Waring ES1500 PRO Quick Start Manual

QUICK START GUIDE
ESPRESSO MAKER
ES1500
PARTS
V
C
F
G
A
H
B
Q
M
I
R
O
S
L
A. Main housing B. On/Off switch C. Control lever D. Steam/water dispensing lever E. Steam/water wand F. On Indicator lamp G. Boiler temperature control lamp H. Steam function indicator lamp I. Boiler temperature thermometer (˚C and ˚F) J. Espresso spout (single or double) K. Water tank L. Ground espresso holder M. Pod holder N. Grille O. Drip tray P. Filter (not shown) Q. Ta m p e r R. Cup warmer S. Crema enhancer T. Power cord (not shown) U. Coupling seat V. Scoop
J
GETTING STARTED
D
K
E
U
N
1. Unpack the Vero Barista™ Espresso Maker: DO NOT leave plastic packaging materials around children.
2. Wash water tank (K) with warm soapy water, rinse and dry. Fill water tank with clean water to the MAX ll line, then secure it rmly into position.
3. Be sure that the control lever (C) and steam/ water dispensing lever (D) are in the vertical standby position, and then switch the ma­chine to the On position using the On/Off switch (B). Espresso maker takes approxi­mately 5 minutes to heat up.
4. Making 1 espresso cup – Attach the single espresso spout to the holder (J).
Making 2 espresso cups – Attach the
double espresso spout to the holder (J ).
5. If using ground espresso – use the scoop (V) to measure the grounds to ll the ground espresso holder (L) and use the tamper (Q) to lightly press espresso grounds down. Secure the holder to the front of the machine. Note: 2 scoops (14 grams) max.
If using an espresso pod – place pod inside
the pod holder (M) and secure the holder to the front of the machine.
6. Place one or two cups under the holder, and activate the coffee function by pulling the control lever (C) forward toward the coffee cup symbol.
7. When the espresso has been dispensed to the desired level, push the control lever (C) back to the vertical standby position.
Making Cappuccino or Latte
If you wish to make cappuccino or latte,
push the control lever (C) back to activate
QUICK START GUIDE
the steam function. The steam function indicator lamp (H) and boiler temperature control lamp (G) will turn on. When the boiler temperature control lamp turns off again, the machine is at the right temperature to make steam.
Put the steam/water wand (E) into a frothing
pitcher lled with milk and pull the steam/ water dispensing lever (D) forward. Milk will begin to froth. CAUTION: DO NOT direct the steam/water wand toward any parts of the body.
Hot Water Function
Be sure that the Control lever (C) is in the
vertical standby position and that the machine has been heated for at least 5 minutes. Place container underneath the steam/water wand (E) and pull the steam/water dispenser (D) forward. To stop the ow of hot water, push the dispenser back to the vertical standby position.
(CONTINUED)
Do not throw away these instructions. READ BEFORE OPERATING your new
TM
Waring Pro
Espresso Maker. Keep for further reference.
These helpful hints are intended to be a supplement to the Instruction Booklet. In order to ensure safe operation and optimum performance, please read the entire Instruction Booklet.
IMPORTANT!
©2012 Waring Consumer Products 12WR131331 PG-29864
Loading...