Viess VITOCROSSAL 200 CM2 Installation Instructions Manual

Installation instructions
for contractors
VIESMANN
Vitocrossal 200 Type CM2
Gas condensing boiler with MatriX radiant burner
VITOCROSSAL 200
Dispose after installation.
2
Please follow these safety instructions closely to prevent accidents and mate­rial losses.
Safety instructions explained
Danger
This symbol warns against the risk of injury.
!
Please note
This symbol warns against the risk of material losses and envi­ronmental pollution.
Note
Details identified by the word "Note" con­tain additional information.
Target group
These instructions are exclusively designed for qualified personnel.
■ Work on gas appliances must only be carried out by a qualified gas fitter.
■ Work on electrical equipment must only be carried out by a qualified elec­trician.
Regulations
Observe the following when working on this system
■ all legal instructions regarding the pre­vention of accidents,
■ all legal instructions regarding envi­ronmental protection,
■ the Code of Practice of relevant trade associations,
■ all current safety regulations as defined by DIN, EN, DVGW, TRGI, TRF, VDE and all locally applicable standards.
■ Gas Safety (Installation & Use) Reg­ulations – the appropriate Building Regulation
either the Building regulations, the Building Regulation (Scotland), Building Regulations (Northern Ire­land),
– the Water Fittings Regulation or
Water Bylaws in Scotland,
– the current I.E.E. Wiring Regula-
tions.
Working on the system
■ Isolate the system from the power sup­ply and check that it is no longer 'live', e.g. by removing a separate fuse or by means of a mains isolator.
■ Safeguard the system against unau­thorised reconnection.
■ When using gas as fuel, also close the main gas shut-off valve and safeguard against unauthorised reopening.
Safety instructions
5592 702 GB
3
Preparing for installation................................................................................... 4
Installation sequence
Siting and levelling the boiler................................................................................ 5
Fitting the thermal insulation................................................................................ 6
■ Thermal insulation mats.................................................................................... 6
■ Side panels....................................................................................................... 7
■ Front panels...................................................................................................... 8
■ Thermal insulation mat at the back and back panels........................................ 9
Control unit installation......................................................................................... 9
Connecting on the heating water side.................................................................. 10
Making the safety connections ............................................................................ 12
Electrical connections and top panel installation.................................................. 12
■ Cables............................................................................................................... 12
■ Connections to the control unit base................................................................. 13
■ Top panels and covers...................................................................................... 14
Connections on the flue gas side......................................................................... 14
■ Flue outlet and siphon....................................................................................... 14
■ Condensate drain pipe...................................................................................... 16
Burner installation................................................................................................. 17
Connecting the burner on the gas supply side..................................................... 18
Connecting the burner electrically........................................................................ 19
Fitting the burner hood......................................................................................... 20
Commissioning and adjustment........................................................................... 21
Index
5592 702 GB
4
Clearance dimensions
C
A
A
B
b
500 (250)
600
a
500 (50)
A
Boiler
B
Burner
C
Adjustable anti-vibration boiler sup­ports (accessories)
Dimensions in brackets are minimum clearances. Dim. a: 500 mm Dim. b: 400 mm
When using Viessmann accessories for two-boiler systems, dimensions a and b apply.
Installation instructions flue gas header and hydraulic system connection
Preparing for installation
5592 702 GB
5
!
Please note
Damage to the flue outlet can lead to flue gas escaping. Never lift or move the boiler by the flue outlet.
Note
A suitable condensate drain (maximum 50 mm above floor level) must be avail­able in the installation room if the boiler is installed at ground level.
A
2.
1.
1.
Insert adjusting screws A from above into the base rails.
Note
The adjusting screws are supplied in the pack.
2. Level the boiler horizontally. Special foundations are not required.
Note
We recommend the installation of the boiler on adjustable anti-vibration supports (accessories). Insert these from below into the base rails.
Siting and levelling the boiler
5592 702 GB
6
Note
All required components are included in the carton containing the thermal insula­tion.
Thermal insulation mats
1.
2.
3.
3.
Note
In the case of balanced flue operation, attach the ventilation air pipe before fit­ting the thermal insulation panels.
Installation instructions for acces­sories for balanced flue opera­tion
Fitting the thermal insulation
5592 702 GB
7
Side panels
8x
6 x 10
4x
6 x 10
3.
3.
4.
4.
2.
1.
5. 8x
3.9 x 9.5
Secure the side panels to the upper fix­ing rails.
Fitting the thermal insulation
(cont.)
5592 702 GB
8
Front panels
3.9 x 9.5
2.
3.
1.
2 mm
3.9 x 9.5
Fully insert the screws into the front panel top after fitting the boiler tempera­ture sensor and the other sensors (see page 13).
Note
Prepare an aperture for the ventilation air pipe in the front panel when operating the boiler in balanced flue mode.
Installation instructions for acces­sories for balanced flue opera­tion
Fitting the thermal insulation
(cont.)
5592 702 GB