Whitlenge CALYPSO 9 Mk 2 Installation & Operation Instructions

ÿþ üû úþù ø÷÷ö
 û öø÷ø
WDE INS 74WDE INS 74
WDE INS 74WDE INS 74
WDE INS 74
ISSUE 1ISSUE 1
ISSUE 1ISSUE 1
ISSUE 1
APPROVED BYAPPROVED BY
APPROVED BYAPPROVED BY
JPayneJPayne
JPayneJPayne
JPayne
DATED:DATED:
DATED:DATED:
DATED:
28/03/200028/03/2000
28/03/200028/03/2000
28/03/2000
CALCAL
CALCAL
CAL
YPSO9Mk2YPSO9Mk2
YPSO9Mk2YPSO9Mk2
YPSO9Mk2
INSTINST
INSTINST
INST
ALLAALLA
ALLAALLA
ALLA
TION &TION &
TION &TION &
TION &
OPERAOPERA
OPERAOPERA
OPERA
TION INSTRUCTIONSTION INSTRUCTIONS
TION INSTRUCTIONSTION INSTRUCTIONS
TION INSTRUCTIONS
CELLAR & UNDER COUNTER BEER COOLERSCELLAR & UNDER COUNTER BEER COOLERS
CELLAR & UNDER COUNTER BEER COOLERSCELLAR & UNDER COUNTER BEER COOLERS
CELLAR & UNDER COUNTER BEER COOLERS
INSTALLATION INSTRUCTIONS.INSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.INSTALLATION INSTRUCTIONS.
INSTALLATION INSTRUCTIONS.
NOTE:NOTE:
NOTE:NOTE:
NOTE: The unit should be installed and serviced by a suitably trained person.
1. Unpack the unit from its transportation packaging and visually inspect for signs of damage.
2. Sitetheunitinaconvenientlocationinthe RoomwhereitistobeSitedandmakesure that a Mains Electricity Supply is within 2 metres. This unit should be sited to allow freecirculationofair. The unit should be fittedwithacorrectlyfusedand wired plug withafusespecified according to modelorastandardEuro plug toIEC83:1975.
NOTE:NOTE:
NOTE:NOTE:
NOTE: Sealed plugs may be fitted on new units.
3. Fillthewaterbath with clean wateruntiltheoverflowlevel is reached.
4. Ensure that the recirc pump is switched off/disconnected.
5. Turn on the unit and allow to start building the ice bank.
6. Run the python to the bar area and complete dispense head plumbing installation.
7. Ensure that the recirc pump is still off/disconnected.
8. Connectallproductlinesusingsuitablefittingsandconnectwaterrecircflowandreturn lines. Makesurealllinesarewellinsulatedandavoidrunningcoollinesnearhotwater pipes and heat sources.
9. Observe joints for any leaks.
10. Turn on/reconnect the recirc pump.
11. The system is now ready.
FUSE SPECIFICATION LIST:FUSE SPECIFICATION LIST:
FUSE SPECIFICATION LIST:FUSE SPECIFICATION LIST:
FUSE SPECIFICATION LIST:
CALYPSO 5 10A CALYPSO 9 10A CALYPSO 12 10 A