Viega Prevista Pure 8512, 8516 Instructions For Use Manual

Page 1
Prevista Pure WC block 3H
Instructions for Use
for WC flush plates for Prevista, walling in and around
Model Year built:
8512 from 03/2019
en_INT
Page 2
Prevista Pure WC block 3H 2 from 21
Page 3

Table of contents

Table of contents
1.1
1.2
1.3
Target groups 4
Labelling of notes 4
About this translated version 5
2 Product information 6
2.1
2.1.1
2.2
2.2.1
2.2.2
2.2.3
2.3
Intended use 6
Areas of use 6
Product description 6
Overview 6
Compatible components 7
Technical data 7
Accessories 7
3 Handling 8
3.1
3.1.1
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.3
3.4
Assembly information 8
Installation dimensions 8
Assembly 9
Mounting the WC block 9
Connecting concealed cistern 12
Mounting the drain elbow 15
Setting up and bricking in the WC block 17
Setting the flush volume 19
Cleaning and maintenance 21
Disposal 21
Prevista Pure WC block 3H 3 from 21
Page 4
About these instructions for use

1 About these instructions for use

Trade mark rights exist for this document; for further information, go to viega.com/legal.

1.1 Target groups

The information in this instruction manual is directed at the following groups of people:
n Heating and sanitary professionals and trained personnel n Drywall builder
Individuals without the abovementioned training or qualification are not permitted to mount, install and, if required, maintain this product. This restriction does not extend to possible operating instructions.
1.2
The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use.
Labelling of notes
Warning and advisory texts are set aside from the remainder of the text and are labelled with the relevant pictographs.
DANGER! This symbol warns of possible life-threatening injury.
WARNING! This symbol warns of possible serious injury.
CAUTION! This symbol warns of possible injury.
NOTICE! This symbol warns of possible damage to property.
This symbol gives additional information and hints.
Prevista Pure WC block 3H 4 from 21
Page 5

1.3 About this translated version

This instruction for use contains important information about the choice of product or system, assembly and commissioning as well as intended use and, if required, maintenance measures. The information about the products, their properties and application technology are based on the current standards in Europe (e.g. EN) and/or in Germany (e.g. DIN/DVGW).
Some passages in the text may refer to technical codes in Europe/ Germany. These should serve as recommendations in the absence of corresponding national regulations. The relevant national laws, stand‐ ards, regulations, directives and other technical provisions take priority over the German/European directives specified in this manual: The information herein is not binding for other countries and regions; as said above, they should be understood as a recommendation.
About these instructions for use
Prevista Pure WC block 3H 5 from 21
Page 6

2 Product information







2.1 Intended use

2.1.1 Areas of use

The Prevista Pure WC block is suitable for walling in and around, for single mounting, for line mounting, wall mounting, and stand-alone mounting.
This model is equipped with dual flush technology. The Prevista Pure WC block can generally be used with all types of WC ceramic.

2.2 Product description

2.2.1 Overview

Product information
Prevista Pure WC block 3H 6 from 21
1 3H concealed cistern 2 Reducer 3 Holder for drain elbow 4 Drain elbow 5 Wall mounting 6 Threaded rods for fixing sanitary objects (gauges for bore hole 180
or 230 mm) 7 Screws for fixing in support profile 8 Mounting set for WC ceramic 9 Flushing pipe 10 WC connection socket with lip seal 11 Protective plug for flushing pipe elbow
Page 7
12 Protective plug for drain elbow DN90 13 Revision shaft cover 14 Corner valve

2.2.2 Compatible components

The WC element is compatible with all common WC ceramics, even with larger projection (barrier-free).
The WC element can be extended by the following compatible compo‐ nents:
n Prevista Dry fixing element n Prevista Dry fixing set model 8573 n Fixing set model 8180.73 n Accessory set connection electronic model 8655.11
Product information
Mount the components in accordance with the respective instructions for use.

