WILKINS 450, 450DA Instructions Manual

Model 450 & 450DA
a company
®
PROTECTIVE ENCLOSURE
6" MIN.
WILKINS VALVE SETTER MJFS
DIRECTION OF FLOW
Double Check Valve Assembly (4” & 6”) Double Check Detector Assembly (4” & 6”)
Installation Testing Maintenance Instructions
(Patent No. 5,913,331)
INSTALLATION INSTRUCTIONS
CAUTION: Installation of Backow Preventers must be performed by qualied, licensed personnel. The installer should be sure the proper device has been selected for the particular installation. Faulty installation could result in an improperly functioning device.
WILKINS Model 450 Double Check Valve assemblies are for use on potable water lines where a health hazard does not exist in the event of a backow situation.
Damage to the device could result wherever water hammer and/or water thermal expan­sion could create excessive line pressure. Where this could occur, shock arrestors, check valves and/or pressure relief valves should be installed downstream of the device.
If installation is in a pit or vault, the Backow Preventer must never be submerged in water because this could cause a cross-connection. Make sure that the pit or vault always remains dry by providing ample drainage.
1. Before installing a Model 450 Backow Preventer, ush the line thoroughly to remove all debris, chips and other foreign matter. If required, a strainer should be placed upstream of the Backow Preventer. CAUTION: Do not use a strainer in seldom used emergency waterlines such as re lines.
2. Provide adequate space around the installed unit so that the test cocks will be accessible for testing and servicing.
3. Install valve at least 6 inches above surrounding ood level.
PLACING THE DEVICE IN SERVICE
1. Start with both shut-off valves closed. Slowly open the inlet shut-off valve until the backow preventer is completely pressur­ized.
2. When the unit has been pressurized, vent any trapped air by slightly opening each of the four test cocks.
3. Slowly open the downstream shut-off valve. The Model 450 Double Check Valve assembly is now in service.
4. After the Model 450 has been prop­erly installed, test the device (see “TEST PROCEDURES”). If the device fails the test, remove the rst and second check valves and thoroughly ush the device. Clean rubber and seats of all debris and place unit back in service.
4. Always consult local codes for installation methods, approvals and guidance.
TYPICAL HORIZONTAL ORIENTATION
OUTDOOR INSTALLATION
The Model 450 Backow Preventer may be installed outdoors only if the device is protected against freezing conditions. Exposure to freezing conditions will result in improper function or damage to the device. The installation location must be kept above 32°F. All the basic installation instructions apply.
INDOOR INSTALLATION
Indoor installation is preferred in areas that are subject to freezing conditions. All the basic installation instructions apply to such installations.
Proposition 65 Warning This product contains chemicals known to the State of California to cause cancer or birth defects or other reproductive harm.
WILKINS, a ZURN company
1747 Commerce Way, Paso Robles, CA 93446 Phone:805/238-7100 Fax:805/238-5766
Testing Procedures
a company
®
®
HIGH SIDE HOSE
LOW SIDE HOSE
BY PASS HOSE
LOW SIDE BLEED NEEDLE VALVE (behind body)
HIGH SIDE BLEED
NEEDLE VALVE
(behind body)
BLEED TUBE
FILTERS
#1 TEST COCK
#2 TEST COCK
#2 SHUT-OFF
VALVE
#1 SHUT-OFF
VALVE
#4 TEST COCK
#3 TEST COCK
MODEL 450 DOUBLE CHECK VALVE ASSEMBLY
Equipment Required: Differential pressure gauge test kit.
TEST NO. 1 - TIGHTNESS OF #1 CHECK VALVE
REQUIREMENT:
The static pressure drop across check valve #1 shall be at least
1.0 psid. If test cock #3 is not at the highest point of the check valve body, then a vertical tube must be installed on test cock #3 so that it rises to the top of the check valve body.
PROCEDURE:
1. Slowly open all 4 test cocks to remove any foreign material and attach ttings.
2. Attach hose from the high side of the test kit to the #2 test cock.
3. Open test cock #2 and bleed all air from the hose and gauge by opening the high side bleed needle valve. Close high side bleed needle valve. If a tube is attached to test cock #3, open test cock #3 to ll the tube. Close test cock #3. Close #2 shut-off valve then close the #1 shut-off valve.
4. Hold gauge at same level as test cock #3 or water level in tube. Slowly open test cock #3. Record the static pressure
drop across check valve #1 after gauge reading stabilizes and water stops running out of test cock #3.
5. Close all test cocks, open shut-off valve #1 and remove test equipment.
TEST NO. 2 - TIGHTNESS OF #2 CHECK VALVE
REQUIREMENT:
The static pressure drop across check valve #2 shall be at least
1.0 psid. If test cock #4 is not at the highest point of the check valve body, then a vertical tube must be installed on test cock #4 so that it rises to the top of the check valve body.
PROCEDURE:
1. Attach hose from the high side of the test kit to the #3 test cock.
2. Open test cock #3 and bleed all air from the hose and gauge by opening the high side bleed needle valve. Close high side bleed needle valve. If a tube is attached to test cock #4, open test cock #4 to ll the tube. Close test cock #4. Close #1 shut-off valve.
3. Hold gauge at same level as test cock #4 or water level in tube. Slowly open test cock #4. Record the static pressure drop across check valve #2 after gauge reading stabilizes and water stops running out of test cock #4.
4. Close all test cocks, slowly open shut-off valve #1 & #2 and remove test equipment.
2
WILKINS, a ZURN company
1747 Commerce Way, Paso Robles, CA 93446 Phone:805/238-7100 Fax:805/238-5766
Loading...
+ 2 hidden pages