CKIT-2-B
Expansion K
IT
VOLT Lighting, LLC • 15486 N. Nebraska Ave. • Lutz, FL 33549
www.voltlighting.com • support@voltlighting.com
Installation Instructions
Assemble the hubs
by attaching the black
ground stakes.
Spotlight
1 Turn off the transformer (the green light will go off) and unplug the existing system from the power outlet.
2 Assemble the hub by attaching the black ground stake to the hub.
3 Locate the new hub in the center of where the xtures will be placed and within 25ft of an existing hub.
4 Position the xtures as desired and run the wire from each xture to the hub.
5 Use the wire included in this kit to connect the new hub with one of the existing hubs or connect the wire
directly to the transformer.
6 If desired the xture wires and the hub wires can be shortened.
7 When satised with the location of the xture and after the connections are made plug the transformer .
into the outlet and turn the transformer on.
8 Test the system by turning the timer to the on position, make sure the xtures work correctly.
9 Visit the installation after dark to make sure the xtures are located correctly and adjust as needed,
when satised return the timer to the preferred setting.
Hub
Wire
Need help? Call me!
7 DAYS A WEEK (866) 865-8872
M-F: 8 AM - 8 PM (EST) • S-S: 10 AM - 6 PM (EST)