Vent-Axia GALAXY GBD Series, GALAXY GRD Series, GALAXY GDD Series, GALAXY Series, GALAXY GRB Series Installation And Wiring Instructions

...
GALAXY™
TWIN FANS
GDB:Galaxy In-line belt driven, twin fan GDD:Galaxy In-line direct driven, twin fan GRB:Galaxy Roof mounting belt driven, twin fan GRD:Galaxy Roof mounting direct driven, twin fan
Installation and Wiring Instructions
PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION. THESE INSTRUCTIONS SHOULD BE LEFT WITH THE END USER.
1
Model Ranges
GBD GDD GRB GRD
STORAGE / INSTALLATION
The unit must be stored in clean, dry conditions. DO NOT install these fans in areas where the following may be present:-
1) Excessive oil or grease laden atmosphere.
2) Corrosive or flammable gases, fluids or vapours.
3) Ambient temperatures higher than 40
4) Relative humidity above 95%
5) Possible obstructions which will hinder removal.
6) Sudden ductwork transformations close to the unit.
If the unit is to be stored for a long period of time the fan impeller must be rotated by hand at monthly intervals to prevent hardening of the lubricant and corrosion or static indentation of the bearings.
It is recommended that before installation the resistance to earth should be measured and if found to be less than 2 M the motor should be dried out before applying mains voltage.
o
C and below -15oC.
IMPORTANT - SAFETY
All air moving equipment may present electrical, mechanical or noise hazards either during installation or during operation. These instructions are meant to help in the prevention and / or minimisation of these hazards. It is important that due consideration is given to the implementation of these instructions and to due attention being given to applicable statutory requirements.
Potential hazards from rotating parts that can be reached during operation must be eliminated by using appropriate guards meeting statutory requirements.
All electrical installation must be undertaken by a suitably qualified and competent person and must be carried out in accordance with all relevant Statutory Requirements. Please check the details on the unit rating plate to ensure that the correct power supply (Voltage, Frequency, and Phase) is available. Do not use the fans with an incorrect power supply, as overheating and failure of the motor will occur.
All fans generate noise during operation. Dependant on the installation sound attenuators or other acoustic treatment may be necessary to achieve acceptable noise levels in the ventilated area or the area surrounding the fan installation. The product catalogues indicate the noise levels generated by the equipment in standard test situations. The installed condition may affect the actual noise levels experienced in operation.
When the fan is installed in a room containing a fuel burning appliance, the installer must ensure that air replacement is adequate for both the fan and the fuel burning appliance. If the fan can be used to supply air into the room, the installer must ensure that the fan intake is located at least 600mm away from any flue outlet.
The appliance is not intended for use by young children or infirm persons without supervision.
Please note a wide range of accessories for this product are available from Vent Axia Limited.
2
MOUNTING
Galaxy belt and roof mounted direct drive fan units, must only be installed horizontally. The lid of the roof mounting unit should be removed to gain access to fit M10 coach screws (not supplied by Vent Axia), when curb mounting.
The optional mounting brackets (2 off brackets per unit) are recommended, when mounting the duct mounted units (GDD & GDB). Holes will need to be drilled on each side of the unit to correspond with the respective number of holes provided on each support bracket (4 off – GDB and 2 off – GDD). Secure each bracket in place utilizing relevant fixings (not supplied by Vent Axia), ensuring they are level with each other and the unit.
Duct mounted direct drive (GDD) units may be mounted for bottom access by making a small change to the shutters as follows:
1) Remove the lid of the unit and the retaining screws of the outer shutter brackets.
2) Move the nylon bushes to the vacant holes in all shutter brackets.
3) Reassemble shutter flaps into the nylon bushes.
4) Refit the retaining screws of the outer brackets and refit the lid of the unit.
CHECK LIST
1) Are all links and wiring complete (refer to wiring diagrams)?
2) Are all fixings secured?
3) Are all relevant guards fitted?
4) Are all protective circuit devices fitted and wired correctly?
5) Are all terminal box covers and gland fittings secure?
6) Are all earth connections secured?
7) Check that no hazard exists for persons in the locality of the fan. Check that the fan rotation is correct as per the direction arrows on the fan plate / casing. If not isolate power supply and check wiring.
8) Check that the current (amps) taken by the fan does not exceed the current shown on the rating plate.
9) Ensure rotation of impeller is correct. Incorrect rotation may cause irreversible damage to the motor. Three phase units require a trial connection, to reverse direction interchange any two supply leads.
