VINO2500-6500SSR
Installer’s Instruction
Federal law requires that WINE-MATE split cooling systems be
installed by an EPA certified refrigeration technician.
WINE-MATE split system is shipped as components and is ready for use only
after a certified refrigeration technician has properly installed, evacuated,
charged and tested the system. Proper installation is critical. Vinotemp can only
warrant the quality of the components. The installation and proper operation of
the system must be warranted by the installer. Installation of the system must be
done in accordance with all state and local building and electrical codes.
The condensing unit and evaporator unit are connected by a liquid line and an
insulated suction line that are supplied by the installer. These lines must be
properly sized for the distance between the two units. After the units and the lines
are installed, the system must be pressure tested. If no leaks are found,
evacuate and charge system. Refrigerant amount will vary depending on the
length of line set.
1. Condensing Unit
• Place the condensing units WM250-650SCU in a
properly ventilated location. If it is not, heat exhausted
by the condensing unit will build up and the cooling
system will not operate properly.
• Condensing unit shall be elevated to avoid possible
flooding and shaded from direct sun. It shall not be exposed to
temperatures higher than 110
kit available).
• Leave minimum 5 feet clearance for the exhaust side and leave minimum
1 foot clearance for the fresh air intake side.
°F or lower than 50 °F (optional low ambient
CAUTION:
DO NOT SWITCH ON THE COMPRESSOR IF THE CONDENSING UNIT IS
EQUIPPED WITH A LOW AMBIENT CONDITION KIT UNTIL THE UNIT HAS
BEEN PLUGGED IN FOR 24 HOURS.
2. Valve Operation (Condensing unit)
BACK POSITION FRONT POSITION MIDDLE POSITION
Fig. 4 ROTALOCK Valve Operation
BACK POSITION FRONT POSITION MIDDLE POSITION
Fig. 5 Base Valve Operation
1 - Process & Manometer; 2 - Receiver/Compressor Suction
3 - Liquid/Suction Line; 4 - Pressure Control
Back Position: Process and manometer port closed for normal operation
Front Position: Connection to liquid or suction line closed
Middle Position: All ports open for evacuation, charge and manometer reading
3. Evaporator Unit
• The WM25-45SFCR evaporator units shall be installed for rack mount with
the air supply from the left front, top or side and air return on the right
front, top or side.
• Supply and return air flow from the evaporator unit shall be unobstructed
for at least 1 foot.
- 1 -
• There is a gravity drain line and the unit shall be installed level or with a
slight angle toward the drain connection. If rise-up is needed, a
condensation pump must be used.
4. Air Sensor
• The air sensor can be located in the wine room 5 ft above the floor or the
return air area, but not the supply air area or air dead area.
• If the temperature controller is mounted outside the wine room but the air
sensor is located inside the wine room, use 18 gauge wires to extend the
air sensor if needed.
5. Refrigeration Piping, Evacuating, Charging and Starting
CAUTION:
• ALWAYS USE THE SUPERHEAT AND SUBCOOLING, PRESSURE
READINGS TO CHARGE REFRIGERANT PROPERLY, THE LISTED
CHARGES ARE FOR REFERENCE ONLY.
• CHARGE 15% MORE REFRIGERANT IN THE SUMMER IF THE UNIT IS
EQUIPPED WITH A LOW AMBIENT CONDITION KIT.
• The installation order starts from condensing unit (including the receiver,
discharge valve), liquid line filter-drier, moisture-liquid indicator/sight glass,
liquid line, to evaporator unit (including liquid line connection, solenoid
valve, expansion valve, and suction line connection), returning to insulated
suction line, suction valve and then condensing unit.
• Use inverted siphons to prevent liquid from flooding back to the
compressor and aid oil returning to the compressor.
• Charge the system after pipe brazing, leak testing and evacuating.
• The subcooling at the condensing unit shall be around 10° F. The charge
may be complete when there are no more bubbles forming in the sight
glass.
• The evaporator’s constant pressure expansion valve is set around 3540°F at factory. This pressure setting gives a dew point to maintain the
humidity for storing wine.
• The superheat at the evaporator unit shall be around
°F under low - high load at 75°F ambient
9-18
temperature.
• If the superheat is high, check the subcooling first to
know if the refrigerant charge is sufficient. If the
charge is not sufficient, add more refrigerant. If the
charge is good, then increase the evaporator suction
pressure by turning the hex nut (5/16”) clockwise.
• If the superheat is low, then decrease the evaporator
suction pressure by turning the hex nut (5/16”)
counter-clockwise.
- 2 -