WC installation frame for Prevista with LED
lighting
Instructions for Use
for all Prevista concealed cisterns
ModelYear built:
8650.1from 09/2018
en_INT
Page 2
WC installation frame for Prevista with LED lighting2 from 10
Page 3
Table of contents
1About these instructions for use4
Table of contents
1.1
1.2
1.3
Target groups4
Labelling of notes4
About this translated version5
2Product information6
2.1
2.1.1
2.2
2.2.1
Intended use6
Areas of use6
Product description6
Overview6
3Handling7
3.1
3.1.1
3.2
Assembly7
Mounting the installation frame7
Disposal10
WC installation frame for Prevista with LED lighting3 from 10
Page 4
About these instructions for use
1About these instructions for use
Trade mark rights exist for this document; for further information, go to
viega.com/legal.
1.1Target groups
The information in this instruction manual is directed at the following
groups of people:
n Heating and sanitary professionals and trained personnel
n Drywall builder
Individuals without the abovementioned training or qualification are not
permitted to mount, install and, if required, maintain this product. This
restriction does not extend to possible operating instructions.
1.2
The installation of Viega products must take place in accordance with
the general rules of engineering and the Viega instructions for use.
Labelling of notes
Warning and advisory texts are set aside from the remainder of the text
and are labelled with the relevant pictographs.
DANGER!
This symbol warns of possible life-threatening injury.
WARNING!
This symbol warns of possible serious injury.
CAUTION!
This symbol warns of possible injury.
NOTICE!
This symbol warns of possible damage to property.
This symbol gives additional information and hints.
WC installation frame for Prevista with LED lighting4 from 10
Page 5
1.3About this translated version
This instruction for use contains important information about the choice
of product or system, assembly and commissioning as well as intended
use and, if required, maintenance measures. The information about the
products, their properties and application technology are based on the
current standards in Europe (e.g. EN) and/or in Germany
(e.g. DIN/DVGW).
Some passages in the text may refer to technical codes in Europe/
Germany. These should serve as recommendations in the absence of
corresponding national regulations. The relevant national laws, stand‐
ards, regulations, directives and other technical provisions take priority
over the German/European directives specified in this manual: The
information herein is not binding for other countries and regions; as said
above, they should be understood as a recommendation.
About these instructions for use
WC installation frame for Prevista with LED lighting5 from 10
Page 6
2Product information
2.1Intended use
2.1.1Areas of use
The installation frame is intended for the installation of the WC flush
plates for Prevista Visign for More 201 and 204 in dry construction prewalls.
2.2Product description
2.2.1Overview
Product information
Fig. 1: Scope of delivery
1WC installation frame
2Y cable
WC installation frame for Prevista with LED lighting6 from 10
3silicon grease (2 x 2 g)
4retaining bolt
5glue point
6infrared sensor
Page 7
3Handling
3.1Assembly
3.1.1Mounting the installation frame
Requirements:
n The power pack is installed and connected to the motor.
n The control has been plugged onto the cover plate.
n The cistern is fitted into the pre-wall.
n The pre-wall is tiled.
Turn the cover plate lock 90° in anti-clockwise direction.
Handling
Remove the cover plate.
Apply the silicon grease to the electronic connections.
Connect the Y-cable with the single-assignment side to the control.
Fasten the Y-cable on the rear of the cover plate using the adhesive
point.
WC installation frame for Prevista with LED lighting7 from 10
Page 8
Handling
Guide the two ends of the Y-cable forward through the right-hand
opening of the cover plate.
Replace the cover plate and lock it.
Put on the installation frame.
Insert the retaining bolts.
Turn the retaining bolts by 90° in a clockwise direction.
WC installation frame for Prevista with LED lighting8 from 10
Page 9
Align the installation frame.
To fix the retaining bolts, turn safety rings in a clockwise direction.
INFO! When using the WC flush plate Visign for More 201:
Loosen the infrared sensor and plug it on the bottom wall bracket.
Handling
Apply the silicon grease to the connections.
Connect the short end of the Y-cable to the installation frame.
Push the major part of the cable back into the cistern.
The installation frame has been mounted and the flush plate
ð
can be mounted.
WC installation frame for Prevista with LED lighting9 from 10
Page 10
3.2Disposal
Handling
Separate the product and packaging materials (e. g. paper, metal,
plastic or non-ferrous metals) and dispose of in accordance with valid
national legal requirements.
WC installation frame for Prevista with LED lighting10 from 10
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.