Install WARRIOR front cross member using the bolts you removed in step six (6) above with flat
washers, PLUS two(2) additional _” x 1” bolts supplied, also with flat washers and nuts. Tighten all
six (6) bolts, three (3) on each side, after all have been installed. Tighten factory bolts to factory
torque specifications, approximately 62 ft. lbs. and the _” bolts and nuts to 65 ft. lbs. of torque.
8) Remove front leaf spring rear brackets from the frame.
9) Clean frame thoroughly for welding purposes.
10) Measure 44 _” from the center of the front leaf spring mounting hole on your new WARRIOR
front bracket to the frame, make a scribe mark on the frame. Clamp rear WARRIOR bracket
to frame so measurement of 44 _” is centered in middle of hole in rear bracket. Before welding
be sure your new shackle will look like the picture A-4. If your not sure, install the front leaf
spring in the WARRIOR front bracket, install your warrior H-shackle to the rear of the spring,
install new bushings in the WARRIOR frame bracket, hook up the H-shackle to the frame
bracket and compare to picture A-4. Do not tighten bolts. If necessary, adjust the frame
bracket on the frame slightly to make it similar to picture A-4. The shackle should be straight
down to approximately 10 degrees forward, but no more. If you have after market springs this
measurement may vary slightly, so clamp shackle hanger to frame at that distance and
assemble the system. With vehicle back on the ground, adjust placement of shackle hanger to
assure the shackle will be pointed towards the front of the vehicle slightly at an angle of 0 to 10
degrees. Mark that location and then weld the hangers in place.
***IF YOU ARE IN DOUBT, CALL FACTORY BEFORE WELDING***
11) Proceed with welding of the frame bracket in accordance with picture A-5. IMPORTANT: Do
not weld completely around frame bracket but only in accordance with picture A-5. Not abiding
by this welding pattern will void all warranties.
12) If not done in step ten above, install front leaf springs with your WARRIOR H-bracket. The
front bolt is a 4” x 7/16”and the rear bolts are 41/2” x _”. Tighten front leaf spring bolt to 45 ft.
lbs. rear leaf spring bolt to 35 ft. lbs. and shackle frame bracket to 35 ft. lbs.
13) Lower front housing onto leaf springs, be sure leaf spring locating pin is in correct location,
reinstall front u-bolts, replace all that were stripped upon removal, not supplied in kit, torque to
factory specifications.
14) Install front wheels and tires, tighten to factory specifications.
15) Check all bolts for tightness, yes again.
16) For added strength you may wish to tac-weld front leaf spring bracket, do not make
continuous welds, paint all welds after they have had time to cool.
17) Lower Jeep to floor and test drive. Please inspect all bolts for tightness and all welds for
fractures.
18) Enjoy the way your Jeep now drives with your SR-180 SYSTEM.
*** ALL WELDING MUST BE DONE BY A CERTIFIED WELDER***