Contents
Design principles and operating sequence Page
1.1 Principle components 2
1.2 Mode of operation 2
1.3 Safety devices 2
Technical data Page
2.1 Central heating 3
2.2 Gas pressure 3
2.3 Expansion vessel 3
2.4 Dimensions 3
2.5 Clearances 3
2.6 Connections 3
2.7 Electrical 3
2.8 Flue details 3
2.9 Emissions 3
2.10 Pump duty 4
General requirements Page
3A.1 Related documents 5
3A.2 Location of appliance 5
3A.3 Gas supply 5
3A.4 Flue system 5
3A.5 Air supply 5
3A.6 Water circulation 5
3A.6.1 Pipework 5
3A.6.2 Automatic by-pass 5
3A.6.3 Drain cocks 5
3A.6.4 Air release points 5
3A.6.5 Expans ion vessel 5
3A.6.6 Filling point 5
3A.6.7 Low pressure sealed system 6
3A.6.8 Frequent filling 6
3A.7 Electrical supply 6
3A.8 Mounting on a combustible surface 6
3A.9 Timber framed building 6
3A.10 Inhibitors 6
3A.11 Declaration of conformity 6
Installation Page
4.1 Delivery 7
4.1.2 RAIN application 7
4.1.3 RAIN bi application 7
4.2 Contents (appliance carton) 7
4.3.1 Unpacking 7
4.3.2 Preparation for mounting
the appliance (external application) 7
4.3.3 Important 7
4.4.1 External applications using the enclosure 7
4.4.2 External applications without the enclosure 8
4.5 Fitting the flue 8
4.5.1 Concentric horizontal flue 8
4.5.2 Concentric vertical flue 10
4.5.3 Vokera twin flue application 10
4.6 Connecting the gas and water 10
4.6.1 Gas 10
4.6.2 Flow and return 10
4.6.3 Safety valve 10
4.7 Electrical connections 10
4.8.1 Electrical connection 10
4.8.2 Connecting the mains (230V) input 10
4.7.1 Internal access 11
Commissioning Page
5.1 Gas supply installation 11
5.2 The heating system 11
5.3 Initial filling of the system 11
5.4 Initial flushing 11
5.5 Pre-operation checks 11
5.6 Initial lighting 11
5.7 Checking the burner pressure 11
5.8 Final flushing of the heating system 12
5.8.1 Inhibtors 12
5.9 Setting the boiler operating temperature 12
5.10 Setting the system design pressure 12
5.11 Regulating the central heating system 12
5.12 Final checks 12
5.13 Instructing the user 12
Servicing instructions Page
6.1 General 13
6.2 Routine annual servicing 13
6.3 Replacement of components 13
6.4 Component removal procedure 13
Checks, adjustments and fault finding page
7.1 Checking appliance operation 14
7.2 Appliance mode of operation 14
7.2.1 Selector switch in the OFF position 14
7.2.2 Selector switch in the ON position 14
7.2.3 Appliance functions 14
7.2.4 Heating mode 14
7.2.5 Heating parameters 15
7.3 Checking & adjusting burner pressure 15
7.3.1 Setting the maximum burner pressure 15
7.3.2 Setting the minimum burner pressure 15
7.4 Combustion analysis test 15
7.5 Checking the expansion vessel 16
7.6 External faults 16
7.6.1 Installation faults 16
7.7 Electrical checks 16
7.7.1 Earth continuity test 16
7.7.2 Short circuit check 16
7.7.3 Polarity check 16
7.7.4 Reversed polarity or supply fault 16
7.7.5 Resistance to earth check 17
7.8 Fault finding 17
7.8.1 Replacing the main PCB 17
7.9 Fault codes 17
Wiring diagrams Page
8.1 External wiring 18
8.2 Typical control applications 18
8.3 Room thermostat 18
8.4 Other controls 18
Functional diagram 19
Exploded diagrams Page
Table 1-5 21-24
L.P.G. instructions Page
10.1 Technical data 25
10.2 Converting the appliance gas supply 25
10.3 Gas supply installation 25
10.4 Checking & adjusting burner pressure 25
10.4.1 Setting the maximum burner pressure 25
10.4.2 Setting the minimum burner pressure 25