Vikre Handel AS JIT-2340J Assembly Manual

SHELTER
MODEL: JIT-2340J
L12.0xW7.0xH4.8m
Assembly Manual
Congratulations on your purchase of our instant shelter. This unit is a combination
of excellent manufacturing and design. It is comprised of a rigid frame and a durable cover. For easy assembly,we have marked all the parts with codes. With proper installation,use and maintenance,your unit will provide mang years of good and suitable service.
READ ALL THE INSTRUCTIONS BEFORE ASSEMBLY !
1.The proper erection and installation of this building requires a high level of care and safety. We recommend the safety regulations be complied with during the installation. It includes but is not limited to:
- Safety hats, protective eyewear and protective clothing
- Safety harnesses for all elevated workers
- Proper ladder, cage, and safety operation
2. Site selection: Choose a solid level location for your building. Do not install the building where the ground could not keep the building steady. Do not install the building where the ground could not bear the weight of the building. Do not install the building in soft grass ground or wetland.
3. Be cautions with the surroundings. Keep work area clean. Do not set up it near snow drifts, n slippery places, or in wet location, The cover of the building will protect against normal falling leaves and light debris, however, large, fast or sharp falling items etc. may cause a puncture or tear in the cover material. So keep the building away from such harmful things. Be careful with power and heat sources. Do not keep heat sources near the tarpaulin. Do not expose to open flame.
4. Chose a windless day to install the building. It is very difficult to attach the in heavy wind.
5. All snow accumulation on the main cover should be removed as soon as possible. Otherwise, when old snow on the roof becomes hard with new snow falling in,it will increase the burden of the roof badly and will damage the roof.
6. Try to keep the building, especially its base, in a dry condition. This will help the building to have a longer life than keeping it in a wet conditions.
7. The user should be responsible for the parts missing or damage occurred during the installation.
8. Do not make alteration of the frame. Do not hang anything besides included parts to the frame. Damages, consequential damages, or injuries caused by improper installation, alteration, improper use, or damages caused by snow, wind, or any acts of nature are owing to the user. The building is not intended for occupancy for any length of time
ASSEMBLY PROCEDURE
1. Prepare location and place all unit boxes near location sight. Perform an inventory check before
beginning, to be certain all components are available for installation.
2. Secure base plates flanges to vase surface.
3. Assemble every group of arch.
4. Begin frame assembly with front end arch,first interior arch,purlins,etc.
5. Add to assemble other groups of arches.
6. Install main cover over frame.
7. Install end covers over end panels.
Read all the detailed instructions and notices in the following assembly instructions!
MAINTENANCE AND CARE
1. If some parts or the cover were accidently damaged during the use, contact the local supplier for
advises in the repairing method or replacements, so the to prevent from further damage and keep
the building in a good condition.
2. When replacing the parts, male certain the whole frame and the parts connected to the replaced
parts be well fixed or supported.
3. Same with when attaching the cover, choose a windless day to replace the cover. Begin with
making certain all the bolts of the frame and the tensioning equipments be well fixed. When
taking off the cover, make sure the related ropes, etc. Be taken off, and the cover will not be
blocked during the way. Avoid taking off the cover with heavy big power equipments.
4. For the building with mechanical door. Keep the door closed if it is not used for long time. This
helps the mechanical door to have a longer life.
5. To enlongate the life of the cover, put small duct tape or foam rubber(provide it by yourself)on
the frame that comes to in contact with cover. The tape and foam rubber acts as a cushion to avoid
rubbing damage to the cover over years.
6. Periodically(once in half a year or more often),the building should be completely inspected and
maintained internally and externally to make certain the building remains properly installed and
secured. Including: check all bolts and hardware connectors to be certain they are in place and
tightened, he base plates are still fixed firmly, check and adjust the ropes if in need, clean the
cover with suitable washing. Allowing dirt and debris to sit on cover over an extended time will
damage cover irreparably.
Thanks again for choosing this quality product. The following is the
detailed assembly instructions for you starting the assembly.
Part Code Description Quantity
1 Top curved roof tube 7
2 Side roof tube 10 2A Side roof tube in front panel 2 2B Side roof tube in back panel 2
3 Lower roof tube 8 3A Lower roof tube in front panel 1 3B Lower roof tube in back panel 2 3C Lower roof tube at right of front panel 1
4 Roof purlin and horizontal tube 30
5 Slanting support tube 4 5A Support beam
5
6L Corner base plate at left side 2
6R Corner base plate at right side 2
7L Side base plate at left side 5
7R Side base plate at right side 5
8 Base plate at front panel 2
9 Base plate at back panel 2
10 Door beam 2 11 Upper door track 2 12 Lower door track 1
12A Lower door track to connect the lower beam 1
13 Upper beam of front panel 2
13A Lower beam of front panel 1
14 Upper leg of back panel 2 15 Lower leg of back panel 2 16 Middle beam for back panel 1 17 Side beam for back panel 2 18 Tube clip for slanting support tube and support beam 18 19 Tensioning tube for lower roof cover 2sets 20 Bottom tensioning tube of front cover 2 21 Bottom tensioning tube of back cover 3 22 Components for mechanical door 1set 23 Stake peg 50 24 Tie down ratchet 14 25 Bolt M10x75 120 26 Carrige Bolt M10x85 40 27 Bolt M10x85 8 28 Bolt M10x30 30
Part List of JIT-2340J
29 Bolt M10x12 for tie down ratchet 28 30 Roof cover 1 31 Top cover above the door 1
31A Door cover 1
32 Back cover 1 33 Side cover beside the door 2 34 Band for tie down ratchet 14
35
Rope for fastening the two ends of roof cover, the
front,door&back cover
11
36 Plastic cap for tensioning tube 6+4 37 Door dropping tube in the middle 6sets 38 Door dropping tube at the bottom 1set 39 Felts to stick on the connection for protecting the cover 28
Loading...
+ 9 hidden pages