keyhole or wall board saw.
1.1 Generic requirements
Clearance envelope
A clearance envelope around all Command Centres must be provided to allow adequate ventilation for the safe and effective use of the HydroTap G4 system.
!
535mm
50mm
50mm
Command Centre
width
14
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.2.2 Preferred ventilation arrangement shown below.
The ducted vent kit supplied with the Command Centre exhausting through the kick-space should be used, to provide adequate ventilation in all conditions. (Ancillary components are not shown in these diagrams).
A
B
C
100mm min.
Inlet grille
Position vent grille on either the kick board or the cupboard ends
Inlet grille should be fitted in baseboard
A
Cupboard back must be fully closed to prevent recirculation into cupboard from kick space.
1.2 BC, BCS Commercial Command Centres
Ventilation
1.2.1 Ventilation for all models
The clearance envelope dimensions stated in the Specification sheets and Installation instructions must
be observed.
Adequate ventilation must be provided to ensure that the cupboard temperature doesn't exceed 350C.
Vent cut-out details
A Air outlet vent
(flat vent)
B Air inlet vent
314
Ø
12 x 2
326
5
43max
285
60
Ø
12 X 4
=
=
45
284
Ø
12 x 4
C Ducted vent
15
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.2.3 Alternative arrangement (Dual fan kit)
In situations where the preferred arrangement cannot be used or will not work effectively e.g.
Single cupboard where the 100mm grille spacing cannot be achieved.
Where there are openings in the back of the cupboard allowing exhaust air to recirculate into the cupboard
space. An SP93156 Dual exhaust fan kit* must be fitted in either arrangement A or B shown below and connected to the DIN socket on the Command Centre .
A Fan kit fitted to kick board and with kick space duct fitted to the Command Centre. B Fan kit fitted to cupboard door (position B1) or side (position B2) and without kick space duct fitted to the
Command Centre.
*
For dual exhaust fan cut-out dimensions see the instructions provided with the kit.
B
A
B2
B1
Vent tray
100mm
min.
1.2 4 Alternative arrangement (Vent tray)
In situations where cupboard width is 1000mm or greater, without central pillar or where the rear of the cupboard is not sealed and where vent grilles cannot be fitted in the kick board (e.g. hospitals) use a Vent tray kit Call Zip on 0345 6 005 005.
A vent grille, supplied should be used as an inlet vent and fitted to the cabinet side (adjacent to the
Command Centre air inlet) as shown below. It must take in air from the room or another ventilated space. This space could be an adjacent cupboard, (via a communicating port) on condition that it does not contain a heat generating appliance. The vent grille or the angled inlet grille supplied should be fitted in the adjacent cupboard, observing 100mm separation from the vent tray exhaust.
Ventilation
16
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.3.1 Ventilation for all models
The clearance envelope dimensions stated in the specification sheets and installation instructions must
be observed.
Adequate ventilation must be provided to ensure that the cupboard space temperature does not exceed
350C.
1.3.2 Preferred arrangement
The vent kit supplied with the Command Centre should be used to provide adequate ventilation by
convection in normal usage.
Note The vent kit has to be installed in a way that allows air to be drawn in from the bottom of the cupboard
and expelled through the top of the cupboard. The outlet vent A should be towards the top of the door (position
A2) or side of the cupboard (position A1). (Where possible
air inlet vent and the air outlet vent should be positioned at opposite ends of the same cupboard space).
A1
A2
Vent cut-out details
*A Air outlet vent
B
1.3.3 Alternative arrangement
In situations where the preferred arrangement does not provide adequate ventilation by natural convection a Dual exhaust fan kit* (SP93156) must be fitted to the cupboard door or side (as shown in the illustration below) and connected to the Command Centre DIN socket.
* For dual exhaust fan cut-out dimensions see the instructions provided with the kit.
B
A1
A2
B Air inlet vent
Note Flat outlet vent detail shown above, louvred outlet vent
also supplied.
1.3 BC, BCS Commercial compact Command Centres
Ventilation
285
60
Ø
12 X 4
=
=
314
Ø
12 x 2
326
5
43max
17
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.4.1 Ventilation for all models
The clearance envelope dimensions stated in the specification sheets and installation instructions must be observed.
Adequate ventilation must be provided to ensure that the cupboard space temperature does not exceed 350C.
1.4.2 Preferred arrangement
4mm door buffers (at the four corners of each door) supplied with the Command Centre should be used to provide adequate ventilation in normal usage, see illustration below.
Door buffer
1.4 BO & BA Commercial, BO & BA Residential Command Centres
Ventilation
18
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.5.2 Preferred ventilation arrangements for CS models
The ducted vent kit supplied with the Command Centre exhausting through the kick-space should be used, to provide adequate ventilation in all conditions. (Ancillary components are not shown in these diagrams).
