If this is a “one man” installation find a “friendly” clear flat
wall to place one leg assembly along side. Place the bottompanel on top of the legs channel between the “upright”.
Next place the second leg over the bottom panel so all four
through holes line up and loosely secure the lower pan to
the legs with the four M8 x 1.25 x 60mm “button head Allen
head screws and M8 flat washers supplied.
x4 x20 x20 x4
M8 x 60mm M8 M6 x 10mm M4 M4 M8
x54 x54
M4 x 16mm
M4 x 25mm
x72
Required for installation
x54
M5 x 16mm
x54
3/16”
x54
M5 x 25mm
x1
x4 x16
x54
M6 x 16mm
x1
3 421
1 2
x1
5mm
x54
M6 x 25mm
x1
x54 x54
M8 x 16mm
M8 x 25mm
13mm5/16”4mm
Install the upper cross brace between the inside frame rails
with the four each M8 x 60mm button head Allen screws and
flat washers supplied. Tighten all eight M8 x 60mm button
head Allen screws to create a firm frame structure at this
time.
5mm
9532- 010-Z01- 00
4x
4x
3x
www.vogels.com
PFT8810
Installation Guide
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d’Installation, Installatie gids
Laying the paired leg assembly first on its back and then on
its front securely install the four casters on the front and rear
of the leg assemblies using the M8 flat washers and M8 self
locking nuts supplied. Then securely install the four casters.
We recommend the two rear caster be the “locking pair”
1
3
13mm
16x
16x
244
4mm
3
Repeat the same procedure with the upper rear panel to the
leg assembly with the four each M6 x 10mm “button head”
Allen screws supplied.
Now secure firmly the four lower pan “button head” screws
to the leg assembly and tighten firmly. Repeat the same process with the front and rear upper cover panels but “don’t”
over-tighten these.
4x
Install the front “logo” plate to the bottom panel cover with
the four each 10/32 x 1/2” “kep” nuts and flat washers supplied.
3
5
5 6
13mm
6
The rear oval panel cover can be installed before or after
final assembly of the cart with the four each M6 x 10mm
“button head” Allen head screws supplied.
4mm
9532- 010-Z01- 00
www.vogels.com
PFT8810
Installation Guide
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d’Installation, Installatie gids
Install the lower front panel cover to the frame front and
secure to the frame assembly with the four each M6 x 1.0 x
10mm “button head” Allen head screws supplied
1
7
4mm
4x
248
With the rear of the lower pan exposed now would be the
time to place and wire any powered support products feeding the display with the power and signal cable being fed
between the front and rear upper cover panels. Power and
signal cable can also be run up through the three rubber
grommet hole in the base on the pan as well.
Once housed the rear cover panel may now be installed with
the four M6 x 10mm “button head” Allen screws supplied.
Access to the inner pan is still available through the rear
oval access cover.
4x
4mm
Install the two header frame to the mainframe aligning the
the lowest hole in the main frame with the 46” or 55” hole
depending on the screen size you will be using on your
video wall. Secure the lower cross bar in the appropriate
marked hole with the four each M8 x 60mm button head Allen screw and flat washer supplied. Confirm the cross bar is