Viessmann Solar?Divicon, Solar-Divicon PS10, Solar-Divicon PS20, P10, P20 Installation And Service Instructions Manual

...
Installation and service instructions
Solar−Divicon,
part no.7188391 and 7188392,
Solar circuit pump line, part no.7188393 and 7188394
Safety instructions
¨
Installation, initial start−up, inspection, maintenance and repairs must be carried out by a competent person (heating engineer/installation contractor).
Before working on the equipment/ heating system, isolate the power supply (e.g. by removing a separate mains fuse or by means of a mains isolator) and safeguard against unauthorised reconnection.
When using gas as fuel, also close the main shut−off valve and safeguard against unauthorised reopening.
It is not permitted to carry out repairs on parts that fulfil a safety function. For replacements, use only original spare parts from Viessmann or those which are approved by Viessmann.
Dimensions
A SolarDivicon B Safety assembly
C Solar circuit pump line
5862810GB5/2005
Please keep safe
380
240
0
20
40
60
80
100
120 0
20
40
60
80
100
120
380
210
0
20
40
60
80
100
120
A
B
C
2
Assembly and installation information
H The Solar−Divicon comprises:
 pre−assembled and sealed valves
and safety assembly
 Flow regulating valve to control
the solar heating system during the initial start−up and operation
 Non−return valve in the flow and
return pipe
H Always install Solar−Divicon so that
steam cannot enter the expansion vessel in the event of stagnation.
H The Solar−Divicon and the solar
circuit pump line are not suitable for direct contact with swimming pool water.
H Flush the system with process
medium after draining.
H If the expansion vessel is installed
as high or higher than the Solar−Divicon, a thermal insulation loop is required.
H A pre−cooling vessel connection is
fitted to the flow line to protect the expansion vessel against excess temperatures.
H Use only gunmetal, brass fittings,
copper pipes or Viessmann stainless steel solar circuit pipes for the installation. Never use galvanized/zinc−plated pipes, fittings or graphitised gaskets. Use hemp only in conjunction with pressure and temperature−resistant sealants (e.g. ViscotexSolarpaste, Locher & Co. AG, CH9450Altstätten). Components that come in contact with process medium must be resistant to the medium.
H Check the sealing surfaces for
cleanliness and damage before assembly.
Installation of the locking ring fittings
H All pipes must be cut at a right
angle and deburred.
H Insert the support sleeves into the
pipework.
H Push the union nut and the locking
ring onto the pipe and lightly lubricate the threads with oil.
H Push the pipe into the locking ring
fitting as far as it will go.
H Initially turn the union nut by hand,
then tighten with an open ended spanner by a further ¾ turn.
H Never fit annealed copper pipes
onto the locking ring fittings.
5862810GB
3
Assembly and installation information (cont.)
System with SolarDivicon
A SolarDivicon B Solar circuit pump line C Collector D Expansion vessel E Manual solar fill pump F Fill valve G Shut−off valve H Drain valve K Filling assembly L Connections to the DHW cylinder M Air separator N Solar control unit O Air vent valve P Pre−cooling vessel (if required)
System with SolarDivicon and solar circuit pump line
Position the solar circuit pump line to the right near the Solar−Divicon. The Solar−Divicon pump acts as a bypass pump, the solar circuit pump line pump as a solar circuit pump. In this case fit the safety assembly onto the solar circuit pump line.
RL Return VL Flow
5862810GB
A
C
O
N
L
M
G
K
F
E
D
TT
T
VL RL
H
P
D
B
C
O
L
M
G
K
F
E
D
TT
VL
RL
T
T
A
H
T
N
P
D
4
Fitting the Solar−Divicon
5862810GB
or
8mm
or
5.
3.
4.
1.
2.
3.
5
Fitting the Solar−Divicon (cont.)
1. Pull the upper section of the
thermal insulation forwards.
2. Secure the valve assembly together with the lower part of the thermal insulation.
3. Installation with copper pipes
Insert the support sleeves into the interconnecting pipes of the solar circuit. Alternative:
Installation with stainless steel solar circuit pipe
Trim (free of burrs) in the valley of the corrugation; do not damage the peak of the corrugation. Fit the union nut, half washer (in the fifth valley) and O−rings (in the first and third valley).
4. Insert a support sleeve into the connection pipe to the expansion vessel and secure on the safety assembly.
5. Secure the blow−off line with the safety valve from the safety assembly; ensure the correct orientation of the locking ring.
Note
The blow−off line must terminate in an open container.
6. Route the connecting cable for the circulation pump downwards through the cable duct and connect to the solar control unit.
Installation and service instructions  solar control unit
7. Push the thermal insulation over the valve assembly.
8. Push the thermal insulation of the pipework into the recesses of the thermal insulation of the Solar−Divicon.
5862810GB
6.
7.