1.5.1 Ventilation for all models
The clearance envelope dimensions stated in the specification sheets and installation instructions must be observed.
Adequate ventilation must be provided to ensure that the cupboard space temperature does not exceed 350C.
B
A
C
100mm min.
Cupboard back must be fully
closed to prevent recirculation
into cupboard from kick space.
A
1.5 CS & C Commercial Command Centres
Ventilation
Vent cut-out details
A Air outlet vent
(flat vent)
B Air inlet vent
314
Ø
12 x 2
326
5
43max
285
60
Ø
12 X 4
=
=
45
284
Ø
12 x 4
C Ducted vent
19
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.5.3 Alternative arrangement (Dual fan kit)
In situations where the preferred arrangement cannot be used or will not work effectively e.g.
Single cupboard where the 100mm grille spacing cannot be achieved.
Where there are openings in the back of the cupboard allowing exhaust air to recirculate into the cupboard
space.
An SP93156 Dual exhaust fan kit* must be fitted in either arrangement A or B shown below and connected to the DIN socket on the Command Centre .
A Fan kit fitted to kick board and with kick space duct fitted to the Command Centre. B Fan kit fitted to cupboard door (position B1) or side (position B2) and without kick space duct fitted
to the Command Centre.
*
For dual exhaust fan cut-out dimensions see the instructions provided with the kit.
B1
B2
A B
1.5.4 Alternative arrangement (Vent tray)
In situations where cupboard width is 1000mm or greater, without central pillar and where vent grilles cannot be fitted in the kick board (e.g. hospitals) use a Vent tray kit (CS SP93541).
Vent tray
100mm
min.
A vent grille, supplied should be used as an inlet vent and fitted to the cabinet side (adjacent to the Command Centre air inlet) as shown below. It must take in air from the room or another ventilated space. This space could be an adjacent cupboard, (via a communicating port) on condition that it does not contain a heat generating appliance. The vent grille or the angled inlet grille supplied should be fitted in the adjacent cupboard, observing 100mm separation from the vent tray exhaust.
Ventilation
20
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
1.6.3 Alternative arrangement
For high use applications where the cupboard space temperature is near 350C or higher, the vent kit supplied can be used to provide further ventilation by convection.
Note The vent kit has to be installed in a way that allows air to be drawn in from the bottom of the cupboard and expelled through the top of the cupboard. The outlet vent should be towards the top of the door (position A1) or side of the cupboard (position A2). (Where possible air inlet vent and the air outlet vent should be positioned at opposite ends of the same cupboard space).
1.6.1 Ventilation for all models
The clearance envelope dimensions stated in the specification sheets and installation instructions must be observed.
Adequate ventilation must be provided to ensure that the cupboard space temperature does not exceed 350C.
1.6.2 Preferred arrangements
4mm door buffers (at the four corners of each door) supplied with the Command Centre should be used to provide adequate ventilation in normal usage, see illustration below.
Door buffer
A1
A2
B
Vent cut-out details
A1 or A2 Air outlet vent
B Air inlet vent
Note Flat outlet vent
detail shown, louvred outlet vent also supplied.
1.6 BC, BCS, CS, C Residential Command Centres
Ventilation
314
Ø
12 x 2
326
5
43max
285
60
Ø
12 X 4
=
=
21
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Note 5
Before you install a booster, determine whether an external water filter / softener is required. If an
external water filter / softener is required, the external bypass valve must be set correctly, see page 31.
Booster specifications
Rating Unit
Nominal power rating 2.2 kW Nominal current 10 A Electricity supply 50Hz AC 230 V
Electrical ex, white - 0.6m nom. length 13 A Fixed ow rate 1.2 L/min
Section 2
Booster system
Mount base
horizontally
2.1 Product description
The booster system is a compact electronically controlled auxiliary water heater. It is intended to
provide pre-heating of water before it enters the Zip HydroTap G4 boiling tank. If the booster is used the boiling water output will be increased.
Note 1 Water connection blue cap - water in red cap - water out. The braided hoses cannot be lengthened.
Note 2 The electrical cable length is 0.6m.
Note 3 Position the booster within reach of the fixed hose lengths, keeping the booster as close as possible to the Command Centre inlet / outlet connections.
Note 4 Ensure the booster is mounted in an upright position (as shown) with a horizontal base.
22
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Booster system
2.2 Installation procedure
Site requirements
Booster must only be installed in a frost-free area. Never expose booster to frost.
The booster is designed for wall mounted installation and must be installed with water connectors facing upwards.
The booster is protected against water ingress to class IP 25.
The 500mm braided hoses supplied with the booster cannot be lengthened.
