WarmlyYours TempZone Twin Circuit Check User Manual

Circuit Check Installation
1. LAY OUT THE WARMLYYOURS WARMING SYSTEM ROLL(S)
Lay out the roll(s) in accordance with the design layout and instructions provided by WarmlyYours.
2. TEST THE CIRCUIT CHECK
Before connecting any wires, install the batteries in the device and turn it "on" and "off" to test the alarm. After confirming that the alarm is in good working order, connect the wires as follows:
- Connect Black inner conductor core wire to the Black terminal.
- Connect 2nd inner conductor core wire to the Red terminal.
THERE ARE TWO WAYS OF DOING THE NEXT STEP:
2.1 Split the ground sheath in two, connect one half of the ground sheath to the green terminal, turn on the Circuit Check and touch the other half of the ground sheath to one of the inner conductor wires;
2.2 Install the entire ground into the green terminal. Turn on unit and use a paper clip as a bridge between the ground wire and either one of the inner conductors.
Either method should activate the alarm. If the Circuit Check does not pass all these tests, please call WarmlyYours Customer Service at (800) 875-5285.
3. ACTIVATE THE CIRCUIT CHECK AND PROCEED TO INSTALL FLOORING
4. IF THE CIRCUIT CHECK ALARM SOUNDS, STOP!
The alarm sounding indicates a short in the circuit or break in the system. Check the trouble shooting guide in the WarmlyYours installation manual or call 24/7 Installation Support at (800) 875-5285.
WarmlyYours can ship a splice kit to repair the short. Alternatively, the wire may be repaired by an electrician. Please see the wire repair document on www.warmlyyours.com, or call us 24/7
at (800) 875-5285.
Note1: This device is NOT an Ohm meter. WarmlyYours requires that the roll be tested before, during and after installation with a Digital Ohm meter.
Please turn over to view detailed illustrations for wiring
Tempzone to the Circuit Check
Installation Support • No Nonsense™ Warranty •(800) 875-5285 • www.WarmlyYours.com
10061-A
Rev 8/11
CORE
RED
SHEATH
BLACK
GREEN
(Sheath)
Circuit Check Installation
Wiring Tempzone to Circuit Check
Yellow (120V) or Red (240V) Inner Lead
CORE
Copper
ON OFF
COLD LEAD
Black Inner Lead
Wire Construction
Ground Sheath
BLACK WIRE
CORE
RED
SHEATH
BLACK
GREEN
(Sheath)
BRAIDED GROUND SHEATH
CORE
Black Inner Lead
Testing the Circuit Check
Yellow (120V) or Red (240V) Inner Lead
Copper Ground Sheath
CORE
RED
SHEATH
GREEN
(Sheath)
RED 240V
or
YELLOW 120V
BLACK
Yellow (120V) or Red (240V) Inner Lead
CORE
Copper Ground Sheath
Paperclip
Black Inner Lead
Installation Support • No Nonsense™ Warranty •(800) 875-5285 • www.WarmlyYours.com
10061
Rev 1/11
Loading...