Warmington Nouveau Pizzeria SN1250 Double Flue, Nouveau Pizzeria SN1500 Double Flue, Nouveau Pizzeria SN1800 Double Flue, Nouveau Pizzeria SN2000 Double Flue Installation Instructions Manual

16 December 2014
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior no tification.
All Dimension are in mm……. Copyright on all products and Specifications ©
1
Nouveau Pizzeria SN1250-1500-1800-2000 Double Flue
Note: FLUE SYSTEMS Casing….
Flue system may require to be Doubled lined to comply. Ref ASNZS:2918:2001 4.3 Flue pipe casing
Visit www.warmington.co.nz for Spec’s, DWG’s and PDF uploads of Fires
Fire, Flue System and Instructions to Comply with ASNZS 2918:2001
Keep these Instructions for further reference……Ensure that you have the correct and current Installation details for the Warmington Fire
Installation
The Warmington unit is to be Installed by a Certified Warmington Installer or an Approved NZHHA Installation Technician .
See www.homeheat.co.nz/members for a Certified NZHHA SFAIT Installer in your area .
IMPORTANT
Read all the Instructions carefully before commencing the Installation. Failure to follow these Instructions may result in a Fire Hazard and void the warranty .
Hearth
Warmington Outdoor Firebox
ACC Concrete Heat Cell (Not Load Bearing)
Important Note :
All Load Bearing Structures are to be Engineered to carry load .
Outdoor Cooking Fire - Wood Burner
Installation Instructions
Warmington
Minimum 2.4m Double
Flue Kit
16 December 2014
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior no tification.
All Dimension are in mm……. Copyright on all products and Specifications ©
2
POINTS TO CONSIDER PRIOR TO INSTALLATION
Location of the fire. Open fires are better located at one end of a room or area, as they project the heat away from their opening.
Venting to the cavity.
This air is to allow the cavity to vent the warm air. This warm air helps keep the fire and flue system form getting to cold. If the flue
and fire get to cold the system may soot often and require cleaning. Each fire has different ways of venting the cavity.
The Topography of the land .
The slope and position of the land in relation to the home has a bearing on how the wind will interact with the fire and flue system.
Care needs to be taken to ensure that the flue termination is in the correct position to maximise performance.
The prevailing wind.
Care needs to be taken to ensure that the flue termination is in the correct position as wind and gusts that hits the flue and cowl
system may overcome the cowl and draft back down the flue into the home. This can be a combination of down draft and high pressure.
Hearth and plinth:
The height of the hearth off the floor. The finishing that is to be used on the hearth is to be allowed for at the design stage.
Positioning of the Flue system:
There is a maximum distance that an offset flue can be installed. Reference to AS/NZS : 2918
Flue And Fire Clearance:
To be maintained to the manufactures Instructions.
Installation Notes:
A rebate of 40mm is recommended from the front face of the surround to the front of the fire to reduce the ingress of water into the fire.
Due to the expansion and contraction of metal fireplaces a 3mm gap between the flange and the finished surround should be maintained.
Prior to Construction and Installation Important Notes: Install to AS/NZS 2918:2001. Install to manufacture’s specifications. All new installations require a permit. For special requirements concerning materials (timber mantle and surrounds) within close proximity of Warmington products, please contact
your local Warmington Technical Consultant.
Stage 1: Frame Construction Procedure by Builder.
Mark out flue centre. Mark out heat cell clearance requirements. Construct plinth only, to required height. *
Stage 2: Install Procedure by Certified “Warmington Installer” only.
Fit fire to plinth. Fit adaptor to Firebox. Construct ACC enclosure around Nouveau firebox. (Ensure a 40mm rebate to form a drip line). Fit flue system. Fit cowl and flashing system
Stage 3: Finishing Procedure by Builder.
Construct hearth to required thickness. * Finish ACC enclosure and hearth to customers requirements (e.g. paint / tiles ). Close in ACC enclose and chimney chase . ( If in timber Alcove ). * Note: certified installer can install hearth and plinth.
Ensure that the Warmington and flue system is swept annually or more frequently if required.
To sweep flue and firebox:
Cover front of fire with sheets. Remove cowl from top of chimney. Sweep from the top, down the flue. Remove all soot and ash. Ensure cowl and bird protection is clean and replaced.
Visually inspect fireplace and flue system.
INSTALLATION ORDER OF OPERATIONS
16 December 2014
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior no tification.
All Dimension are in mm……. Copyright on all products and Specifications ©
3
WARMINGTON NOUVEAU FIREBOX DIMENSIONS
ACC CONCRETE SURROUND DETAILS DIMENSIONS
Minimum Flue Height Flue Height 2400 Measured From Top of Adaptor B + F + 2400
ACC CONCRETE HEARTH DIMENSIONS
Check List Firebox Ash Pan Rack/Hotplate & Grill Weather Shield Badge Adaptor & Bolts Davit Rods Packed by
Note: Firebox is recessed 40mm into ACC Surround.
Timber Framing requires 30mm clearances with ACC Surround .
