Vulcan-Hart VHU18 Installation & Operation Manual

INSTALLATION &
VHU18 INSULATED HUMIDIFIED HOLDING & PROOFING CABINET
VULCAN 3600 NORTH POINT BLVD. DIVISION OF ITW FOOD EQUIPMENT GROUP, LLC BALTIMORE, MD 21222 800-814-2028
www.vulcanequipment.com
Vulcan ©2016 All Rights Reserved
F-47668 (02-18)
VHU18 INSULATED HUMIDIFIED HOLDING & PROOFING CABINET F-47668 (02-18)
IMPORTANT FOR YOUR SAFETY
THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL ELECTRICAL EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START­UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER
FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY
OF THIS OR ANY OTHER APPLIANCE.
Improper installation, adjustment,
alteration, service, or maintenance can
cause property damage, injury, or death.
Read the installation, operating and
maintenance instructions thoroughly
before installing or servicing equipment.
IN THE EVENT OF A POWER FAILURE,
DO NOT ATTEMPT TO OPERATE THIS DEVICE
1
VHU18 INSULATED HUMIDIFIED HOLDING & PROOFING CABINET F-47668 (02-18)
IMPORTANT FOR YOUR SAFETY
INTRODUCTION
INSTALLATION
ELECTRICAL REQUIREMENTS
OPERATION INSTRUCTIONS
CLEANING
REFERENCE AND
TROUBLESHOOTING
SERVICE & PARTS I
NFORMATION
TABLE OF CONTENTS
1 3 3 5 6 8 9
10
2
VHU18 INSULATED HUMIDIFIED HOLDING & PROOFING CABINET F-47668 (02-18)
Qty Part
Name
Description
at desired levels
opening
above
heating element
unit for wat
er collection
INTRODUCTION
The VHU18 Insulated Humidified Holding and Proofing Cabinet provides an efficient means of holding bulk prepared foods at proper serving temperatures while maintaining food quality. Advanced sensing technology maintains an ideal combination of temperature and humidity, without complicated controls.
Vulcan Heated Holding Cabinets are produced with quality workmanship and material. Proper installation, usage, and maintenance of your cabinet will result in many years of satisfactory performance. It is suggested that you thoroughly read this entire manual and carefully follow all provided instructions.
INSTALLATION
Before installing, verify that the electrical service agrees with the specifications on the Serial Data plate (Fig. 3) located on the back or side of cabinet. If the supply and equipment requirements do not agree, do not proceed with unpacking and installation. Contact your Vulcan-Hart Customer Service Department immediately.
UNPACKING: The Cabinet was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage to the cabinet.
If the cabinet is found to be damaged, take photos of the damage (including box), save the packaging material, and contact the carrier within 5 days of delivery.
Carefully unpack and place in a work accessible area near the installation location.
1. Open door and carefully remove packaging materials and components for this unit.
2. Peel off any vinyl protection film that may be present on sheet steel.
3. Ensure all component parts for this unit are accounted for:
20 Universal Tray Slides Wire racking to be placed in cabinet uprights
1 VHU Interior Pan Special Stainless Steel Pan with High temp
black coating on bottom; gets placed in
1 VHU Exterior Pan Standard Stainless Steel Pan located under
4. Remove universal tray slides from box. Install tray slides in the uprights at desired levels. Make sure the hook on the end of the tray slide is up (Fig. 1). To prevent tilting, tray slides should be placed in matching positions on both sides. For this unit, the bottom 2 holes (levels) closest to Interior pan are not intended for use.
3
Loading...
+ 7 hidden pages