Vortech Cog Drive Upgrade for 2010-2011 Camaro User Manual

2010 CAMARO COG DRIVE UPGRADE
®
Installation Instructions
DP/N: 007123
2010 CAMARO SS (LS3 & L99)
P/N: 4GE118-010, 4GE118-020, 4GE118-030
1650 Pacific Avenue, Channel Islands, CA 93033-9901 • Phone 805 247-0226
Fax: 805 247-0669 • www.vortechsuperchargers.com • M-F 8:00 AM - 4:30 PM (PST)
02/11/10
FOREWORD
STOP
This manual provides information on the installation, maintenance and service of the Vortech supercharger kit expressly designed for this vehicle. All information, illustrations and specifications contained herein are based on the latest product information available at the time of this publication. Changes to the manual may be made at any time without notice. Contact Vortech Engineering for any additional information regarding this kit and any of these modifications at (805) 247-0226 8:00am-4:30pm PST.
Take note of the following before proceeding:
1. Proper installation of this supercharger kit requires general automo-
tive mechanic knowledge and experience. Please browse through each step of this instruction manual prior to beginning the installation to deter­mine if you should refer the job to a professional installer/technician. Please contact your dealer or Vortech Engineering for possible installers in your area.
2. This product was designed for use on stock (un-modified, OEM) vehicles. The PCM (computer), engine, transmission, drive axle ratios and tire O.D. must be stock. If the vehicle or engine has been modi-
fied in any way, check with Vortech prior to installation and use of this product.
3. Use only premium grade fuel with a minimum of 91 octane (R+M/2).
4. Always listen for any sign of detonatlion (knocking/pinging) and discontinue hard
use (no boost) until the problem is resolved.
5. Vortech is not responsible for any clutch, transmission, drive-line or engine dam­age.
Exclusions from Vortech warranty coverage considerations
include, but not limited to:
1. Neglect, abuse, lack of maintenance, abnormal operation or improper installation.
2. Continued operation with an impaired vehicle or sub-system.
3. The combined use of Vortech components with other modifications such as, but
not limited to, exhaust headers, aftermarket camshafts, nitrous oxide, third party PCM programming or other such changes.
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
©2010 VORTECH ENGINEERING, LLC
All rights reserved. No part of this publication may be reproduced, transmitted, transcribed, or translated into
another language in any form, by any means without written permission of Vortech Engineering, LLC.
iiii
TABLE OF CONTENTS
FORWORD ................................................................ii
TABLE OF CONTENTS ................................................... iii
TOOL & SUPPLY REQUIREMENTS ........................................ iv
PARTS LIST 75T/30T (4GE118-010) ........................................v
PARTS LIST 75T/32T (4GE118-020) ....................................... vi
PARTS LIST 75T/34T (4GE118-030) .......................................vii
1. PREPARATION AND REMOVAL ...........................................1
2. HARDWARE INSTALLATION ..............................................5
3. BELT INSTALLATION AND TENSIONING ....................................8
4. FINAL ASSEMBLY ......................................................9
5. FINAL CHECK.........................................................10
© 2010 Vortech Engineering, LLC
iiiiii
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
VORTECH 50MM COG DRIVE UPGRADE
Installation Instructions
2010 CHEVROLET CAMARO SS
Before beginning this installation,
please read through this entire instruction booklet
The Vortech 2010 Camaro 50mm cog drive upgrade was designed specifically for use on 2010 Chevrolet Camaro SS vehicles equipped with a supercharger to support appli­cations with increased horsepower over the basic kit. As with any power enhancing product, this unit is intended for use on healthy, well-maintained engines. Vortech Engineering is not responsible for engine damage. Installation on new vehicles will not harm or adversely affect the break-in period so long as factory break-in procedures are followed.
