Wa kates PVC User Manual

INSTALLATION & SERVICE INSTRUCTION MANUAL
FOR KATES PVC FLOW RATE CONTROLLERS.
IMPORTANT
1. THE KATES FLOW RATE CONTROLLER IS DESIGNED TO ACCURATELY REGULATE FLOW RATES AND IS PRECISION BUILT WITH EXACTING TOLERANCES AND FINISHES. TO INSURE SATISFACTORY PERFORMANCE, THE REGULATED FLUID MUST BE CLEAN AND FREE OF DIRT OR SOLIDS. THE INSTALLATION OF A 200 MESH STRAINER OR 75 MICRON FILTER IS RECOMMENDED, JUST UPSTREAM FROM THE CONTROLLER.
2. EQUALLY IMPORTANT: WHEN DIS-ASS EMBLING, SERVICING , OR CLEANING THE CONTROLLER, THE INTERNAL PARTS MUST BE HANDLED WITH CARE TO PREVE NT DAMAGING THE SURFACE FINISH IN ANY WAY.
3. OPERATION OF A KATES FLOW RATE CONTROLLER SUPPLIED BY A POSITIVE DISPLACEMENT PUMP, WILL BE SATISFACTORY ONLY IF A PRESSURE-RELIEVING VALVE IS CONNECTED BETWEEN THE PUMP AND THE CONTROLLER TO BYPASS EXCESS FLUID BACK TO THE FLUID SOURCE, OR TO THE INTAKE OF THE PUMP.
INSTALLATION
1. The Kates Flow Rate Controller is shipped fully assembled, ready for operation, with all parts in place. It is completely self-contained,
requires no outside source of power, no straight piping runs, and is as simple to install as an ordinary angle valve.
2. Upstream and downstream shutoff valves and a bypass valve should be installed so that the controller may be opened for inspection and
cleaning without requiring complete system shutdown. (See fig. 2)
3. Before installing the controller, be sure to flush out the piping system to remove any foreign material such as dirt, scale, chips, etc.
4. All controllers are constructed substantially, but pipe supports should be located so that the controller is not subject to mechanical load
due to piping, or to the expansion or contraction of piping.
5. The controller should be installed at a point in the pipe where it will be completely filled with liquid under all conditions of operation.
The preferred axis of the controller is vertical, with the bonnet up. INLET IS AT SIDE and outlet connection is at bottom. On threaded connections, apply pipe thread compound sparingly to male threads only, so that surplus will not get inside the controller.
START UP PROCEDURE
Note: If the flow rate setting knob does not turn, loosen the dial lock screw. (See fig. 1)
1. The pointer on the stainless steel nameplate should be at front, readily visible to operator. If not, proceed as follows: a) Loosen and remove the V-Clamp. b) Lift the bonnet straight up and turn until the pointer faces front. c) Make sure the bonnet O-ring is in good condition and is in place. d) Lower the bonnet slowly, at the same time turning the flow rate setting knob until the key on the end of the adjuster shaft fits
into the slots in the orifice sleeve, and the shoulder on the lower face of the bonnet fits into the body. When properly assembled, bonnet will seat squarely on the body all the way around. (See fig. 1)
e) Replace and tighten the V-Clamp.
2. By hand, turn the flow rate setting knob in both directions until the stop pin inside the controller prevents further rotation. If it does not turn easily without sticking, or if it does not hit the stop pin in both directions, follow directions below “To Clean Controller”. CAUTION: Never use a wrench or attempt to force the knob to turn.
3. Turn the flow rate setting knob clockwise until it hits the internal stop pin. The lowest set point at right hand end of dial should now line up with the pointer. If not, loosen the dial clamp screws on the top of the knob, turn the dial until the lowest set point on the dial lines up with pointer and retighten the screws.
4. Turn the flow rate setting knob until the desired flow rate mark on the dial lines up with the pointer on the nameplate.
5. Place controller in servi ce by opening upstream and do wnstream shutoff valves and closing the bypass valve around the controller. Controller will now regulate the flow rate at the set value. (See fig. 2) NOTE: Avoid slamming the controller with pressure.
6. If there is air trapped in the top of the controller, this should be purged by the liquid after a short period.
7. When the flowing fluid temperature is above room temperature, especially with viscous flu ids, there may be a “warming up” p eri od until the controller reaches the same temperature as the fluid. During this warming up period, the controller may be somewhat sluggish in action. If desired, this warming up period may be eliminated by the use of a heating coil or jacket.
8. During the first few days of operation, gasketed joints should be observed and tightened if necessary.
BLT 307 - 02
SERVICE INSTRUCTIONS
The Kates Flow Rate Controller has only one moving element, and is designed so that there are no complex linkages, delicate bearings, or any failure-prone components. Therefore, occasional cleaning may be the only servicing the controller will require.
