Proper installation of this supercharger kit requires general automotive mechanic
knowledge and experience. Please browse through each step of this instruction manual
prior
to beginning the installation to determine if you should refer the job to a professional
installer/technician. Please call Vortech Engineering for installers in your area.
All rights reserved. No parts of this publication may be reproduced, transmitted, transcribed,
or translated into another language in any form, by any means without written permission
This product is protected by state common law, copyright and/or patent. All legal
rights therein are reserved. The design, layout, dimensions, geometry, and
engineering features shown in this product are the exclusive property of Vortech
Engineering, LLC. This product may not be copied or duplicated in whole or part,
abstractly or fundamentally, intentionally or fortuitously, nor shall any design,
dimension, or other information be incorporated into any product or apparatus
without prior written consent of Vortech Engineering, LLC.
The MSD Boost Timing Master, manufactured by Autotronic
Controls Corporation, included in this kit is serviced exclusively
by the manufacturer. Autotronic Controls Corporation warrants
this product to be free from defects in material and workmanship
under normal use and if properly installed for a period of one
(1) year from the date of purchase. In case of malfunction, this
unit will be repaired free of charge according to the terms of
the warranty. If found to be defective as mentioned above, it
will be repaired or replaced if returned prepaid along with proof
of date of purchase. This shall constitute the sole remedy of
the purchaser and the sole liability of Autotronic Controls
Corporation and/or Vortech Engineering, LLC. To the extent
permitted by law, the foregoing is exclusive and in lieu of all
other warranties or representations whether expressed or
implied, including any implied warranty of merchantability or
fitness. In no event shall Autotronic Controls Corporation and/
or Vortech Engineering, LLC, be liable for labor charges, special
or consequential damages.
When returning this unit for service, proof of purchase must be
supplied for warranty verification. After the warranty period has
expired, repair service is charged between a minimum and
maximum charge. In either case, please send the unit prepaid with proof of purchase to the attention of:
Autotronic Controls Corporation
Customer Service Department
12120 Esther Lama
Suite #114
El Paso, Texas, 79936
Phone: (915) 855-7123
Fax: (915) 857-3344
www.msdignition.com
The repaired unit will be returned as soon as possible after
receipt, COD for any charges. Be sure you include a detailed
account of any problems experienced, the type of vehicle and
any modifications.
Should you have any technical or installation questions
regarding this unit, contact Vortech Engineering
directly at (805) 247-0226, M-F 8AM - 4:30PM (PST).
Congratulations on selecting the best performing and best backed automotive
supercharger available today... the VORTECH® V-2® Supercharger!
Before beginning this installation, please read through this entire instruction booklet and the Street
Supercharger System Owner's Manual which includes the Limited Warranty Program and the Warranty
Registration form and return envelope.
Vortech supercharger systems are performance improving devices. In most cases, increases in torque of 30-35%
and horsepower of 35-45% can be expected with the boost levels specified by Vortech Engineering. This product
is intended for use on healthy, well maintained engines. Installation on a worn-out or damaged engine is not
recommended and may result in failure of the engine as well as the supercharger. Vortech Engineering is not
responsible for engine damage.
Installation on new vehicles will not harm or adversely affect the break-in period so long as factory break-in
procedures are followed.
For best performance and continued durability, please take note of the following key points:
1. Use only premium grade fuel 92 octane or higher (R+M/2).
2. The engine must have stock compression ratio.
3. If the engine has been modified in any way, check with Vortech prior to using this product.
4. Always listen for any sign of detonation (pinging) and discontinue hard use (no boost) until problem is
resolved.
5. Perform an oil and filter change upon completion of this installation and prior to test driving your vehicle.
Thereafter, always use a high grade SF rated engine oil or a high quality synthetic, and change the oil and
filter at least every 3,000 miles. Never attempt to extend the oil change interval beyond 3,000 miles,
regardless of oil manufacturer's claims as potential damage to the supercharger may result.
6. Before beginning installation, replace all spark plugs that are older than 1 year or 10,000 miles with original
heat range plugs as specified by the manufacturer and reset timing to factory specifications (follow the
procedures indicated within the factory repair manual and/or as indicated on the factory underhood emissions
tag). Do not use platinum spark plugs unless they are original equipment. Change spark plugs every
15,000 miles and spark plug wires at least every 50,000 miles.
TOOL & SUPPLY REQUIREMENTS
• 3/8" socket and drive set
• Flat #2 screw driver
• Large screw driver or pry bar
• Adjustable wrench
• 3/8" open end wrench
• 7/16" open end wrench
• 1/2" open end wrench
• 9/16" open end wrench
• 9/16" drill bit
• 3/32" drill bit
• Drill motor
• 3/8" NPT tap and handle
• 1-1/16" six point socket and drive set
• Ford Snaplock fuel fitting disconnect tool
• Teflon sealing tape or paste
If your vehicle has in excess of 10,000 miles since its last spark plug change, then you will also need:
A. Remove rubber air ducts (2) between the throttle
body and plastic air resonator.
B. Remove the rubber molded air bypass tube
between the idle air bypass valve and the air
resonator and set aside.
C. Remove the plastic resonator.
2. ALTERNATOR AND HOIST BRACKET REMOVAL
A. Remove the stock alternator adjusting bracket,
alternator pivot bolt and alternator belt.
B. Remove all bolts holding the main alternator/
smog pump mounting bracket and move away
to gain clearance to the front of the cylinder head
and valve cover. Remove the engine hoisting
bracket.
C. Remount the main alternator/smog pump bracket
and accessories with the original hardware.