For best performance and continued durability, please take a note of the following key points:
1. Use only premium grade fuel 91 octane or higher (R+M/2).
2. Always listen for any sign of detonation (pinging) and discontinue hard use (no boost) until problem is resolved.
**IMPORTANT NOTE**
This supercharger drive system is designed for use ONLY on vehicles equipped with
“heavy-duty” Vortech supercharger units (designated with RACE on the supercharger serial tag). Also, when employing a cog drive system, a Vortech race bypass valve must be used; this is crucial to maintain proper supercharger performance and longev­ity. Make sure that the proper supercharger pulley ratios are selected for your particu­lar application and supercharger type. Call Vortech with any questions regarding max­imum recommended supercharger speeds.
TOOL & SUPPLY REQUIREMENTS:
Open End Wrenches (3/4”)
3/8” Ratchet
1/2" Breaker Bar or Ratchet
5/16", 3/8", 9/16, 17mm, and 3/4” Sockets
Flat #2 Screwdriver
Hammer
Allen Wrench, Standard Set
Utility Knife
Heat Gun/Propane Torch
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
iviv
2010 CAMARO COG DRIVE UPGRADE
50MM COG, 75T CRANK / 30T S/C PULLEY
Part No. 4GE118-010
PARTS LIST
IMPORTANT: Before beginning installation, verify that all parts are included in the kit.
Report any shortages or damaged parts immediately.
PART NO. DESCRIPTION QTY
4GE118-010 DRIVE ASSY, 75T/30T COG 50MM UPGRADE
7B500-325 ARBOR, S/C TENS PLY 1 7PA375-500 SCREW, IDLER ADJUST, 5.00" 1 4PFA010-031 BRACKT, IDLER ADJUST SCREW 1 7F500-020 1/2"-20 HEX JAM NUT GR5 ZINC 1 7A250-100 1/4-20 X 1 FLAT ALLEN 2 4FP116-020 IDLER W/BRNG ASSY, 50MM 1 2A032-030 S/C PULLEY, 30T (50MM) 1 4MA018-075 CRANK PLY, 75T GT 8MM X 2.5W 1 7C010-057 M10 X 1.5 X 55MM HX HD CL10.9 2 4FD017-011 PILOT, 6203/5 BRG, 1/2 SCREW 1 4GE017-031 IDLER SPACER, 50MM COG, 2010 C 1 2A042-161 BELT, POWERGRIP GT2 1600 X 8M 1 007123 INSTR, 2010 CAMARO 50MM COG UP 1 7K437-001 7/16" AN WASHER 2 7U100-071 KEY, 3/16 SQUARE X 1-1/8 LONG 1 2A040-011 PULLEY RETAINER 1 7B375-200 3/8-24 X 2" GR8 BOLT 1 7K375-040 3/8 AN960 FLAT WASHER PLT 1
© 2010 Vortech Engineering, LLC
v
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
2010 CAMARO COG DRIVE UPGRADE
50MM COG, 75T CRANK / 32T S/C PULLEY
Part No. 4GE118-020
PARTS LIST
IMPORTANT: Before beginning installation, verify that all parts are included in the kit.
Report any shortages or damaged parts immediately.
PART NO. DESCRIPTION QTY
4GE118-020 DRIVE ASSY, 75T/32T COG 50MM UPGRADE
7B500-325 ARBOR, S/C TENS PLY 1 7PA375-500 SCREW, IDLER ADJUST, 5.00" 1 4PFA010-031 BRACKT, IDLER ADJUST SCREW 1 7F500-020 1/2"-20 HEX JAM NUT GR5 ZINC 1 7A250-100 1/4-20 X 1 FLAT ALLEN 2 4FP116-020 IDLER W/BRNG ASSY, 50MM 1 2A032-032 S/C PULLEY, 32T (50MM) 1 4MA018-075 CRANK PLY, 75T GT 8MM X 2.5W 1 7C010-057 M10 X 1.5 X 55MM HX HD CL10.9 2 4FD017-011 PILOT, 6203/5 BRG, 1/2 SCREW 1 4GE017-031 IDLER SPACER, 50MM COG, 2010 C 1 2A042-161 BELT, POWERGRIP GT2 1600 X 8M 1 007123 INSTR, 2010 CAMARO 50MM COG UP 1 7K437-001 7/16" AN WASHER 2 7U100-071 KEY, 3/16 SQUARE X 1-1/8 LONG 1 2A040-011 PULLEY RETAINER 1 7B375-200 3/8-24 X 2" GR8 BOLT 1 7K375-040 3/8 AN960 FLAT WASHER PLT 1
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
vi
2010 CAMARO COG DRIVE UPGRADE
50MM COG, 75T CRANK / 34T S/C PULLEY
Part No. 4GE118-030
PARTS LIST
IMPORTANT: Before beginning installation, verify that all parts are included in the kit.
