West Elm Newkirk Media Stand Assembly Instruction

newkirk media stand
assembly instructions
!
CAUTION
The top shelf of this cart/stand is intended for use with: Plasma/HD televisions having a maximum screen size of 42 inches and weight of 00 lbs; or Tube televisions having a maximum screen size of 27 inches and weight of 95 lbs.
! Tools required:
! Do not throw away packaging materials until assembly is complete.
! Assemble this item on a soft surface, such as cardboard or carpet, to protect nish.
! Proper assembly of this item requires 2 people.
! This item comes in two boxes containing the back panel and the stand.
A B
bolt (6mm dia x 50mm) 2x
C D
metal washer 20x
E F
G
bolt (6mm dia x 22mm) 8x
lock washer 20x
metal support 2x
H
cam lock 8x cam bolt 8x
Page  of 69700923 - 06/07
newkirk media stand
assembly instructions
. Remove drawers from drawer unit. Lift up/push down plastic levers on opposite sides to release drawers while pulling out. Facing the drawers, the left lever will need to be pushed up and the right lever will need to be pushed down at the same time while pulling the drawer out. (Note : when handling the levers be aware that these may be greasy).
2. Fasten center foot to drawer unit using metal washers (C), lock washers (D), and bolts (A) in order as shown. Tighten bolts
using allen key (E).
3. Fasten side panels to drawer unit using metal washers (C), lock washers (D), and bolts (B) in order as shown. Tighten bolts
using allen key (E).
D
B
E
Page 2 of 69700923 - 06/07
Loading...
+ 4 hidden pages