3. THERMOSTAT HOUSING REPLACEMENT
A. Drain approximately one gallon of coolant from
the radiator.
B. Remove the radiator hose from the thermostat
housing.
C. Remove the thermostat housing, clean the gas-
ket area and replace with the Vortech housing
and gasket.
D. Plug the 3/8" NPT holes with the supplied plugs.
4. OIL RETURN FITTING
A. Remove the passenger side valve cover.
NOTE: It is necessary to unfasten the brack-
B. Drill a 9/16" hole in the front of the valve cover.
Make sure that the hole is drilled in the flat area
on the end of the valve cover. (See
some later model trucks, the valve covers are
slightly different and may require different placement of the drain hole.
C. Tap the 9/16" hole using a 3/8" NPT pipe tap.
D. Install the supplied 90° elbow and hose fitting
into the valve cover. The fittings should run
almost horizontally pointing inward as shown in
Fig. 6-b
E. Thoroughly clean the valve cover and gasket of
any chips and reinstall the valve cover.
ets holding the air tubes running from
the smog pump over the valve cover
so that they may be pushed aside.
A. Install the supercharger mounting bracket to the
top two water pump bosses using the provided
bolts. Loosely fit the bolts at this time.
NOTE: See Fig. 5-a on page 3 for fastener
locations.
B. Install the alternator bracket to the bosses on
the supercharger bracket with the bolts provided. Place the 1.50" spacer between the
bracket and engine in the lowest hole and loosely
secure it.
C. Thread the adjuster bolt into the alternator and
pull the alternator all the way up in the adjusting
slot and secure it there temporarily by lightly
tightening the bolt. Now secure all of the bolts in
the supercharger and alternator brackets.
Loosen the alternator and let it rest in the fully
retracted position.
D. Install the mounting bracket brace between the
upper left-hand hole (driver’s side) on the supercharger mounting bracket and the front intake
manifold stud. Tighten bolts and nuts securely.
6.OIL FEED LINE
A. Using a 1-1/16" socket (6 point), remove the oil
pressure sender from the rear of the intake
manifold.
B. Thread the oil pressure sender into the end of
the provided brass TEE fitting. Thread the 1/4"
NPT nipple into the opposite end of the TEE.
Screw the 1/4" NPT x #4 flare fitting into the
remaining branch. (See
NOTE: It is necessary to remove the oil feed fitting
in order to place the supercharger into the
bracket.
A. Fasten the oil drain line (1/2" I.D.) to the oil drain
fitting on the supercharger and secure with the
#8 clamp.
NOTE: Position the clamp so the screw hous-
ing will not interfere with the mounting bracket.
B. Install the supercharger to the bracket, taking
care to route the drain hose towards the valve
cover fitting. Secure the supercharger using the
3/8" bolts and AN washers provided. (See
on next page.) Connect the drain line to the
5-a
Fig.
fitting on the valve cover. Make sure there are no
crimps in the oil drain line and that it is routed
steadily downward.
NOTE: The oil drain hose may require slight
trimming for proper fit.
C. Connect the oil feed line (1/4" oil hose) from the
newly installed brass TEE (below the oil pressure sender) to the oil spray fitting located on the
side of the supercharger. Route the line on top
of the intake manifold next to the (passenger’s
side) valve cover. Tighten fittings and lines
securely.
8. DRIVE BELT
A. Install the plastic idler pulley to the lower center
boss on the supercharger with the 12 mm bolt.
Be sure to place the thick washer/spacer between the pulley mount and supercharger. Secure the bolt.
B. Route the supercharger drive belt over the front
between the stock throttle body and the discharge side of the supercharger using the
sleeves and clamps provided.
B. Modify the stock air bypass hose per diagram.
Fig. 10-a
(See
C. Install the modified hose between the fitting on
the discharge tube and stock fitting below the
throttle body and secure with stock clamps.
D. Connect the intake plenum to the inlet on the
supercharger using the sleeve and clamp provided. (See
E. Connect the stock rubber air cleaner tubes to
the two openings on the intake plenum using
the stock clamps.
.)
Fig. 10-b
.)
CUT TO 5-1/4"
Fig. 10-a
IMPORTANT:If the kit is being fitted to a
1996 or 1997 model, follow
steps 1-5 below:
1. Remove the air filter cover/MAF assembly.
Drill a 7/8" hole into the rear portion of the
cover (the side facing the brakemaster cylinder). Reinstall the air filter cover/MAF
assembly onto the air box.
2) Install the supplied 5/8" grommet and barb
fitting into the hole previously drilled into the
air filter cover.
3) Route the supplied length of 5/8" hose from
the valve cover breather to the air filter
cover. Trim the hose length and secure with
#8 clamps.
A. The Ignition/Boost Control unit has been prewired
for installation convenience. Installation is a
simple matter of disconnecting the stock connector at the ignition coil and plugging in the new
adapter. Then plug the stock connector into the
adapter. (See
Fig. 12-a
B. The next step is to provide a good ground for the
black wire and mounting the box in as cool a
place as possible under the hood. The box
should be mounted with the aluminum cover on
the bottom.
C. Connect the vent to manifold pressure by splic-
ing into the FMU manifold pressure line with the
supplied 5/32" hose and TEE.
D. Route the Ignition/Boost Control wires through
the firewall from the interior side. Mount the
knob in an easily accessible place.
E. Connect the wires to the plastic oval wiring
connector on the Ignition/Boost Control unit
using the snap-on connector supplied in the
Ignition/Boost Control kit.
.)
NOTE: The wiring to the Boost/Control knob
can be matched to either of the corresponding wires in the boost retard
connector.