vo-water duomatik evoline Installation Manual

INSTALLATION GUIDE
soft duomatik
evoline
Before introduction of the softener the installation guide has to be read carefully.
evo-water oHG
Falkenstraße 2 72589 Westerheim
Tel.: +49 7333/925710
Fax : +49 7333/9257120
www.evo-water.com
info@evo-water.com
Safety instructions:
1. Before installation the softener: Please refer to the corresponding installation – and operation instructions in this manual.
2. Please refer to the local installation regulations and the general directives, in particular DIN 1988 and EN1717, also the valid accident prevention regulations.
3. With not designated use and improper service the manufacturer is released from any liability.
4. Before the installation please check the statics of the walls, covers and grounds for loading capacity. According to place of action a backflow must be installed corresponding to local regulation before the arrangement. For the protection of the central tax valves from rust, sand etc. a suitable mudflap or fine filter should be inserted before the arrangement. The filter pad of the fine filters should be exchanged according to DINAR / DVGW at a distance of 6 months or after soiling. Please ensure that no water damages are caused (e.g., by ground expiry). The manufacturer is not liable for water damages. The food water of the arrangement must correspond to the information of the German drinking water order. The room temperature must be at least 7°C and may not cross 50°C.
5. Changes in the system may not be made without consultation and approval with evo-water oHG, for damages no other guarantee is taken over.
6. The system serves exclusively for the removing of undesirable mineral substances which retreat as a scale. It serves as a pure system protection.
1. Parts:
1.
BYPASS
8.
BLENDING REGULATOR
2.
VALVE HOUSING
9.
HARDNESS REGULATOR
3.
RESIN TANK
10.
TO BRINE VALVE
4.
CONTAINER FOR DEVICE AND SALT
11.
CONNECTIONS (1/2",3/4”, 1")
5.
BRINE VALVE (float)
12.
TO DRAIN
6.
WATER INLET
13.
COMMUNICATION TUBES
7.
WATER OUTLET
14.
TUBES TO BRINE VALVE
2. Precautions:
Make sure you have all necessary tools on hand before you begin with the
installation.
Follow all local legal regulations. Read this manual carefully. If you have any questions or remarks, please
contact your evo-water supplier.
Check incoming pressure: minimum 1 bar (dynamic), maximum 8 bar (static)
(15 PSI – 116 PSI). If necessary reduce incoming pressure.
Do not install the evo-water softener close to a heating source (environment
temperature must be below 40°C).
Protect softener and drain (12) against frost. Make sure you have the latest installation manual at hand. Check with your
evo-water supplier.
3. Installation:
3.1 Close main valve and make sure pressure is released from piping. This can be
done by opening at least one tap.
3.2 Connect the two units by means of the provided Y-pieces. You can find them in
the salt compartment. The Y-piece with the filter inside, needs to be mounted at the inlet of the valve. (= bottom connection) The other must be mounted at the other connection.
First connect the Y-piece to one unit and afterwards to the other unit. Secure
them with the provided clips (4 pieces). You dont need to take the units out of the container to do this.
Loading...
+ 9 hidden pages