
! Tools supplied:
! Do not throw away packaging materials until assembly is complete.
! Assemble this item on a soft surface, such as cardboard or carpet, to protect fi nish.
! Proper assembly of this item requires 2 people.
teak bath tower tall
assembly instructions
Hardware
AB
bolt : 6mm x 35mm 4x
bolt : 6mm x 50mm 16x
Parts
C
top 1x
E
shelf 4x
D
Mounting Plate 2x
leg 4x
Anti Tip Kit
Nylon Strap 1x
Small Screw 2x Large Screw 2x
Page 1 of 45568852 - 03.05.08

teak bath tower tall
assembly instructions
1. Position the top (C) as shown, insert the 2 legs (D) into the opening located at each corner of the top
(C). Once the leg is fully inserted, apply bolt (A) into the center hole of the top bracing as shown.
Tighten fully using the enclosed allen key.
Allen
key
C
A
D
2. Insert the 4 Shelves (E) into the opening between the two previously-installed legs, align the holes from
the leg with the corresponding holes on the center of the shelf bracing (located on each corner). Apply
bolt (B) into the center hole of the shelf bracing as shown. Tighten fully using the enclosed Allen key.
E
E
E
E
Allen
key
B
Page 2 of 45568852 - 03.05.08

teak bath tower tall
assembly instructions
3. Insert the remaining legs (D) into the openings located at each corner of the top (C). Once the leg is fully
inserted, apply bolt (A) into the center hole of the top bracing as shown. Tighten fully using the
enclosed allen key. Align the holes from the leg with the corresponding holes on the center of the shelf
bracing (located on each corner). Apply bolt (B) into the center hole of the shelf bracing as shown.
Tighten fully using the enclosed allen key.
Allen key
A
B
Allen key
D
Page 3 of 45568852 - 03.05.08

teak bath tower tall
assembly instructions
NOTICE:
To prevent injury and property damage from unexpected tipping of furniture, we highly
recommend installation of the anti-tip kit included with this product.
Attaching tower to wall with anti-tip kit.
1. Determine where the tower is to be placed and mark location on the wall for the mounting bracket
screw holes. They should be placed approximatly 2” below the top on the back of the tower.
2. Attach the mounting bracket vertically to the wall by inserting the Long screws provided through the
holes in the bracket and tightening securely using screwdriver. Screws must penetrate wall studs for
proper installation.
3. Next using the short screws attach the 2nd bracket to the back of the tower top frame.
4. Lace the nylon strap down through the brackets. Slide the thin end of the strap through the
receiving end of the nylon strap. Pull to tighten tower snug against wall.
Mounting backet
2 long screws
2 Short screws
NOTE: There will be extra pieces left over from the anti-tip kit, please discard.
CARE INSTRUCTIONS
Hardware may loosen overtime. Periodically check that all connections are tight.
Wipe with a soft, dry cloth. To protect nish, avoid the use of chemicals and household cleaners.
Page 4 of 45568852 - 03.05.08