Report any shortages or damaged parts immediately.
PART NO. DESCRIPTION QTY
4GE118-030 DRIVE ASSY, 75T/34T COG 50MM UPGRADE
7B500-325 ARBOR, S/C TENS PLY 1 7PA375-500 SCREW, IDLER ADJUST, 5.00" 1 4PFA010-031 BRACKT, IDLER ADJUST SCREW 1 7F500-020 1/2"-20 HEX JAM NUT GR5 ZINC 1 7A250-100 1/4-20 X 1 FLAT ALLEN 2 4FP116-020 IDLER W/BRNG ASSY, 50MM 1 2A032-034 S/C PULLEY, 34T (50MM) 1 4MA018-075 CRANK PLY, 75T GT 8MM X 2.5W 1 7C010-057 M10 X 1.5 X 55MM HX HD CL10.9 2 4FD017-011 PILOT, 6203/5 BRG, 1/2 SCREW 1 4GE017-031 IDLER SPACER, 50MM COG, 2010 C 1 2A042-161 BELT, POWERGRIP GT2 1600 X 8M 1 007123 INSTR, 2010 CAMARO 50MM COG UP 1 7K437-001 7/16" AN WASHER 2 7U100-071 KEY, 3/16 SQUARE X 1-1/8 LONG 1 2A040-011 PULLEY RETAINER 1 7B375-200 3/8-24 X 2" GR8 BOLT 1 7K375-040 3/8 AN960 FLAT WASHER PLT 1
vii
© 2010 Vortech Engineering, LLC
DP/N: 007123v1.0
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
This page intentionally left blank
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
viii
1. PREPARATION AND REMOVAL
A. Unplug the connector from the MAF sensor.
B. Remove the discharge piping from the passenger
side intercooler up pipe to the throttle body.
C. Remove the existing serpentine supercharger belt
by loosening the spring tensioner with a ½” drive breaker bar or ratchet.
Fig. 1-a
Fig. 1-b
© 2010 Vortech Engineering, LLC
1
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
1. PREPARATION AND REMOVAL, CONT’D
D. Remove the spring tensioner from the front mount-
ing plate and replace with M10X1.5X55mm bolt and washer.
Fig. 1-c
Fig. 1-d
Fig. 1-e
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
2
1. PREPARATION AND REMOVAL, CONT’D
E. Remove the fixed idler from the front mounting
plate and replace with M10X1.5X55mm bolt and washer.
Fig. 1-f
Fig. 1-g
© 2010 Vortech Engineering, LLC
3
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
1. PREPARATION AND REMOVAL, CONT’D
F. Remove the six bolts holding the supercharger
drive pulley to the front of the crank damper.
G. Remove the drive pulley and set aside.
H. Remove the 3/8 bolt securing the 10-rib super-
charger pulley with a 9/16 socket
I. Remove the 10-rib supercharger pulley from the
input shaft and set aside. If necessary lightly heat the pulley with a propane torch until the pulley slides off.
Fig. 1-h
Fig. 1-i
Fig. 1-j
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
4
2. HARDWARE INSTALLATION
NOTE: Do NOT hammer, press, or pry etc. on either
of the pulleys when installing or removing them. Lightly heat the pulley with a propane torch until the pulley slides onto the input shaft/crank pulley spacer pilot.
A. Re-using the crank spacer and six previously
removed bolts with washers, install the newly sup­plied 75 tooth cog crank pulley using a drop of blue loctite thread locker on each fastener. Tighten all hardware evenly, using a progressive, criss-cross pattern. Torque to 35 ft/lbs.
B. Adjust any factory hoses or lines to ensure ade-
quate clearance around the new drive pulley for trouble free operation.
