
Circulating Fan Kit
Installation Instructions
Model: FK28/2960
For use with
Pinnacle PDV20/SDVR Direct Vent,
Stardance/Pinnacle UVS27 Vent Free,
Jefferson Direct Vent, Jefferson Unvented
JUV Gas Heaters and Seville Woodburning
Stove
Read these instructions completely before
beginning installation.
WARNING
This appliance is equipped with a three-prong
(grounded) plug for your protection against
shock hazard and should be plugged into a
properly grounded three-prong receptacle. Do
not cut or remove the grounding prong from this
plug.
PDV20/SDVR Installation Procedure
– for Pinnacle Direct Vent
1. Attach the Snapstat to the Bracket using two #10 x
1/2” phillips screws as shown in Figure 1.
2. Locate and remove the 1/4-20 x 3/8” hex head bolt
installed in the hole in the right rear ledge of the fire
box. (A, Fig. 1) Use that bolt to secure the Snapstat
Bracket to the firebox. The mounting hole is slotted to
let you adjust the bracket so that the snapstat head
makes contact with the firebox surface. (Fig. 1)
3. Attach the Fan to the firebox by engaging the upper
flange of the fan skirt under the lower edge of the
Shroud and secure the skirt with the four #10 x 1/2”
Hex Hd Cap screws and one star washer provided.
(Fig. 2)
1/4-20 x 3/8”
Hex Bolt
Bracket
Snapstat
A
1/2” Sheet
Metal Screws
Fig. 1 Snapstat assembly and installation. (PDV20 shown)
-
The Fan Kit FK28/2960 attaches to the rear shroud
of the PDV20/SDVR Direct Vent heater, the UVS27
Unvented, Jefferson Direct Vent, Jefferson JUV
Unvented heaters and the Seville Woodburning Stove.
Installation for the PDV20 should be made after the firebox is set within the stove shell but before connection
to the gas supply. Installation for the UVS27 should be
made before the firebox is set within the shell. Installation for the Jefferson Direct Vent and JUV may be made
at any time during assembly. Installation for the Seville
should be made before the stove is removed from the
shipping pallet. Follow the procedure for the appropriate
firebox model.
The kit includes a snapstat sensor which turns the fan
on or off at approximately 109˚F. Be sure the heater is
cool before beginning the installation.
Fan Kit Contents:
• #10 x 1/2” Phillips screws, 6
• Star Washer • Wire Tie
• Control Knob • Retaining Nut
• Snapstat • Snapstat Bracket
• Blower Assembly w/ Rheostat Control and Snapstat
• Silicone Tape
Rheostat
Control
Fig. 2 The upper flange of the fan skirt should be located
behind the lower edge of the shroud. (PDV20 shown)
Upper
Flange
Sheet Metal
Screws (4)
Fig. 3 Correct position of fan skirt installation. (PDV20 shown)
30000275 8/08 Rev. 6

4. The Rheostat Control switch attaches to the Control
Panel plate provided in the parts bag with the stove.
• Insert the switch box shaft through the hole in the
back of the right side of the Panel, aligning the locator pin with the smaller hole in the panel. (Fig. 4)
• Attach the Retaining Nut to the switch control shaft
to secure it to the plate.
• Attach the Control Knob to the rheostat shaft.
• Use the wire tie to secure the fan and rheostat wire
harnesses together to the tubing under the bottom
heat shield.
Do not install the Control Panel onto the stove until
after the gas supply and valve wiring connections have
been made. See Assembly Instructions, PDV20/SDVR
Owner’s Guide.
Rheostat
Control Panel
Fig. 4 Attach the Rheostat to the Control Panel.
Retaining Nut
Control Knob
5. A length of silicone tape is included for installation
between the Top Plate and the Rear Shroud, should
you find that contact between these two surfaces
causes vibration while the fan is operating.
• Remove the Top Plate.
• Cut the self-adhesive tape to size as needed,
remove the backing paper and place tape on the top
edge of the Shroud at those locations where it will
eliminate direct contact between the Shroud and the
Top Plate. (Fig. 5)
• Replace the Top Plate.
UVS27 Installation Procedure
– for Stardance and Pinnacle Vent-Free
1. Attach the Fan assembly to the rear shroud in the
same manner as detailed in the preceding section for
the PDV20/SDVR, following Step 3, Figures 2-3.
2. Disconnect the snapstat module from the leads
inside the snapstat bracket. (Fig. 6)
3. Bend open the snapstat bracket. Use your fingers
or needle nose pliers to remove the black plastic
grommet from the bracket. Discard the grommet and
bracket.
4. Feed the snapstat wire lead up between the inner and outer rear shroud panels and secure the
snapstat to the upper right side of the inner shroud.
(Fig. 7)
5. Secure the snapstat wire harness to the shroud panel
using the wire tie provided with this kit.
6. Route the rheostat control switch and wire forward
under the stove. Use the wire tie to secure the fan
and rheostat wire harnesses together to the tubing under the bottom heat shield.
UVS27R / Honeywell Millivolt Valve: Install the
rheostat onto the control panel at the hole to the
right of the valve, as in Figure 4.
UVS27M / SIT Manual Valve: Install the rheostat onto
the bracket to the left of the valve.
Pinch Grommet
to Remove
Snapstat
Bracket
Snapstat
Module
Fig. 6 Remove snapstat and grommet from bracket.
ST468
Cut pad
to size
and
locate as
needed
Fig. 5 Vibration dampening pad location. (PDV20 shown)
2
Fig. 7 Attach snapstat to inner shroud.
30000275