The 90° elbow hose ends should be fitted to the inlet and outlet connections on top of the booster.
The hot water outlet hose must be thermally insulated with the insulation provided.
Tilt forward Lift up
Release
Note Remove the wall mounting chassis from the rear of the booster for wall mounting.
Take care not
to break the
lower clips when removing or installing the
booster.
!
Attach
2.3 Booster installation see diagrams below
• To remove the mounting chassis, insert a flat blade screwdriver all the way into the lock.
• Gently angle the screwdriver upwards by approximately 10°.
• Pull the booster forwards by approximately 15°.
• Carefully pull the booster upwards to complete the removal process. Take care not to break the lower clips.
• Attach the mounting chassis horizontally to the wall / cupboard wall.
• To install, clip the booster into the on the mounting chassis and snap into position (see installation below).
Install
23
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Note 1 This appliance is intended for use with the Zip HydroTap G4 Command Centre Note 2 Water connections must be pointing vertically upwards. Note 3 The booster unit should be installed as close as possible to the Zip HydroTap G4 as the 500mm
connection hoses cannot be lengthened.
Booster system
2.4 Braided hose connection
s
• The cold water inlet (blue cap) and hot water outlet (red cap) are marked on the rating plate. Connect the braided hoses from the ‘BYPASS OUT’ fitting on the Command Centre to the water inlet of the booster (blue cap) and from the outlet of the booster (red cap) to the ‘BYPASS IN’ fitting on the Command Centre. Avoid exerting mechanical force on the booster. This can be achieved by using a spanner on the flats of the inlet and outlet connections when tightening the braided hose connectors. Do not over-tighten ! Tighten the braided hoses by hand, then turn a further 90O to 180O with a spanner.
• Once the water connections have been made, check for any leaks and rectify as necessary.
Strainer
Cold water connection
(inlet, 3/8” BSP)
Hold the hexagon while tightening the braided hose fittings
Braided hoses
Hot water connection
(outlet, 3/8” BSP)
24
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Section 3 Filter / softener installation
An external filter / softener may be fitted to reduce the incidence of scale build up in the hot tank or may be supplied at the customer’s request.
All information required to mount the filter head is available separately in the following document :
Zip scale filter head installation and operating instructions 2017, supplied with the filter head.
3.1 Mounting the filter head
3.2 Cartridge installation and flush.
All information required to install and flush the cartridge is available separately in the following documents:
Zip scale filter cartridge installation and operating instructions 2017, supplied with the filter cartridge.
Zip scale filter head installation and operating instructions 2017, supplied with the filter head.
(From Bypass Out) Inlet
Outlet (To Bypass in)
Insert
Remove
Insert
Remove
Flush valve
25
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
STORAGE WARNING
The cylinder contains 1.2kg of CO2 and should be installed in a well ventilated area.
You can have serious health problems if breathing air containing concentrations of CO2 up to 15000ppm (1.5%) for more than 10 minutes. Proper ventilation must be provided to ensure that, in case of escape, concentrations of CO2 remain below this level. See gas cylinder and MSDS sheet for complete list of warnings.
4.1 Secure the cylinder
Secure the gas cylinder supplied to a suitable wall, within 1 metre of the Command Centre, in an upright position. This is undertaken by screwing the metal bar holding the hook-and-loop strap to a cupboard wall, 200mm above the floor or base of the cupboard. Make sure the gas cylinder can stand in place before securing to the wall. Due to regulatory requirements the gas cylinder must be stored securely and in an upright position.
4.2 Connect the regulator
Remove the gas cylinder from the strap. Make sure the regulator knob is turned fully clockwise to the end-stop before fitting. Screw the regulator (clockwise) onto the cylinder. Be aware that some CO2 may be discharged from the connection between the cylinder and the regulator when assembled together. Any CO2 released will be cold. Screw on the regulator to stop this leakage.
Note The leaking CO2 will be cold.
4.3 Connect the gas hose
Connect the threaded end of the braided gas hose to the regulator. Then connect the push fit fitting to the top of the Command Centre via connection marked ‘CO2 IN’. To turn the gas on, rotate the regulator knob anti - clockwise to the end stop.
4.4 Test for gas leaks
Using soapy water perform a leak test. Apply the soapy water to the gas connections using a sponge or brush. If any bubbles appear and grow, there is a gas leak at the connection. Clean away the soapy residue and tighten or refit the leaking connection. Make sure the gas is turned off when tightening or refitting the leaking connection. Refit the gas cylinder to the hook-and-loop strap. Ensure the cylinder is in an upright position.
!
Turn the knob fully
clockwise before fitting
the regulator
Closed
Open
Section 4
CO2 Cylinder installation
26
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Note When removing hose, take care not to
lose plastic olive from the fitting.
