West Elm Newkirk Media Tower Assembly Instruction

newkirk media tower
assembly instructions
! Tools supplied: Tools required: ! Do not throw away packaging materials until assembly is complete. ! Assemble this item on a soft surface, such as cardboard or carpet, to protect fi nish. ! Proper assembly of this item requires 2 people.
AB
Bolt 12x Flat washer 12x
CD
Spring washer 12x
E
dowel 8x
Anti tip kit 2x
Shelf Support 4x
Mounting Plate 2x
Nylon Strap 2x
Small Screw 4x Large Screw 4x
Page 1 of 65554993 - 03.03.08
newkirk media tower
assembly instructions
1. Lay 1 tower end on a soft surface upright like the drawing shows. Next align 2 shelves by the holes in the end. Insert the dowels (D) into the holes on the end of shelf like drawing shows. Slide the shelves up against the tower end and bolt through the bottom of the shelf with bolt (A),spring­ washer (C), then the  at washer (D). Tighten with the supplied allen key.
Dowel
CB
A
Allen key
Page 2 of 65554993 - 03.03.08
Loading...
+ 4 hidden pages