
Instruction Sheet For:
PRM-2
For more information, please contact us at:
345 Log Canoe Circle, Stevensville, Maryland 21666
Toll Free: 877.281.2169 Phone: 410.643.6390 Fax: 410.643.6615
www.videomount.com

Step 2: Assembling the front
wells
Step 1
Before starting, lay out all parts to your mount and match them to
the parts list provided. Verify that you have all your parts before
attempting to assemble the mount. Note: It is highly recommend-
ed that the installation of this mount be done by a professional.
Step 2
Assemble the front pad by taking both of the rails B and place
2
them horizontally so that the fl aps with the slots cut into them point-
ing towards each other and are touching the ground. Then take
two rails A and place them on top of the left most slots cut into
the rails B so that the rail A slots mate up with the rail B slots
1
2
and so that the rail A’s fl aps are pointing towards each other. Do
the same for the right most slots on the rails B. Join the four rails
together with the square neck screws , lock washers and
nuts .
8
6
7
Step 3
Assemble the rear pad by taking both rails D and placing them
4
horizontally with the longer fl aps down and pointing towards each
other. Take a rail C and place it so the fl ap with the slots cut in
3
is pointing out from the well and so that the fi rst and third slots mate
with the slots in the rails D. Do the same for the other side and use
the square neck screws , lock washers and nuts to join
76
8
the four rails together.
Step 3: Assembling the
rear well
Step 4
Connect the two sets of pads together using the hex head 5/16”
screws , lock washers and nuts .
9
7
8
Step 4: Connecting the
front and rear wells

Step 5: Attaching the satellite
footplate to the mount plate
Step 5
Attach the satellite dish footplate to the mount plate using
the correct size hex head screw ( or ), lock washer ( or
) and nut ( or ).
11
8
12
10
9
5
7
Step 6
Attach the mount plate to the middle most rails A at the
5
1
desired proximity to the pivot point using the 5/16” hex head
screw , lock washer and nut .
9
7
8
Step 7
Place assembly on the peak of the roof. Load ballast (weight
placed into the sled to weigh down the non-penetrating roof
mount) into the front and rear wells as required for the application. Note: It is the installer’s responsibility to verify the correct
amount of ballast for the given application. Verify that all nut
and screws are completely and securely tightened. Roof mats
can be purchased to protect the roof surface is so desired/
required. It is important that the underlying roof structure be
strong enough to resist whatever forces that may be subjected
to it from the satellite dish system and mount. For extreme wind
conditions it is recommend the mount be tethered with cable.
It is up to the installer to verify that the installation meets all applicable codes and standards. Video Mount Products does not
accept and responsibility for verifying that the PRM-2 will work
for any given installation.
Step 6: Attaching the mount
plate to the front wells
Step 7: Placing the assembly on
the roof and loading the ballast
Enjoy Your Mount!
WARNING: The customer must verify the installation meets all
applicable codes and survival requirements. Video Mount
Products will not be held liable for the improper use or installation of its products.