After replacing a cylinder or after making a gas connection, perform a leak test to check for gas leaks
between regulator and cylinder, and between regulator and braided hose.
Stage 1
Turn the gas off.
Using soapy water applied with a sponge, or with a
brush, cover all of the gas joints with a liberal amount of suds.
Stage 2
Turn the gas on.
Inspect the joints for leaks.
If any bubbles appear to grow, the joint will need to be
resealed and tested again.
Test for leaks at these two points
Leak test
CO2 Regulator
!
27
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Section 5 Water block installation
5.1 Description
The Water Block is designed to be installed upstream of any Zip product and associated pipe-work to minimise the potential for water leakage in the event of a system malfunction.
The Water Block is ideal for limiting potential leakage and resulting water damage from water
heaters, water chillers etc. when tted in supply pipe work that is subject to mains water pressure.
Once set, the Water Block will ensure that the volume of water that can ow through at one time is limited to a pre-determined maximum, providing the ow rate through it exceeds 2 litres per minute.
The Water Block also incorporates a non-return valve.
The Water Block is WRAS approved.
5.2 Specication
5.3 Precautions
The Water Block will help to contain leakage exceeding a rate of 2 l/min.
• Note The leakage at lower ow rates may not be detected by the Water Block and could remain
unchecked.
Appropriate measures should be taken to contain leakage in these circumstances.
Flow control range 5 - 50 litres Minimum / Maximum pressure 0.2 - 10.0 bar Maximum ambient temperature 40ºC Maximum water temperature 70ºC Minimum operating flow rate 1.5 +/- 0.5 litres / min. Inlet connection ¾" BSP female or 15mm Outlet connection ¾" BSP male or 15mm
!
28
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
Note. This device must be installed vertically with the
direction of ow downwards (inlet at the top , outlet at
the bottom. See Fig 1 adjacent).
The Water Block should be installed in a convenient location on the water supply line to the Zip product.
Pointer ‘P’ (see Fig.3) should be rotated until in line with the maximum required
ow at one time. Each number on the scale corresponds to 5 litres of ow i.e. 1 =
5 litres, 10 = 50 litres.
The adjustment key (see Fig.2) should be used to adjust the pointer.
The inlet should be connected via an 15mm isolation valve (not supplied).
The outlet shall be connected via the 15mm - 1/2” brass compression tting supplied.
Ensure that the direction of ow through the Water Block is correct and that
the lter screen (see Fig.2) is inserted correctly with the convex surface facing
towards the water supply.
5.4 Installation
Fig. 2
Fit key to adjust ow
Key
Reset lever
5.5 Reset Procedure
The Water Block will activate and shut off the supply if more water than the set amount is drawn off at one time.
In this event rstly isolate and de-pressurise the water supply to the Water Block, identify and repair the cause of the leak then remove the pipe-work downstream of the Water Block and press the reset button ‘H’ (see Fig.3).
The reset device (see Fig.2) may be tted to avoid disconnection. This allows the Water Block to be reset by operating the lever in the direction shown in Fig.2.
In the event of persistent tripping contact Zip for advice on 0345 6 005 005.
5.6 Maintenance
The lter screen should be checked and cleaned periodically subject to water conditions and usage.
Fig. 1
Fig. 3
Direction of ow
Seal
Reset
device
Direction of
ow
Filter
screen
Isolation valve
(not supplied)
15mm - 1/2” brass
compression tting
Water block installation
!
29
Installation instructions
805845UK v1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk w ww.zipwater.co.uk
6.1 Description
The carbonation valve has been designed to provide the installer with the ability to preset the level of
carbonation of the sparkling water, to the taste of the user. The carbonation valve can be tted at the time of installation, or retrotted to G4 Command Centres previously installed.
6.2 Installation
Attach the carbonation valve to the Command Centre using the 1/4” plastic tubing.
Attach the sparkling pipe to the outlet .
water ow
Adjustment
Inlet
Outlet
+
-
6.3 Adjustment
The carbonation valve has an adjustable ow rate. The optimum setting for the valve is 1.6 litres/minute. Use a 6mm Allen key or large at blade screwdriver to adjust the ow rate of the valve. To adjust the ow rate rotate the screw anti clockwise. Fitting this valve should reduce the splatter or spitting
of the sparkling water out of the tap. It should also produce more visible bubbles in the water. To measure
the ow rate, use a measuring cup and run the sparkling water for 15 secs. Multiply the amount of water dispensed by 4 to get the ow rate per minute.
1.6litres/min. is the optimum ow rate.
If the ow rate is adjusted too high,
the carbonation can will be emptied of water, leaving only CO2 to be
dispensed from the tap.
Section 6 Carbonation valve installation
Fitted in sparkling systems only
!
Loading...