Installation instructions
Ceiling hood
Operating mode: extracted air
Range hood DSDSR12
The appliance should be installed by qualified personnel only.
Each step must be carried out and checked in full in the order specified.
Validity
These installation instructions apply to:
64003 (DSDSR12, construction width 120 cm)
General notes
If other firing systems are being used at the same time (e.g. wood, gas, oil or coal fired heating appliances),
safe operation is only possible providing a room negative pressure of 4 Pa (0.04 mbar) is not exceeded at
the location of the appliance.
Risk of toxic fumes! An adequate flow of fresh air must be guaranteed e.g. via non-closable openings in
doors or windows and in combination with an air-intake/exhaust-air wall box or by other technical means.
If the appliance is installed over hobs, each cooking zone must be fitted with an ignition fuse and the minimum distances (see section «Dimensions») must be adhered to.
J64003113-R03
28/01/2016
Efficient repairs can only be guaranteed if it is possible to uninstall the complete appliance at any time without
causing any damage.
Identification plate
▸ Remove the grease filters. The identification plate is located on the inside of the appliance.
Installation accessories supplied
All fixing elements are contained in the scope of delivery.
Extraction mode
The extracted air must not be fed into a chimney which is used for exhausting fumes from appliances burning gas or other fuels.
Observe the local fire regulations.
Electrical connections
Electrical connections must be carried out by qualified personnel in accordance with the guidelines and
standards for low-voltage installations and the specifications of the local electricity supply companies.
A plug-in appliance may only be connected to a socket outlet with earthing contact, installed according to specifications. An all-pole mains isolating device with 3 mm contact opening should be provided in the house wiring system. Switches, plug and socket devices, circuit breakers and fusible cut-outs which are accessible after
installation and which have all-poles switching are permissible as isolating devices. Effective earthing and separately installed neutral and earth conductors ensure safe and fault-free operation. After installation, live parts
and cables with basic insulation must not be accessible. Check old installations.
▸ The appliance is designed for use up to a max. altitude of 2000 m above sea level.
▸ Refer to the identification plate for information on the required mains voltage, current type and fuse protection.
The mains plug must not be cut off.
1
Installation instructions
Ø 150
1200
1170
318
670
700
210
A
133
A
X
Ceiling hood
Operating mode: extracted air
Range hood DSDSR12
Dimensions
Distance above hob
Minimum distance X above hob: min. 800 mm
Maximum recommended distance: 1300 mm
Installation
Installation with built-in motor
J64003113-R03
28/01/2016
Cut-out measurements
1.
Use the screws S1 to secure the lateral supports A far
enough up that they do not yet lock into place.
2. Create a ceiling cover cut-out that is aligned with the
centre of the hob.
3. Reinforce the two long sides of the ceiling cover with
square timber B. The total combined height of the wood
and the ceiling cover must measure between 60mm
and 75mm.
The motor housing D can be rotated on all four sides.
4. Position the ceiling hood as close as possible to the
ceiling. Connect the mains connection and the exhaust
air pipe.
5. Push the ceiling hood into the cut-out until the lateral
supports A lock into place.
6.
Screw the four screws S1 into the hood until the ceiling
hood comes into contact with the ceiling.
7. Carry out function test.
2