Description
SN 1500 SN 1800 SN 2000 SN 1250
Firebox Width A 1500 1800 2000 1250 Firebox Height B 910 910 910 910 Firebox Depth C 600 600 600 600 Flange Width D 1550 1850 2050 1300 Flange Height E 935 935 935 935 Adaptor Height F 480 480 538 480 Pizza Oven Width AA 470 470 470 470 Pizza Oven Height BB 129 129 129 129 Pizza Oven Depth CC 311 311 311 311
Description
SN 1500 SN 1800 SN 2000 SN 1250
Surround Width G 1710 2010 2210 1460 Surround Height H 1640 1640 1690 1640 Surround Depth I 770 770 770 770 Window Width J 1560 1860 2060 1310 Window Height K 940 940 940 940 * To Centre of Flue N 450 450 450 450 Between Flue Centre O 760 760 842 600 Flue Diameter X 2 P 300 300 350 250 Liner Diameter X 2 Q 400 400 450 350 * Flue Centre Z 400 400 382 400
Description
SN 1500 SN 1800 SN 2000 SN 1250
Hearth Width L 1900 2200 2400 1650 Hearth Projection M 850 850 850 850
Note :
* “Z” dimension is from Flue Centre to Firebox Front Flange Not
including 40mm rebate from ACC Enclosure .
* “N” dimension is from Flue Centre to the ACC Enclosure front
16 December 2014
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior no tification.
All Dimension are in mm……. Copyright on all products and Specifications ©
4
PLAN, FRONT ELEVATION & CROSS SECTION
This is a general installation guide only – Contact a “NZHHA Installer” for Installation Advice. See : www.homeheat.co.nz , choose “members” & pick your Area & Fire type (wood / Gas etc) this will provide you with a
NZHHA Certified Installer (use the SFAIT Installers Only .)
HEARTH & PLINTH CONSTRUCTION DETAILS
1. All the dimensions are minimums
2. Fit the Plinth into position in the Cavity. If onto a wooden floor ensure that an insulating plinth is fitted as per the specifications. Ensure that the plinth is elevated to allow for finishing on the hearth. (See Hearth
and plinth details)
3. Fit the firebox into the Cavity. Bolt the fire box to the plinth or through to the floor with the bolting point provided on the Left and Right hand sides of the fire box (seismic restraints).
4. Fit the Adaptor to the Fire box. Ensure that exhaust sealant is used between the fire and Adaptor. Bolt into position with the bolt in the Left and right hand sides of the Fire box.
5. Install the flue system.
6. Fit the Hebel Heat cell around the fire. A general minimum lay out is shown in this Specification.
FIREBOX INSTALLATION
Note: Hearth and Plinth Construction.
For Combustible Flooring an Insulating Hearth and Plinth of 75mm ACC is required.
Plinth to be Offset above Hearth by the Hearth Finishing’s
( e.g. Tiles / Granite / Solid Plaster / etc )
All Load Bearing Canter Levered Hearths must be Engineered to carry loads .
IMPORTANT NOTE :
Offset
Offset for Hearth finishing
*Note: If Solid Plastering the structure , it is recommended to use a Fibreglass Mesh with a Latex Based Solid Plaster to minimise the chance of the Solid Plaster cracking. (See your Solid Plasterer for correct materials and applications) .
This is an example of a Raised & Canter Levered Hearth. See Spec for details
This Hearth & Plinth setup is at Floor Level
16 December 2014
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior no tification.
All Dimension are in mm……. Copyright on all products and Specifications ©
5
Firebox
SN
1500 DF
SN
1800 DF
SN
2000 DF
SN
1250 DF
Frameout Clearance Width O 1770 2070 2270 1490 Frameout Clearance Depth P
800 800 800 800 Frameout Clearance Height Q 2230 2230 2230 2230 Hearth Width R 1900 2200 2400 1650 Hearth Projection S 850 850 850 850 Window Height V 1745 1745 1745 1745 Window Width W 1770 2070 2270 1490 Chimney Chase Clearance X 1260 1260 1395 1150 Chimney Chase Clearance Y 500 500 550 450
TIMBER FRAMING & TRIM OUT DETAILS
Important Notes :
All Framing Dimensions are Internal Only .
All Timber Framing & Cladding must be constructed to suit an Outdoor Environment as per NZ Building Code .
Firebox is recessed 40mm into ACC Surround. Timber Framing requires 30mm clearances with ACC Surround .
Cool Air & “Caitec Air” external Intake
Vent
Warm Air Vent
*Note: If Solid Plastering the structure , it is recommended to use a Fibreglass Mesh with a Latex Based Solid Plaster to minimise the chance of the Solid Plaster cracking. (See your Solid Plasterer for correct materials and applications) .
Window
Height ‘V’
must be measured from top of Hearth .
Hearth Height
MINIMUM HEAT CELL ALCOVE CLEARANCES & FRAME OUT
Note:
Centre Line of Flue is `NOT’ in
Centre of the Chimney Chase
A Non Combustible Material must be used on front face of Structure . Eg : Promina Board , Superlux , ACC , etc
See Page 11 for S/S Flashing Detail & correct Spigot Heights
Loading...
+ 10 hidden pages