• WATER TEST______________________________________________________
• CAPACITY PER UNIT _______________________________________________
• MINERAL TANK SIZE DIA.________HEIGHT_________
• BRINE TANK SIZE &
SALT SETTING PER REGENERATION: _________________________________
* CONTROL VALVE SPECIFICATIONS
1) Type of Timer (see pages 16, 17, & 18)
A) 7 day or 12 day
B) * 1,250 to 21,250 gallon meter or
* 6,250 to 106,250 gallon meter or
* Other ___________________________________________________
C) Meter Wiring Package
1) System #4 - 1 tank; 1 meter; immediate or delayed regeneration
2) System #5 - 2 tanks; 2 meters; interlock
3) System #6 - 2 tanks; 1 meter; series regeneration
4) System #7 - 2 tanks; 1 meter; alternator
2) Timer Program Settings
A) Backwash _________________________________ min.
B) Brine & Slow Rinse _________________________ min.
C) Rapid Rinse _______________________________min.
D) Brine Tank Refill ____________________________min.
3) Drain Line Flow Controller________________________gpm
4) Brine Line Flow Controller________________________gpm
6) Service Valve Operation Units (SVO)
Size of Service Valve ___________________________
Page 2
Printed in U.S.A.
MODEL 3150 Downflow
General Commercial Pre-Installation Check List
WATER PRESSURE: A minimum of 25 pounds of water pressure is required for regeneration valve to operate
effectively.
ELECTRICAL FACILITIES: A continuous 115 volt, 60 Hertz current supply is required. (Other voltages available.)
Make certain the current supply is always hot and cannot be turned off with another switch.
EXISTING PLUMBING: Condition of existing plumbing should be free from lime and iron buildup. Piping that is built up
heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit should be
installed ahead of the water softener.
LOCATION OF SOFTENER AND DRAIN: The softener should be located close to a drain.
BY-PASS VALVES: Always provide for the installation of a by-pass valve.
CAUTION: Water pressure is not to exceed 120 p.s.i., water temperature is not to exceed 100˚F, and the unit cannot be
subjected to freezing conditions.
INSTALLATION INSTRUCTIONS
1. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base.
(Maximum 7 feet apart for twin units.)
2. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should be the
same size as the drain line flow control connection. Water meters are to be installed on soft water outlets. Twin
units with (1) one meter shall be installed on common soft water outlet of units.
3. Make sure that the floor is clean beneath the salt storage tank and that it is level.
4. Place approximately 1″ of water above the grid plate (if used) in your salt tank Salt may be placed in the unit at this
time.
5. Place in by-pass position. Turn on the main water supply. Open a cold soft water tap nearby and let run a few
minutes or until the system is free from foreign material (usually solder) that may have resulted from the
installation.
6. Place the by-pass in service position.
7. Manually index the softener control into “service” position and let water flow into the mineral tank. When water flow
stops, close inlet valve,place control in “backwash” position to relieve head of air, then gradually open inlet valve to
purge remaining air in tank. Return control to “service” position.
8. Electrical: All electrical connections must be connected according to codes. Use electrical conduit if applicable.
Plug into power supply.
Printed in U.S.A.
Page 3
MODEL 3150 Downflow
Water Conditioner Flow Diagrams
1 SERVICE POSITION
INLET
INLET
TOP OF
TANK
Hard water enters at valve inlet — flows thru valve to the top of tank — down thru mineral to the
bottom distributor. Conditioned water flows to the valve, around the piston and out the outlet.
OUTLET
DRAIN
TO
BRINE
TANK
BOTTOM OF TANK
2 BACKWASH POSITION
OUTLET
INLET
DRAIN
INLET
TOP OF
TANK
BOTTOM OF TANK
Hard water enters at valve inlet — flows thru valve to the bottom of
tank — up thru mineral to top of tank, around the piston and out
the drain. Hard water is also available at valve outlet.
TO
BRINE
TANK
3 BRINE AND SLOW RINSE POSITION
OUTLET
INLET
DRAIN
INLET
TOP OF
TANK
BOTTOM OF TANK
Hard water enters at valve inlet — flows thru injector nozzle and
throat to draw brine from the brine tank — brine flows thru valve to
the top of tank — down thru mineral to bottom distributor — back
to the valve, around the piston and out the drain. Flow thru injectors continues for slow rinse for remainder of cycle. Hard water is
also available at valve outlet.
TO
BRINE
TANK
Page 4
Printed in U.S.A.
