
CLINICAL PRO SERIES
INSTALLATION INSTRUCTION
INSTRUCTION BOOKLET #CPS 10
Watch step by step installation instructions at:
https://www.wallbedsbywilding.com/installation-cps/
Note: Portions of the installation process will require two installers.
WARNING! ALL MURPHY SYSTEMS CONTAIN POWERFUL LIFTING COMPONENTS. FAILURE TO
USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT IN SEVERE PERSONAL INJURY TO USER OR DAMAGE TO PRODUCT. PLEASE CONTACT
CUSTOMER SERVICE AT 866-725-6401 FOR ANY QUESTIONS.
Revision 7/16

Hardware Supplied
Tools Needed
1 1/4” Wood Screw
1 1/2” Wood Screw
1 3/4” Wood Screw
2” Wood Screw
1 1/4” Pocket Hole Screw
3 1/2” Wood Screw
Qty
10
4
4
4
4
Cam Fitting
Connecting Bolt
Square Tip Bit
5/8’’ Pan head Screw
Qty
4
Spare
4
Spare
1
25
3
Cordless Screw Driver
Or Power Drill with Phillips bit
Pliers
Small Regular Screw Driver
Phillips Screw Driver
Stubby Phillips Screw Driver
Studsensor
Stud Sensor
STANLEY
Tape Measure
6’ Step Ladder
1/4” Drill Bit
(Attached to the top of the Bridge Board)
Page 1

Wall Bed Parts List
Mattress Box (complete unit)
A
B
Bridge Board
C
Left Side Board
D
Right Side Board
E
Head Board Face
F
Head Board Top
(See Below for Head Board Parts)
G
Male Pivot Point
H
Upper Plate
Lower Plate
I
J
Female Pivot Point
K
Stretcher Board
L
Lift Piston
Handle
N
Bed Stop
M
C
Page 1
K
M
B
D
F
E
L
H
G
I
N
A
Equipment Head Board Parts List
Head Board Hinged Top
A
B
Top Shelf
C
Bottom Shelf
D
Cat 5-6
E
Head Board Face
F
Power Strip
G
Right Center Partition
H
Left Center Partition
Outer Partion
I
J
Lid Support
K
Cam/Connecting Bolt
L
1/4” Back Panel
Barrel Catch Assembly (inside)
M
Hinge Assembly (inside)
N
N
J
L
I
K
C
B
A
N
H
N
M
I
D
L
F
G
E
Page 2

NOTICE: THE ILLUSTRATIONS IN THESE INSTRUCTION SHOW ASSEMBLY
WITH EXAM CABINET ON THE RIGHT. YOUR CABINETS AND CABINET PARTS
MAY VARY FROM THESE DRAWING IN THE FORM OF A MIRROR IMAGE.
Side Board Illustration
For ease of assembly, familiarize yourself with side board parts below.
Headboard Connecting
Base board cut out
Base board/Stretcher
Connecting Bolts
Bolts
Male Pivot post
(E-clip attached)
Upper Plate
(Right side board shown)
Finished edge
Grommet
Bridge board
Connecting bolts
Bed Stop
Installation Wall
Left Side Board
Step 1: Position the Mattress Box and the
right and left Side Boards face down on the
floor with the bottom of the Mattress Box
approximately 2.5 feet from the wall where
the bed will be installed.
Step 2: With a pair of pliers, remove the
E-clips from the pivot posts on the Side
Boards. Leave the white nylon spacers in
place on the posts.
E-clip
Right Side Board
Mattress Box
Mattress Box Top
Step 3: Slide the Side Board pivot posts
through the pivot holes in the Mattress
Box as illustrated. Replace the E-clips.
Page 3

Upper end
Lift Piston Illustration
Lower end
Piston Socket
: Attach the lower end of the Lift
Step 4
Piston (skinner end) onto the Lower An
chor Plate on both sides of the Mattress
Box by positioning the socket end of the
piston directly over the ball stud on the
anchor plates and pushing them on. The
piston socket will snap into place over
the ball.
Spread the Side Board tops so
Step 5:
the Mattress Box has clearance to pass
through the Mattress Box Stops on the
Side Boards. (Illustration 1)
Upper Anchor Plate
Grommet
Hole
Piston
-
Left Side Board
Mattress Box
Lower Anchor Plate
Mattress Box
Snap
This step will require two people.
Step 6:
One person will kneel down in front of
the Mattress Box and lift it up about 4 to 5
inches while the second person positions
the upper socket end of the Lift Piston
directly over the ball stud on the upper an
chor plate and snap it into place. The first
person may need to raise and lower the
Mattress Box slightly to allow the Piston
to snap on. Repeat step on opposite piston
to be snapped into place. (Illustration 2)
Illustration 1
Upper anchor plate
Left side board
Mattress
Page 4
box (slightly raised)
Mattress Box Stop
Snap
Illustration 2
Base board cut out
Piston
Lower anchor plate