RESPONSIBILITY
Vent Axia, as suppliers of the equipment, cannot be responsible for the final installation and electrical connection of the product on site. We have made reasonable effort to offer guidance and assistance but the installer and electrical contractor on site have a responsibility for ensuring the equipment is safely and securely installed and electrically / mechanically safe in accordance with statutory requirements.
INSPECTION
These pieces of equipment require maintenance, cleaning and inspection, therefore allow reasonable access for these operations to be carried out by a suitably qualified person, safely.
ISOLATE ALL POLES FROM POWER SUPPLY AND ENSURE POWER CANNOT BE RE­CONNECTED BEFORE ANY WORK IS CARRIED OUT.
It is recommended that the fan be inspected after three months or sooner if conditions dictate. If a build up of dirt / deposits is evident then this should be carefully cleaned off. Please take care not to damage the fan or affect the balance of the impeller motor assembly (balance weights may be fitted to the impeller).
Further inspections should be carried out periodically as necessary dependant on experience and site conditions. It is recommended that a minimum of two inspections per year be carried out.
The fan motors are fitted with “sealed for life” bearings and, under normal circumstances, should not require maintenance.
3
BELT TENSION AND ALIGNMENT (Belt driven units)
The belt tension and alignment should be checked:-
1) When fitting new belts, installing a new fan or just prior to starting the fan for the first time.
2) After the first 30 minutes of operation.
3) At least every 6 months.
Alignment
Ensure that the pulleys are correctly aligned before checking the belt tension and after any adjustments.
Method For Checking Belt Tension
Using a belt tension indicator, with metric calibration:-
1) Multiply the centre distance (in metres) by 16, this gives the deflection distance in mm.
2) Set the lower marking ring to the deflection distance required in mm on the lower scale.
3) Set the upper marker ring against the bottom edge of the top tube.
4) Place the tension indicator on top of the belt at the centre of span and apply a force at right angles to the belt deflecting it to a point where the lower marker ring is level with the top edge of the adjacent belt. (For single belt drives a straight edge should be placed across the two pulleys to act as a datum for measuring the deflection).
5) Read off the force value indicated by the top edge of the upper marking ring.
6) Compare this value to the kgf value shown in the table below.
Force required to deflect belt 16mm per metre of span
Belt Section
SPZ
SPA
If measured force falls within the values shown then the drive should be satisfactory. A measured force below the lower value indicates under tensioning.
Small Pulley Dia.
(mm)
67 to 95 10 to 15 1.0 to 1.5 100 to 140 15 to 20 1.5 to 2.0 100 to 132 20 to 27 2.0 to 2.7 140 to 200 28 to 35 2.8 to 3.5
Newton (N) Force (kgf)
Adjustment
The belt tension can be adjusted by displacing the motor. After any adjustment, re-check belt alignment.
Replacement Of Drive Components
1) Belts: - The drive belts should be replaced periodically as they are worn. First move the motor toward the fan by a sufficient amount to allow the belts to be removed from the pulleys. All the belts in a drive should be replaced simultaneously. Ensure that the replacement belts are all matched (i.e. are exactly the same length). The new belts should be re-tensioned and aligned as per previous instructions and checked at the intervals stated.
2) Pulleys: - Belt drive units are normally fitted with taperlock pulleys and bushes.
3) Removal: - Remove the grub screws and oil lightly. Screw one of them into the extractor hole (on larger bushes two extractor holes are provided in which case two grub screws should be used). Tighten the screw(s) until the bushes are released from the hub of the pulley and the bush is released from the shaft. Pull the bush and pulley from the shaft as one unit.
4) Fitting: - Clean the bore of the pulley and the bush to ensure that all surfaces are free of grease and dirt. Fit the bush into the pulley. Oil the grub screws lightly and screw them by hand into the tapped holes between the pulleys and bush. Clean the fan shaft and fit the bush and pulley as one unit. Tighten the grub screws alternately whilst checking that the pulleys are in line until all of the screws are securely tightened. Fit the belt(s), re­tension and re-check the alignment of the drives as previously described.