CAUTION: MAKE SURE THAT THE CONTROLLER IS RELIEVED OF PRESSURE BEFORE ATTEMPTING TO SERVICE OR
CLEAN.
TO CLEAN CONTROLLER
CAUTION: in all cleaning operations, be very careful not to scratch, nick or mark any surfaces or edges.
1. The controller operates by downward flowing liquid and is self cleaning for most liquids. Downflow design also will allow drainage on
shutdown of many systems if discharge shutoff valve is closed after inlet shutoff valve.
2. It is not necessary to remove the controller from the line to clean. If installation includes proper shutoff and bypass valves, operate these
and take controller off stream or control. (See fig. 2)
3. Arrange a clean area where internal p art s can be placed and kept free of dirt.
4. Remove the V-Clamp, lift bonnet assembly straight up, remove bonnet O-ring, and place both in the clean area.
5. Lift out the orifice sleeve and place in the clean area.
6. Slowly lift out the impeller, valve sleeve assembly, and sprin g, and place in the clean area.
7. Remove the orifice cylinder mach ine screws and lift out the orifice cylinder and place in the clean area.
NOTE: Normally it is not necessary to remove the valve tube to clean it sufficiently. If it must be removed, follow instructions below “TO REMOVE VALVE TUBE”.
8. Thoroughly clean all part s th at have been removed from the con troller by immersing them in a suitabl e solvent. Clean and flush inside
of flow controller body and the valve tube with the solvent, and drain. All surfaces, especially the metering orifice, the valve tube and integral valve ports, must be COMPLETELY CLEAN. Any dirt, sediment, coating or gummy residue must be completely removed. Wipe all parts and surfaces dry with a clean, lint-free cloth.
9. Replace orifice cylinder, and tighten machine screws; replace the spring, impeller, and valve sleeve assembly on the valve sleeve. Make
sure that the valve sleeve will slide freely on the valve tube with no sticking.
10. Replace orifice sleeve, and make su re t hat orifice sleeve turns freely in both directions until it hi t s the verti cal stop pin.
11. Replace bonnet O-ring, then lower the bonnet slowly, at the same time turning the flow rate setting knob until the key on the end of the
adjuster shaft fits into the slots in the orifice sleeve, and th e shoulder on the lower face of the bonnet fits into the body. When properly assembled, bonnet will seat squarely on the body all the way around. (See fig. 1) See that the pointer is in front where set point can be read. Replace and tighten the V-Cla mp.
12. Place controller in service as specified under steps 2-7, “START UP PROCEDURE”.
TO REMOVE VALVE TUBE
1. If the valve tube must be removed, for cleaning or replacement, first remove all ot her internal parts of the controller. (Steps 1-7 above)
2. Remove the valve tube machine screws, lift out the valve tube, and clean with solvent.
3. Before replacing the valve tube, be sure that it is CLEAN. Also be sure that the co unterbore at the bottom of the body is CLEAN, as it
forms a seat for the valve tube.
4. Install valve tube, repl ace val ve t ube machine screws, and tight en them securely.
5. Reassemble controller accordi ng to steps 9-12 above.
TO REPLACE ADJUSTER SHAFT PACKING:
1. The only packing required is between the adjuster shaft and the bonnet. This consists of a PTFE thrust washer and an O-ring of standard
size and of a material that is suitable for use with the liquid flowing through the controller.
2. To replace the thrust washer and O-ring, remove the bonnet, and then remove flow rate setting knob by removing knob clamp screw and
lifting dial and knob assembly upwards. Adjuster shaft can now be removed by pulling it through the bonnet from the inside.
3. Remove the existing O-ring by prying it out of the groove in the shaft, using a blunt-ended hook. (With a PTFE O-ring, first immerse
the adjuster shaft in warm water to slightly soften the O-ring). CAUTION: Be careful not to scratch the groove or the shaft.
4. Remove the existing thrust washer, and replace with a new thrust washer. Run the washer down the shaft until it rests on the shoulder.
5. Slide a new O-ring down the adjuster shaft until it fits properly in the groove. (With a PTFE O-ring, first immerse it in warm water to
soften it slightly.)
6. Carefully push the adjuster shaft through the bonnet from the inside until the thrust washer is held tightly between the shoulder on the
shaft and the shoulder on the bonnet. Observe that th ere are flat s at the top of the shaft and th e bottom of the hole in the knob. Place knob on shaft with both sets of flats aligned so the shaft will key into the knob. Support shaft from below, then press or tap knob down on shaft. If flats on shaft d o not fit into those in knob, turn knob slightly, then t ap or press it down into place. Rep lace knob clamp screw to hold knob in place.
7. Replace the bonnet, and put the controller in service by foll owing Steps 2-7 listed und er th e heading “START UP PROCEDURE”.
BLT 307 - 02