MODEL 3150 Downflow
Water Conditioner Flow Diagrams (Cont’d.)
4 RAPID RINSE POSITION
INLET
INLET
TOP OF
TANK
Hard water enters at valveinlet — flows thru valve to the top of tank — down thru mineral to bottom distributor —
back to the valve, around the piston and out the drain. Hard water is also available at valve outlet.
OUTLET
DRAIN
TO
BRINE
TANK
BOTTOM OF TANK
5 BRINE TANK REFILL POSITION
OUTLET
INLET
DRAIN
INLET
TOP OF
TANK
BOTTOM OF TANK
Hard water enters at valve inlet — flows thru nozzle and thru throat to brine valve to refill the brine tank.
Conditioned water is also available at valve outlet during this cycle.
Commercial Demand Regeneration Control
Timer Settings
Typical Programming Procedure
Calculate the gallon capacity of the system, subtract the
necessary reserve requirement and set the gallons
required by lifting the gallon dial and rotating it so that the
number of gallons required is aligned with the white dot
on program wheel gear. Release and check for firm
engagement with gear. Note, drawing shows 8,750 gallon
setting. The capacity (gallons) arrow denotes remaining
gallons exclusive of fixed reserve.
Note:
To set meter capacity at initial start-up, either:
1. Rotate manual regeneration knob one full revolution.
or
2. Rotate program wheel manually clockwise or counter
clockwise and align white dot with capacity arrow.
This procedure must be followed any time the program
wheel setting is changed.
How To Set The Time Of Day:
Press and hold the red button in to disengage the 24 hour
gear.
Turn the 24 hour gear until the actual time of day is at the
time of day pointer.
Release the red button to again engage the 24 hour gear.
How To Manually Regenerate Your Water Conditioner
At Any Time:
Turn the manual regeneration knob clockwise one “click.”
This slight movement of the manual regeneration knob
engages the program wheel and starts the regeneration
program.
The black center knob will make one revolution in the
following approximately three hours and stop in the
position shown in the drawing.
Even though it takes three hours for this center knob to
complete one revolution, the regeneration cycle of your
unit might be set for only one half of this time.
In any event, conditioned water may be drawn after rinse
water stops flowing from the water conditioner drain line.
Immediate Regeneration Timers:
These timers do not have a 24 hour gear. Setting the
gallons on the program wheel and manual regeneration
procedure are the same as previous instructions.
* 24 HOUR
GEAR
MANUAL
REGENERATION
KNOB
Page 16
SERVICE
POSITION
INDICATOR
RED TIME
SET BUTTON
WHITE DOT
* Immediate regeneration timers do not have 24 hour gear. No time of day can be set.
Printed in U.S.A.
GALLONS LABEL
PROGRAM
WHEEL
MODEL 3200 TIMER
Timer Setting Procedure
How To Set Days On Which Water
Conditioner Is To Regenerate:
Rotate the skipper wheel until the number “1” is at the red
pointer. Set the days that regeneration is to occur by sliding
tabs on the skipper wheel outward to expose trip fingers.
Each tab is one day. Finger at red pointer is tonight. Moving
clockwise from the red pointer, extend or retract fingers to
obtain the desired regeneration schedule.
How To Set The Time Of Day:
Press and hold the red button in to disengage the drive gear.
Turn the large gear until the actual time of day is at the time
of day pointer.
Release the red button to again engage the drive gear.
How To Manually Regenerate Your Water
Conditioner At Any Time:
Turn the manual regeneration knob clockwise.
This slight movement of the manual regeneration knob
engages the program wheel and starts the regeneration
program.
The black center knob will make one revolution in the
following approximately three hours and stop in the position
shown in the drawing.
Even thought it takes three hours for this center knob to
complete one revolution, the regeneration cycle of your unit
might be set only one half of this time.
In any event, conditioned water may be drawn after rinse
water stops flowing from the water conditioner drain line.
SERVICE
POSITION
INDICATOR
RED TIME
SET BUTTON
24 HR. GEAR
MANUAL REGENERATION KNOB
SKIPPER WHEEL, 12 DAY
(SHOWS EVERY OTHER
DAY REGENERATION)
How to Adjust Regeneration Time:
1. Disconnect the power source.
2. Locate the three screws behind the manual regeneration
knob by pushing the red button in and rotating the 24
hour dial until each screw appears in the cut out portion
of the manual regeneration knob.
3. Loosen each screw slightly to release the pressure on
the time plate from the 24 hour gear.
4. Locate the regeneration time pointer on the inside of the
24 hour dial in the cut out.
