Workrite Ciglio Child User Manual

Workrite Ciglio LED Under-Cabinet Child Lights - Assembly Instructions #1500226 Rev A
!
Assembly Instructions:
Ciglio Under-Cabinet Light
Daisy Chain Child Models
Parts
Light Fixture
A
Qty: 1 B
When installing child units, conrm the parent unit of daisy chain is positioned so that it can be connected to the additional unit with the supplied jumper cable(s).
1
Determine if light will be afxed to a metal or wood cabinet and follow the appropriate step below.
Mount to METAL Cabinets:
Place Magnetic Mounts (B) onto back of
a
Light Fixture (A).
Attach Light Fixture to metal under-cabinet.
b
Magnets will hold the xture in place.
Universal Mounting Kit
Qty: 2
Daisy Chain Child Model
B
a
Jumper Cable, 3",
C
6", 12", 24" or 60" Qty: 1
Place lamp under cabinet
A
b
OR
Mount to Wood Cabinets:
Note: You will need a #2 Phillips-head screwdriver to complete this step.
Determine where you want to mount
a
your light and draw a straight line on the underside of the cabinet to indicate the
center along the length of the light.
Attach the Universal Mounts (B) along
b
your line with Screws provided by inserting screw through magnet and then screwing into marked location.
Attach Light Fixture (A) onto mounts.
c
Magnets will hold the xture in place.
1 of 2 Workrite Ergonomics | 800.959.9675 www.workriteergo.com
a
b
Attach Mounts
along drawn
line
8"–15" depending on size
Draw line parallel to edge of cabinet
Draw line
Under-cabinet
B
c
Lift light
onto mounts
A
Workrite Ciglio LED Under-Cabinet Child Lights - Assembly Instructions #1500226 Rev A
Attach Child Light to Parent Unit
2
Varies in length
C
Secure Jumper Cables (C) between each of the lights in the chain. The order of the lights does not matter as long as the the
Parent
Daisy Chain Child
parent unit is included in the chain.
Conrm Parent Unit is Plugged in Then Turn On
3
Conrm Parent unit is installed according to its instructions and turn on PARENT unit to turn on all daisy chained lights.
Note: Daisy chain systems can be powered via Child or Parent units.
Maximum Daisy Chain Units
!
CAUTION! To reduce the risk of re, electric
shock and injury refer to the chart at right for maximum daisy-chained units:
Daisy Chain Configuration Examples
Supports up to 80" of actual fixture length
35"
Parent
1 1 2 1 1 1 3 1 2 3
27"
Parent
1 1 1 3 1 2 3 1 1 1 3 1 3 4
20"
Parent
1 1 1 3 1 2 3 1 3 4
32"
Child /
Jumper
24"
Child /
Jumper
17"
Child /
Jumper
Maximum fixtures per daisy chain
Replacement parts
i
Universal Mounting Kit ..................................CIG-MOUNT
3" Jumper Cable ...........................................CIG-CABLE-03
6" Jumper Cable ...........................................CIG-CABLE-06
12" Jumper Cable .........................................CIG-CABLE-12
24" Jumper Cable .........................................CIG-CABLE-24
60" Jumper Cable .........................................CIG-CABLE-60
2 of 2 Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Loading...