C. Install the supplied 50 mm cog supercharger pul-
ley onto the supercharger input shaft with the long hub facing the supercharger. Make sure to align and install the square key way. Secure pulley using the supplied retainer along with a drop of blue loctite on the 3/8-24x2" bolt and washer. See FIG 2-c
Fig. 2-a
Fig. 2-b
Fig. 2-c
© 2010 Vortech Engineering, LLC
5
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
2. HARDWARE INSTALLATION, CONT’D
D. Locate the following parts: 7B500-325 tensioner
arbor, 7PA375-500 adjustment screw, 4PFA010­031 adjustment screw bracket, two 7A250-100 ¼-20 flat allen screws.
E. Apply a liberal amount of anti seize to the threads
of the adjustment screw (7PA375-500)
F. Feed the shaft of the tensioner arbor through the
slot of the front plate from the back. See Figure 2-d.
G. Start to thread the adjustment screw into the head
of the tensioner arbor.
H. Install the adjustment screw mounting block onto
the head of the adjustment screw and secure with the supplied ¼-20 x 1” flat head screws through the front plate in the appropriate location
NOTE: Use the upper tensioner mounting holes with
a 1600 belt for kits with a 75 tooth crank and either 34 or 32 tooth supercharger pulley. Use the lower tensioner mounting holes with a 1600 belt for kits with a 75 tooth crank and 30 tooth supercharger pulley.
Fig. 2-d
Fig. 2-g
Fig. 2-e
Fig. 2-f
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
6
2. HARDWARE INSTALLATION, CONT’D
I. Slide the supplied idler spacer over the shaft of
the tensioner arbor.
J. Next install the supplied larger aluminum idler
onto the arbor followed by the piloting washer and ½”-20 hex nut. Install only finger tight while still allowing for movement with the adjustment screw.
Fig. 2-h
Fig. 2-i
Fig. 2-j
© 2010 Vortech Engineering, LLC
7
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
3. BELT INSTALLATION AND TENSIONING
A. Make sure the tensioner arbor is adjusted to the
highest position and install the supplied cog belt around the crank first and then the supercharger pulley.
B. With the belt routing underneath the tensioner
idler pulley, adjust the tensioner by turning the tensioner screw counter-clockwise so that idler pulley is lowered onto the belt applying tension.
C. Once adequate tension is applied, lock the ten-
sioner in place by finally tightening the jam nut on the tensioner arbor previously left loose for adjust­ment purposes.
Fig. 3-a
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
Fig. 3-b
8
4. FINAL ASSEMBLY
A. Reinstall the discharge piping from the passenger
side intercooler up pipe to the throttle body.
B. Re-connect the MAF sensor wiring harness.
Fig. 4-a
Fig. 4-b
© 2010 Vortech Engineering, LLC
9
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
DP/N: 007123v1.0
5. FINAL CHECK
WARNING: Do not attempt to operate the vehicle
until ALL components are installed and ALL operations are completed including the final check.
A. Confirm that all fasteners are properly secured
and tight.
B. Make sure all wires and hoses are routed away
from hot, moving or sharp objects.
C. Test drive the vehicle.
D. Custom calibration will be REQUIRED as the
drive speeds of the supercharger and the boost levels will have been changed from the standard 10-rib serpetine drive system. Always listen care­fully for engine detonation. Discontinue heavy throttle usage if detonation is heard.
DP/N: 007123v1.0 © 2010 Vortech Engineering, LLC All Rights Reserved, Intl. Copr. Secured. 11FEB2010 50MM COG UPGRADE
10
This page intentionally left blank
11
© 2010 Vortech Engineering, LLC
DP/N: 007123v1.0
All Rights Reserved, Intl. Copr. Secured.
11FEB2010 50MM COG UPGRADE
®
1650 Pacific Avenue, Channel Islands, CA 93033-9901 • Phone 805 247-0226
Fax: 805 247-0669 • www.vortechsuperchargers.com • M-F 8:00 AM - 4:30 PM (PST)
DP/N: 007123
02/11/10
Loading...