5. Turn the time plate so the desired regeneration time
aligns next to the raised arrow.
6. Push the red button in and rotate the 24 hour dial.
Tighten each of the three screws.
7. Push the red button and locate the pointer one more
time to ensure the desired regeneration time is correct.
8. Reset the time of day and restore power to the unit.
IMPORTANT!
SALT LEVEL MUST ALWAYS BE ABOVE WATER LEVEL IN BRINE TANK
Printed in U.S.A.
3200 ADJUSTABLE REGENERATION TIMER
Page 17
MODEL 3200 & 3210 TIMER SERIES
Regeneration Cycle Program Setting Procedure
How To Set Regeneration Cycle Program:
The regeneration cycle program on your water conditioner
has been factory preset, however, portions of the cycle or
program may be lengthened or shortened in time to suit
local conditions.
3200 & 3210 Series Timers (Figure to Right)
To expose cycle program wheel, grasp timer in upper lefthand corner and pull, releasing snap retainer and swinging
timer to the right.
To change the regeneration cycle program, the program
wheel must be removed. Grasp program wheel and
squeeze protruding lugs toward center, lift program wheel
off timer. (Switch arms may require movement to facilitate
removal.)
Return timer to closed position engaging snap retainer in
back plate. Make certain all electrical wires locate above
snap retainer post.
BRINE & RINSE
SECTION
(2 MIN. PER HOLE)
PIN STORAGE
PROGRAM
WHEEL FOR
CONTROL OF
REGENERATION
CYCLE
RAPID
RINSE
SECTION
(2 MIN.
PER PIN)
BRINE TANK
REFILL
SECTION
(2 MIN.
PER HOLE)
Timer Setting Procedure for 3200 & 3210 Timer
How To Change The Length Of The Backwash Time:
The program wheel as shown in the drawing is in the
service position. As you look at the numbered side of the
program wheel, the group of pins starting at zero
determines the length of time your unit will backwash.
FOR EXAMPLE: If there are six pins in this section, the
time of backwash will be 12 min. (2 min. per pin). To
change the length of backwash time, add or remove pins
as required. The number of pins times two equal the
backwash time in minutes.
How To Change The Length Of Brine And Rinse Time:
The group of holes between the last pin in the backwash
section and the second group of pins determines the
length of time that your unit will brine and rinse (2 min. per
hole).
To change the length of brine and rinse time, move the
rapid rinse group of pins to give more or fewer holes in the
brine and rinse section. Number of holes times two equals
brine and rinse time in minutes.
How To Change The Length Of Rapid Rinse:
The second group of pins on the program wheel
determines the length of time that your water conditioner
will rapid rinse (2 min. per pin).
BACKWASH
SECTION
(2 MIN. PER PIN)
To change the length of rapid rinse time, add or remove
pins at the higher numbered end of this section as
required. The number of pins times two equals the rapid
rinse time in minutes.
How To Change The Length Of Brine Tank Refill Time:
The second group of holes in the program wheel
determines the length of time that your water conditioner
will refill the brine tank (2 min. per hole).
To change the length of refill time, move the two pins at the
end of the second group of holes as required.
The regeneration cycle is complete when the outer
microswitch is tripped by the two pin set at end of the brine
tank refill section. The program wheel, however, will
continue to rotate until the inner microswitch drops into the
notch on the program wheel.
Page 18
Printed in U.S.A.
MODEL 3150 Downflow
Service Instructions
PROBLEMCAUSECORRECTION
1.Softener fails to regenerate.A. Electrical service to unit has
been interrupted.
B. Timer is defective.
C. Power failure.
2.Hard water.A. By-pass valve is open.
B. No salt in brine tank.
C. Insufficient water flowing into
brine tank.
D. Hot water tank hardness.
E. Leak at distributor tube.
F.Internal valve leak.
3.Unit used too much saltA. Improper salt setting.
B. Excessive water in brine tank.
A. Assure permanent electrical
service (check fuse, plug, pull
chain or switch).
B. Replace timer.
C. Reset time of day.
A. Close by-pass valve.
B. Add Salt to brine tank and maintain
salt level above water level.
C. Check brine tank fill time and clean
brine line flow control if plugged.
D. Repeated flushing of the hot water
tank is required.
E. Make sure distributor tube is not
cracked. Check O-ring and tube
pilot.
F.Replace seals and spacers and/or
piston.
A. Check salt usage and salt
setting.
B. See Problem No. 7.
4.Loss of water pressure.A. Iron buildup in line to water
conditioner.
