Wunda ESBE User Manual

ESBE Pump Station
THE BRAND YOU CAN TRUST
Before you start:
Check the contents
1. Top pump connector and flow temperature gauge.
2. Circulating pump and washers.
3. bottom pump connector and return temperature gauge.
VTA322 for 2-5 port manifolds up to 60 VTA572 for 6-12 port manifolds up to 70oC
1
0800 083 2677 www.wundatrade.co.uk
Check the pump station contents against the list below.
o
C
2. Circulating pump and washers.
M11
1. Top pump connector and flow temperature gauge.
4. ESBE temperature control valve. *Small ESBE valve illustrated.
This guide is specic to our ESBE temperature control pump station and should be used in conjunction with the relevant Manifold user guide.
In the unlikely event of any shortage please contact us and a replacement will be despatched immediately. Tel. 0800 083 2677
3. bottom connector with return temperature gauge.
Revision date: 26-4-2018
ESBE Pump Station
THE BRAND YOU CAN TRUST
2
0800 083 2677 www.wundatrade.co.uk
Flow Bar
M11
Understanding how the ESBE pump station works
Warm water is pumped from the heat source to the pump set and manifold assembly. If the floor heating system requires a top up of heated water, the mixing valve will allow more heated water into the system via the inlet or release cooled water back to the heat source via the outlet. From the flow bar, warm water is distributed to each loop of pipe via the adjustable flow gauges, returning via the valves into the return bar.
Once the room to be heated reaches the required temperature, the room thermostat sends a signal to switch the pump off and close the actuators (if actuators are fitted). This shuts off the water supply to the loops of pipe in the floor and therefore shuts off the heat supply.
Before assembly of manifold or pressure test, familiarise yourself with the way the manifold works and the various stages of assembly.
Warm water from
heat source enters
Return Bar
Cool water returns to the heat source for reheating
Revision date: 26-4-2018
Loading...
+ 4 hidden pages