FIND OUT MORE
ON THE WEB.
WILBURCURTIS.COM
Models Included
TPC2S
WILBUR CURTIS COMPANY, INC.
Service Manual, Milano Single Head Coffee Brewer
Important Safeguards & Conventions
This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an authorized Wilbur Curtis service center.
•
Do NOT immerse the unit in water or any other liquid
• To reduce the risk of fire or electric shock, do NOT open top or side panels. No user serviceable parts inside. Repair should be
done only by authorized service personnel.
•
Keep hands and other items away from hot parts of unit during operation.
Never clean with scouring powders, bleach or harsh implements.
•
Conventions
WARNINGS – To help avoid personal injury
Important Notes/Cautions – from the factory
Sanitation Requirements
IMPORTANT: Equipment
to be installed to comply
with applicable federal,
state, or local plumbing/electrical
codes having jurisdiction.
CAUTION: Please use
this setup procedure
before attempting to use
this brewer. Failure to follow the
instructions can result in injury or the
voiding of the warranty.
CAUTION: DO NOT
connect this brewer to
hot water. The inlet valve
is not rated for hot water.
The Curtis Milano Brewer is Factory Pre-Set and Ready to Go… Right from the Carton.
Following are the Factory Settings for your Coffee Brewing System:
• Brew Temperature = 200°F • Water Bypass = On for LARGE & MEDIUM Brew Only
• Brew Volume = Set to Vessel Requirement. • Sleep Mode = Off
System Requirements:
• Water Source 20 – 90 PSI (Minimum Flow Rate of 1 GPM)
• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.
SETUP STEPS
The unit should be level (left to right and front to back), located on a solid counter top. Connect a water line from the water filter to the
brewer. NOTE: Some type of water filtration device must be used to maintain a trouble-free operation. (In areas with extremely hard
water, we suggest that a sedimentary and taste & odor filter be installed.) This will prolong the life of your brewing system and enhance
coffee quality.
NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved
for cleaning underneath.
2. In some areas an approved backflow prevention device may be required between the brewer and the water supply.
1. A 3/8” NPT x 3/8” Flare elbow has been supplied for water line connection. Use tubing sized sufficiently to provide a minimum of
1.0 GPM.
2. To hookup the InterLock grinder, Locate the jack labeled “Class 2 Wiring Only” on brewer and grinder. Connect the two with the
cable plug.
3. Connect the unit to an appropriate electrical power circuit.
4. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill. When the water level in the tank rises
to the correct volume, the heating elements will energize automatically. With ADS Systems there is no danger of element burnout
caused by an empty tank.
5. The heating tank will require 20 to 30 minutes to reach operating temperature (200°F). You will be notified when READY-TO-
BREW appears on the control panel LCD screen.
6. Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
7. Brew a cycle of at least 12 ounces, to purge the water lines of any air that may be trapped after filling.
WARNING TO AVOID
SCALDING, Do not
remove brewcone while
brew light is flashing.
ISO 9001 REGISTERED
WILBUR CURTIS COMPANY
Montebello, CA 90640
BREWING INSTRUCTIONS
1. Brewer should be ON (Confirm at rear toggle switch, then press the ON/OFF button). Ready-to-Brew should read on the LCD screen.
If connected to an InterLock grinder, grinder should be on. Grind coffee at this time.
2. Place an empty Milano server under the brewcone.
3. Place a clean filter
into the brewcone.
FOR THE LATEST SPE CIFICATIONS AND INFORMATION GO TO WWW.W ILBURCURTIS.COM
4. Fill brewcone with
ground coffee.
5. Transfer filled
brewcone to
brewer.
6. Press Brew button.
Brewing will begin
immediately.
1
Your Curtis ADS System is Factory Pre-Set for Optimum Performance.
After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.
The control displays . Press ON/OFF button and the screen will display . After three seconds, is displayed.
Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached will appear on the
screen. It takes approximately 20 minutes to reach setpoint temperature of 200°F.
Control will display when temperature reaches the setpoint (200
°F). Unit is now ready to brew.
IMPORTANT NOTE:
All programming selections are performed with the three center buttons.
The symbols below the buttons are:
Scroll LEFT
Scroll RIGHT
SELECTION or ENTER to save new parameter
* When in Model Select use ThermoPro - Twin or ThermoPro - Single
for Milano brewers.
2