B. Iron buildup in water conditioner.
C. Inlet of control plugged due to
foreign material broken loose
from pipeby recent work done on
plumbing system.
5.Loss of mineral through drain line.A. Air in water system.
b.Improperly sized drain line flow
control.
6.Iron in conditioned water.A. Fouled mineral bed.A. Checkbackwash, brine draw and
A. Clean line to water conditioner.
B. Clean control and add mineral
cleaner to mineral bed. Increase
frequency of regeneration.
C. Remove pistons and clean control.
A. Assure that well system has
proper air eliminator control.
Check for dry well condition.
B. Check for proper drain rate.
brine tank fill.Increase frequency
of regeneration. Increase
backwash time.
Printed in U.S.A.
Page 19
MODEL 3150 Downflow
PROBLEMCAUSECORRECTION
7.Excessive water in brine tankA. Plugged drain line flow control.
B. Plugged injector system.
C. Timer not cycling.
D. Foreign material in brine valve.
E. Foreignmaterial in brine line flow
control.
8.Softener fails to draw brine.A. Drain line flow control is plugged.
B. Injector is plugged.
C. Line pressure is too low.
D. Internal Control Leak.
9.Control cycles continuously.A. Missadjusted, broken or shorted
switch.
10. Drain flows continuously.A. Valve is not programming
correctly.
B. Foreign material in control.
C. Internal control leak
A. Check flow control.
B. Clean injector and screen.
C. Replace timer.
D. Replace brine valve seat and clean
valve.
E. Clean brine line flow control.
A. Clean drain line flow control.
B. Clean injector.
C. Increase line pressure to 25 P.S.I.
min.
D. Check drive motor and switches.
A. Determine if switch or timer is
faulty and replace it, or replace
complete power head.
A. Check timer program and
positioning of control. Replace
power head assembly if not
positioning properly.
B. Remove power head assembly and
inspect bore, remove foreign
material and check control in
various regeneration positions.
C. Replace seals and piston assembly.
General Service Hints
Problem: Softener Delivers Hard Water.
Cause could be that . . . Reserve Capacity Has Been Exceeded.
Correction: Check salt dosage requirements and reset program wheel to provide additional reserve.
Cause could be that . . . Program Wheel Is Not Rotating With Meter Output.
Correction: Pull cable out of meter cover and rotate manually. Program wheel must move without binding and clutch
must give positive “clicks” when program wheel strikes regeneration stop. If it does not, replace timer.
Cause could be that . . . Meter Is Not Measuring Flow.
Correction: Check meter with meter checker.
Page 20
Printed in U.S.A.
3150 System #4
Valve Wiring
Printed in U.S.A.
Page 21
3150 System #4 With Remote Meter
Valve Wiring
Page 22
Printed in U.S.A.
3150 System #5
Valve Wiring
Printed in U.S.A.
Page 23
3150 System #6
Valve Wiring
Page 24
Printed in U.S.A.
3150 24V/120V System #7
Valve Wiring
Printed in U.S.A.
Page 25
3150 230V System #7
Valve Wiring
Page 26
Printed in U.S.A.
MODEL 3150
System #4 - Typical Single Tank Installation With Optional Meter
OUT
MANUAL
SHUTOFF
OPTIONAL
3100 METER
DRAIN
3 WIRE
POWER CORD
BRINE LINE
BRINE TANK
RESIN TANK
System #5 Interlock - Typical Twin Tank Installation with
Optional Meter Interlock and No Hard Water Bypass
DIAPHRAGM
MANUAL
SHUTOFF
IN
DRAIN
RESIN TANK
ELECTRICAL
INTERLOCK
CORD
UNIT 1
OPERATED VALVE
PRESSURE
SUPPLY
TO S.V.O.
3 WIRE
POWER CORD
BRINE TANK
BRINE LINE
RESIN TANK
UNIT 2
BRINE TANK
Page 27
Printed in U.S.A.
MODEL 3150
System #6 - Twin Series Regeneration Installation with a Remote Meter
drain
BRINE LINE
BRINE TANK
IN
PRESSURE SUPPLY
TO S.V.O.
RESIN TANK
UNIT 2
MANUAL
SHUTOFF
BRINE TANK
OUT
ELECTRICAL
INTERLOCK
CORD
RESIN TANK
UNIT 1
METER
DIAPHRAGM
OPERATED VALVE
3 WIRE
POWER CORD
System #7 - Twin Alternator Installation with a Remote Meter