
1
Need Help? Watch the video at www.victortech.com/High-Rise
High Rise™ Sit-Stand
Desk Converter
Assembly Instructions for Model DC300
PRE-ASSEMBLY
• Please read all instructions before beginning assembly. We strongly recommend
you watch the video at www.victortech.com/High-Rise.
• Remove all parts and hardware from box and lay out on a scratch-free work surface,
as this will avoid damaging any parts during assembly. The shipping box provides
an ideal work surface.
• Do not dispose of any contents or packaging material until assembly is complete.
This will help to avoid accidentally discarding small parts or hardware.
• For your safety and ease, adult assembly by two people is recommended.
• Use the parts and hardware lists to identify and separate each of the pieces included
prior to starting assembly.
• Do not use power tools. Use only the included Hex Key and Wrench. Power tools
can damage hardware and split wood.

2
Need Help? Watch the video at www.victortech.com/High-Rise
Bolt 5 pcs
Washer 2 pcs
Nut 2 pcs
Monitor Screws 4 pcs
Thumb Screw 1 pc
Hex Key 1 pc
Wrench 1 pc
Missing Parts?
Call 1-800-628-2420 for
Victor customer service.
Missing Parts or UPS Damaged Parts?
For your convenience you can E-mail us
at victor@victortech.com
If you require assistance during assembly, please watch
our video at Victortech.com/High-Rise
Or call our Customer Service Department
Monday – Friday 8 am to 4 pm CST 1-800-628-2420

3
Need Help? Watch the video at www.victortech.com/High-Rise
Step 1: Attach Tower to Steel Base
1-2 3 4 5
Use the Hex Key to attach the Tower to the Steel Base. Follow these steps:
1. Place the Steel Base on a flat and sturdy table with the felt pads facing down.
2. Using two hands, position the Steel Base so the five bolt holes are over the edge of
the table.
3. As shown above, place the Tower on top of the steel base and align the holes from
the Tower with the holes on the Base.
4. Take the bolts and hand feed them through the Base from underneath. Hand-tighten
the bolts until nearly tight. Keep bolts slightly loose until all are connected.
5. Use the small Hex Key to tighten the bolts more securely. Do not over tighten.
4
The Tower will be packaged in a compressed position. Do not loosen the knobs until
assembly is complete. This will make assembly easier.