WARNING- To prevent risk of electrical shock, connect this system to a
properly grounded, grounding-type power supply receptacle that is protected
by a Ground Fault Circuit Interrupter. Pull plug before servicing or replacing
lamp. Keep all connections dry and off the ground. Do not touch plug with we
hands.
WARNING- Do not look directly at the UV lamp when it is operating. The
light emitted by the lamp will cause serious eye damage and burn unprotected
skin.
WARNING- Read manual before installing or servicing this system. Only
authorized personnel possessing a strong understanding of this system should
attempt to replace lamp or service this system.
WateRx Corporation
6761 Bramble Avenue
Cincinnati, OH 45227
Water Quality Parameters
Reactor Chamber Installation
with a sensor are not to be
These are recommended levels, for use as a guideline for pre-treatment requirements.
Iron: < .3 PPM (.3 mg/L)
Hardness: < 120 PPM (7 Grains per Gallon)
% UVT: > 75%
Total Suspended Solids (TSS): < 5 PPM (5 mg/L)
To meet the water quality parameters described above, you may need to pre-treat your water
to ensure appropriate disinfection. Pre-treatment systems can be comprised of one or a
combination of the following elements:
Sediment Filter (5 micron)
Carbon Filter
Iron Removal System
Water Softener
Cyst reduction filter (ANSI/NSF Standard 53 listed)
Pre treatment equipment must be installed BEFORE the UV reactor. Note: Shut off valves
should be installed before and after the UV unit.
Equipment Sequence
Source Pre-treatment Flow UV System For Consumption
Equipment Restrictor
(Pump) (Softener, Filter) (Optional) (Reactor)
Note: Systems equipped
installed horizontally.
1. To protect your power supply, you
first plugged in, the alarm may sound
Models D, E, F, Pro7 and Pro 15 Installation
Models B & C Installation
must use a surge protector.
2. Determine the location referring to
information on pages 2, 3, and 4.
3. Attach Reactor Clamp(s) to the wall.
4. Insert Reactor and tighten clamp(s)
referring to diagram on page 2.
5. Connect to plumbing.
6. Mount power supply to wall.
7. Attach both ground wire
(green/yellow) and strain relief (red)
to the ground stud located beside the
lamp port (outlet end). Secure both
wires with locknut provided (see
Figure 9, pg 10).
Installation
8. Insert Lamp/ Sleeve assembly (see
Figures 10,11,12 page 10).
9. Attach Lamp Harness to lamp (see
Figures 10,11,12 page 10).
10. Plug your Ultraviolet system into the
outlet. Note: When the UV system is
temporarily until the lamp is
operational.
11. Clean the distribution lines:
Model A 120V Installation
Model A 230V Installation
Once the UV system is
installed, any contamination in
the distribution lines between
the UV system and your water
outlets must be removed.
Similarly, if the power goes out
and your Ultraviolet system is
not equipped with an
automatic shut-off feature, you
must also disinfect the
downstream distribution lines.
To perform this cleaning
operation, first make sure the
UV system
filter housing and fill the filter
container with bleach (remove
the filter for this process).
Replace the filter housing and
allow water to flow to all
faucets (hot and cold, inside
and outside the house), your
washing machine, toilets, and
all other water outlets. Once
you can smell the bleach, allow
it to sit in the lines for two to
four hours, and then
completely flush all the lines a
minimum of five minutes and
replace the filter. Any
contamination will have been
removed.
is on. Remove a
NOTE: The UV system must
remain on during and
following this procedure.