Table of Contents
CHILLER SAFETY..................................................................... 2
ASSISTANCE OR SERVICE...................................................... 3
INSTALLATION REQUIREMENTS.......................................... 3
Tools and Parts........................................................................... 3
Location Requirements............................................................ 4
Electrical Requirements........................................................... 4
Water Supply Requirements.................................................. 5
INSTALLATION INSTRUCTIONS............................................ 5
Install the Chiller........................................................................ 5
Table des matières
SÉCURITÉ DU REFROIDISSEUR............................................ 8
ASSISTANCE OU SERVICE...................................................... 9
EXIGENCES LORS DE L’INSTALLATION................................ 9
Outils et pièces........................................................................... 9
Exigences concernant l’emplacement................................10
Exigences concernant l’électricité........................................10
Exigences concernant l’alimentation d’eau......................11
INSTRUCTIONS POUR L’INSTALLATION............................11
Installation du refroidisseur...................................................11
CHILLER USE........................................................................... 6
Setting the control..................................................................... 6
Draining the Chiller................................................................... 6
Reconnecting the Chiller......................................................... 6
BEFORE CALLING FOR SERVICE.......................................... 6
TROUBLESHOOTING.............................................................. 7
CHILLER WARRANTY............................................................. 7
UTILISATION DU REFROIDISSEUR..................................... 12
Régler les contrôles..................................................................12
Vider le refroidisseur................................................................12
Reconnecter le refroidisseur..................................................12
AVANT D’APPELER................................................................ 13
QUESTIONS FRÉQUENTES................................................... 13
GARANTIE DU REFROIDISSEUR......................................... 14
Chiller safety
Your safety and the safety of others are very important.
We have provided many impor tant safety messages in this manual and on your appliance. Always read
and obey all safety messages.
This is the safety alert symbol.
This symbol alerts you to potential hazards that can kill or hur t you and others.
All safety messages will follow the safety alert symbol and either the word “DANGER” or “WARNING”.
These words mean:
You can be killed or seriously injured if you don’t immediately
follow instructions.
You can be killed or seriously injured if you don’t
follow instructions.
All safety messages will tell you what the potential hazard is, tell you how to reduce the chance of injury,
and tell you what can happen if the instructions are not followed.
2
Location Requirements
IMPORTANT:
For best performance, allow a 2” (5 cm) space around the side and the top. Do not put any objects on top of the chiller that could
obstruct the fan.
3
1. Chiller unit
2. Blue tubing included
with chiller
4
2
3. Faucet is required
(sold separately)
4. Cold water supply line
11
9
10
5
1
5. White tubing included
with chiller
6. Filtration
(sold separately)
7. Water supply fitting
7
10
8
5
14.75"
(37.46 cm)
(sold separately)
8. Filter inlet
9. Filter outlet
10 “T” quick connect fitting
11. Check valve
6
8.72"
(22.14 cm)
10.30"
(26.16 cm)
Electrical Requirements
A 120-volt, 60-Hz, 15- or 20-amp, grounded electrical supply is required.
It is recommended that a separate circuit serving only your chiller unit
be provided. Use an outlet that cannot be turned on/off by a switch.
Recommended Ground Method
The chiller must be grounded. This appliance is equipped with a power
supply cord with a 3 prong ground plug. To minimize possible shock
hazard, the cord must be plugged into a mating, 3 prong, ground-type
outlet, grounded in accordance with all national and local codes and
ordinances. If a mating outlet is not available, it is the personal
responsibility and obligation of the customer to have a properly
grounded, 3 prong outlet installed by a qualified electrician.
4
Water Supply Requirements
If local codes permit, the chiller feed line should be connected
to the cold water supply line with a ‘’T’’ water line connector
(sold separately). If you are using a filtration unit, the chiller
should be connected after the filters.
IMPORTANT: If local codes do not permit the use of the ‘’T’’
water line connector, special feed valves can be obtained from
your local plumbing supply retailer.
Caution: The feed valve must allow water to flow back into the
building’s water supply piping to avoid extreme pressure building
up as the water is chilled. Failure to relieve this pressure will
damage the chiller system and result in a water leak.
The water pressure to the chiller should be between 30 psi (MIN)
and 100 psi (MAX).
NOTE: If you are installing the chiller and a filtration system
without a bladder tank, follow steps 6a to 12. Following these
steps will avoid the possibility of excessive pressure building as
the chiller cycles on and off. If you are installing a bladder tank
with your filtration system, the bladder tank must be connected
directly to the chiller without any regulators or back flow
preventers between them. If you are NOT installing the chiller
with a filtration system or if your filter system includes a bladder
tank, follow steps 6b. and 10 to 12.
6a.Connect “T” (part 10) to “water out“ chiller tube. Connect blue
tubing between “T” and faucet, sold separately. (see figure 2)
Check valve
(part 11)
White tubing
to check valve
Blue tubing to faucet
Installation Instructions
How to insert/remove tubing in easy connect fitting
Insert the tubing squarely. See figure A.
Make sure to insert tubing completely. See figure B.
Push in collet and pull out tubing. See figure C.
Figure A Figure B Figure C
Install the Chiller
NOTE: Tubing must be cut to fit. All tubes must be cut squarely
with no burrs. All tubing connections must be fully seated.
Tubing must be routed to avoid sharp bends and have enough
slack to avoid straining connections. A P-clip and mounting
screw are included to hold the tubing in place as needed. Pull
gently on each connection to make sure they are secure.
IMPORTANT: After chiller is unpacked, place chiller upright for
24 hours before plugging it in.
1. Determine where you will install your chiller.
See ‘’Location Requirements’’ section.
2. For best performance, allow a 2” (5 cm) space around
the side and the top. Do not put any objects on top of
the chiller that could obstruct the fan.
3. Shut off water supply valves.
4. Install faucet (sold separately).
See faucet’s Installation instructions.
5. Cut a piece of white tubing to connect the chiller (water in)
to the water supply fitting (part 7) or filter outlet (if applicable).
(see figure 1)
part 10
“T” Quick connect fitting
(part 10)
Connection to Chiller
Figure 2
water “out”
6b.If you are NOT installing a filtration system, connect blue
tubing between the”water out” chiller tube and faucet, sold
seperately. Do NOT use “T” quick connect fittings (part 10) or
check valve (part 11).
7. Cut 6 inches of white tubing. Connect one end to “T”
(part 10) that is connected to “water out” chiller tube and
other end to check valve inlet ( see figure 2).
8. Cut white tubing to connect the water supply fitting
(part 7) and the inlet of the filtration system. Connect the
straight-thru ports of the second “T” (part 10) to the loose
ends of the white tubing just cut. (see figure 3)
9. Connect white tubing included with chiller between the third
port of the second “T” (part 10) and check valve outlet (see
figure 3).
White tubing
to filtration system
Check valve
(part 11)
“T” Quick
connect fitting
(part 10)
Connection to part 7
Figure 3
10.Slowly turn on the water supply valve. Open faucet until
water flows for about one minute. Check all connections
for leaks.
11.Plug in the chiller.
12.Prior to drinking water from chiller, flush water
through the chiller for about 5 minutes.
part 7
Figure 1
part 10
5