WateRx UV8 User Manual

SAFETY
Attention!
WARNING- To prevent risk of electrical shock, connect this system to a properly grounded, grounding-type power supply receptacle that is protected by a Ground Fault Circuit Interrupter. Pull plug before servicing or replacing lamp. Keep all connections dry and off the ground. Do not touch plug with we hands.
WARNING- Do not look directly at the UV lamp when it is operating. The light emitted by the lamp will cause serious eye damage and burn unprotected skin.
WARNING- Read manual before installing or servicing this system. Only authorized personnel possessing a strong understanding of this system should attempt to replace lamp or service this system.
WateRx Corporation
6761 Bramble Avenue
Cincinnati, OH 45227
Water Quality Parameters
Reactor Chamber Installation
with a sensor are not to be
These are recommended levels, for use as a guideline for pre-treatment requirements.
Iron: < .3 PPM (.3 mg/L)
Hardness: < 120 PPM (7 Grains per Gallon)
% UVT: > 75%
Total Suspended Solids (TSS): < 5 PPM (5 mg/L)
To meet the water quality parameters described above, you may need to pre-treat your water to ensure appropriate disinfection. Pre-treatment systems can be comprised of one or a combination of the following elements:
Sediment Filter (5 micron)
Carbon Filter
Iron Removal System
Water Softener
Cyst reduction filter (ANSI/NSF Standard 53 listed)
Pre treatment equipment must be installed BEFORE the UV reactor. Note: Shut off valves should be installed before and after the UV unit.
Equipment Sequence
Source Pre-treatment Flow UV System For Consumption
Equipment Restrictor
(Pump) (Softener, Filter) (Optional) (Reactor)
Note: Systems equipped
installed horizontally.
1. To protect your power supply, you
first plugged in, the alarm may sound
Models D, E, F, Pro7 and Pro 15 Installation
Models B & C Installation
must use a surge protector.
2. Determine the location referring to information on pages 2, 3, and 4.
3. Attach Reactor Clamp(s) to the wall.
4. Insert Reactor and tighten clamp(s) referring to diagram on page 2.
5. Connect to plumbing.
6. Mount power supply to wall.
7. Attach both ground wire (green/yellow) and strain relief (red) to the ground stud located beside the lamp port (outlet end). Secure both wires with locknut provided (see Figure 9, pg 10).
Installation
8. Insert Lamp/ Sleeve assembly (see Figures 10,11,12 page 10).
9. Attach Lamp Harness to lamp (see Figures 10,11,12 page 10).
10. Plug your Ultraviolet system into the outlet. Note: When the UV system is
temporarily until the lamp is operational.
11. Clean the distribution lines:
Model A 120V Installation
Model A 230V Installation
Once the UV system is installed, any contamination in the distribution lines between the UV system and your water outlets must be removed. Similarly, if the power goes out and your Ultraviolet system is not equipped with an automatic shut-off feature, you must also disinfect the downstream distribution lines.
To perform this cleaning operation, first make sure the UV system filter housing and fill the filter container with bleach (remove the filter for this process). Replace the filter housing and allow water to flow to all faucets (hot and cold, inside and outside the house), your washing machine, toilets, and all other water outlets. Once you can smell the bleach, allow it to sit in the lines for two to four hours, and then completely flush all the lines a minimum of five minutes and replace the filter. Any contamination will have been removed.
is on. Remove a
NOTE: The UV system must remain on during and following this procedure.
Loading...
+ 8 hidden pages