2.2.3 Technical data

Flush volume
Small flush volume Factory setting approx. 3 l
Large flush volume Factory setting approx. 6 l

2.3 Accessories

Standing bracket for stand-alone mounting
You require the Prevista Pure standing bracket model 8570.54 to enable the stand-alone mounting of the Prevista Pure WC block.
Setting range approx. 2–4 l
Setting range approx. 3.5–7.5 l
Prevista Pure WC block 3H 7 from 21
Page 8

3 Handling

3.1 Assembly information

3.1.1 Installation dimensions

Handling
Fig. 1: Dimensional drawing
Prevista Pure WC block 3H 8 from 21
Page 9

3.2 Assembly

3.2.1 Mounting the WC block

Handling
Remove the protection box.
Break the locking clips off the wall mountings.
Push the wall mountings into the element.
Insert the locking clips.
Prevista Pure WC block 3H 9 from 21
Page 10
9

Handling
Adjust the construction height of the WC block in accordance with
the on-site marking of the upper edge of the finished floor.
X = 1000 mm
Mark the fixing points.
Drill the holes.
Insert the dowels.
Tighten the WC block via the mounting brackets using a fork
spanner (size 13).
Prevista Pure WC block 3H 10 from 21
Page 11
Line mounting
Handling
Attach rail to the wall.
Attach each of the cisterns to the Steptec rail connector using two
connection pieces.
Prevista Pure WC block 3H 11 from 21
Page 12

3.2.2 Connecting concealed cistern

Turn the cover plate lock 90° in anti-clockwise direction.
Remove the cover plate.
Handling
Place the press connector on the water inlet.
Press the connection.
Seal the threaded connectors of the corner valve.
Screw the corner valve into the thread side of the Steptec rail con‐
nector.
Prevista Pure WC block 3H 12 from 21
Page 13
INFO! For the concealed cistern 3H, the corner valve can be
attached from the top or rear.
Remove the plug.
Insert the corner valve into the cistern.
Handling
INFO! Ensure the corner valve is correctly seated.
Use the lock nut to screw the corner valve and the cistern to one
another.
Remove the protective cap from the water supply hose.
Screw the water supply hose and the corner valve to one another.
Prevista Pure WC block 3H 13 from 21
Page 14
Insert the cover plate into the cistern.
Turn the cover plate lock by 90° in a clockwise direction.
Handling
Place the revision shaft on the cover plate.
To remove the revision shaft, press in the fixing clips at the side.
Prevista Pure WC block 3H 14 from 21
Page 15

3.2.3 Mounting the drain elbow

Handling
Insert the mounting bracket for the drain elbow.
Fill up the bottom part of the element with mortar.
Replace the protection box.
Prevista Pure WC block 3H 15 from 21
Page 16
Insert the drain elbow.
Fasten the drain elbow using the bow.
Attach the protective plug of the flushing pipe elbow.
Fit the protective plug of the drain elbow.
Handling
Prevista Pure WC block 3H 16 from 21
Page 17

3.2.4 Setting up and bricking in the WC block



min. 10
Turn in the threaded rods by hand.
For 180 mm gauge for bore hole: Counter the threaded rods in front
of the element with a nut.
For 230 mm gauge for bore hole: Counter the threaded rods in front
of and after the element with a nut.
Push the protective caps onto the threaded rods.
Brick in the WC block.
Handling
The tiling format must be at least 10 mm.
Prevista Pure WC block 3H 17 from 21
Page 18
Tile the WC block.
Handling
Prevista Pure WC block 3H 18 from 21
Page 19

3.2.5 Setting the flush volume

Requirements:
n The cistern is freely accessible. n The water supply has been shut off. n The ceramic has been mounted.
Handling
Fold the tabs forward.
Lift the drain valve.
Remove the drain valve through the revision opening.
Prevista Pure WC block 3H 19 from 21
Page 20
Set the large flush volume at the drain valve.
-
-
Set the small flush volume at the drain valve.
Handling
Prevista Pure WC block 3H 20 from 21
Page 21
Setting the flush flow
Handling
Requirements:
n The drain valve has been dismounted. n The flushing throttle has been removed.
Unlock the flushing throttle.
Set the flush flow at the throttle.
Lock the flushing throttle.
3.3
Cleaning and maintenance of the concealed cistern
Cleaning and maintenance
The concealed cistern is constantly under mechanical, chemical, and physical stress. For this reason, the components must be cleaned as required, and the drain and filling valve seals renewed.
In areas or regions with hard water due to high concentration of calcium or magnesium salts, there is the risk of limescale deposits developing on the inlet and drain valves. The valves may have to be replaced, depending on the extent of the deposits.
3.4
Prevista Pure WC block 3H 21 from 21
Disposal
Separate the product and packaging materials (e. g. paper, metal, plastic or non-ferrous metals) and dispose of in accordance with valid national legal requirements.
Loading...