4
GDB Galaxy In-line Belt Driven, Twin fan
Unit
A B C D E F G Weight kg
GDB1 480 850 1000 650 250 110 790 125
GDB2 540 1100 1175 762 305 116 790 175
GDB3 675 1250 1450 900 400 135 1090 210
GDB4 765 1500 1450 1000 457 153 1090 270
5
GDD Galaxy In-line Direct Driven Twin fan
Unit
a b c d e f Weight kg
GDD1 210 530 425 175 100 55 20
GDD1X 210 530 425 175 100 55 20
GDD2 260 740 525 225 150 55 20
GDD2X 260 740 525 225 150 55 20
GDD2XH 260 740 525 225 150 55 20
GDD3 330 740 600 250 150 90 20
GDD4S 390 900 700 350 200 95 30
GDD4 390 900 700 350 200 95 30
GDD5 440 1000 800 400 325 57 52
GDD6 440 1000 800 450 350 44 59
GDD7 575 1250 1000 650 400 86 64
6
GRB Galaxy Roof Mounting Belt Driven Twin fan
Unit
A B C D E F G H J Weight kg
GRB1 500 900 1100 900 500 250 247 100 900 90
GRB2 600 1150 1175 1120 762 305 150 27.5 1120 120
GRB3 700 1450 1450 1450 900 400 150 - 1450 195
GRB4 800 1550 1450 1550 1000 450 150 - 1450 215
7
GRD Galaxy Roof Mounting, Direct Driven
Unit
a b c d e f g h j k Weight kg
GRD1 250 670 500 500 150 100 150 85 490 75 11
GRD1X 250 670 500 500 150 100 150 85 490 75 11
GRD2 340 750 700 700 225 150 150 25 690 75 22
GRD2X 340 750 700 700 225 150 150 25 690 75 22
GRD2XH 340 750 700 700 225 150 150 25 690 75 22
GRD3 390 750 700 700 250 150 150 25 690 75 21
GRD4S 450 850 800 800 300 200 150 25 790 75 32
GRD4 450 850 800 800 300 200 150 25 790 75 32
GRD5 550 1000 950 950 500 250 150 25 940 75 55
GRD6 550 1050 1050 1050 600 300 150 - 1040 75 65
GRD7 650 1250 1150 1150 750 350 150 50 1140 75 65
8
GENERAL WIRING
Warning:- The Fan And Ancillary Control Equipment Must Be Isolated From The Power Supply During Installation And / Or Maintenance. The Equipment Must Be Earthed.
All-pole disconnection must be incorporated into the fixed wiring.
Only fixed wiring in conduit is required. Flexible cord must not be used.
1. Remove the cover from the fan terminal box.
2. Connect the power supply from the local isolator (via appropriate controls) to the terminal box/switch via an
appropriate cable gland.
3. Refer to the wiring diagrams and select the appropriate connections for the fan, depending on the controller or
other devices being installed.
4. Wiring instructions for the control equipment being used should be considered when making connections to
the fan terminals.
5. Controls must include non-self resetting overload protection.
6. In addition to non-self resetting overload protection, 3 phase products must be provided with single phasing
prevention.
7. Where products have TK connections on the fan terminal strip, these are independently connected to a
thermal switch in the windings of the motor and should be used as part of the control system.
8. Ensure that all earth connections have been made.
After completing and checking the connections to the terminal box, replace the terminal box lid ensuring that the gasket is correctly seated in place. Ensure that all cable gland / grommet fixings and terminal box lid fixings are tightened correctly to prevent water ingress.
Non-self resetting protection must be provided for this range of fans. If the protection device operates you MUST check for the cause before allowing the fan to resume operation. Failure to do so may cause damage to the motor and invalidate the guarantee.
Fuses in the circuit should be regarded as only protecting the wiring against short circuits or earth faults; they are not suitable for overload protection. Fuse ratings must be able to carry starting loads, which can be taken as a maximum of six times the running current for 25 seconds.
9
GRD1 GRD2 GRD3 GRD4 GRD4S GRD5 GRD6 GRD7
GRD1X GRD2X GRD2XH
:
10
GDD1 GDD2 GDD3 GDD4 GDD4S GDD5 GDD6 GDD7
GDD1X GDD2X GDD2XH
11
Head Office: Fleming Way, Crawley, West Sussex, RH10 9YX. Tel: 01293 526062 Fax: 01293 551188
UK NATIONAL CALL CENTRE, Newton Road, Crawley, West Sussex, RH10 9JA SALES ENQUIRIES: Tel: 0844 8560590 Fax: 01293 565169 TECHNICAL SUPPORT: Tel: 0844 8560595 Fax: 01293 539209
For details of the warranty and returns procedure please refer to www.vent-axia.com or write to Vent-Axia Ltd, Fleming Way, Crawley, RH10 9YX As part of the policy of continuous product improvement Vent-Axia reserves the right to alter specifications without notice.