Vent-Axia CSH12, CSH12A, CSH18, CSH18A, CSH24 Installation & Operating Instructions Manual

...
The Installation must be carried out by trained
personnel.
A means for disconnection must be
incorporated in the fi xed wiring by a double pole switch with a contact separation of a minimum of 3mm and in accordance with the current IEE Wiring Regulations.
below a fi xed socket outlet.
The heater is not suitable for connection to a
30A ring circuit.
Do not position the heater under windows where
curtains can contact the heater casing.
WARNING - THE SURFACES ON THIS HEATER CAN BE HOT.
This heater meets EN60335 safety requirements. However, any heater type becomes hot in normal operation.
Care must be taken to ensure that prolonged skin contact with the heater does not occur.
WHERE YOUNG CHILDREN, INFIRM PERSONS, OR THE AGED ARE PRESENT THIS APPLIANCE MUST
BE ADEQUATELY GUARDED. Contact your installer or the manufacturer for further advice.
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision for instruction concerning use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.
This appliance is very heavy and must be securely fi xed to a wall. DO NOT UNDER ANY CIRCUMSTANCES
ATTEMPT TO MOVE OR REPOSITION THIS HEATER WITHOUT SEEKING EXPERT ADVICE.
To maintain stability, it is essential that the heater is placed on a level surface.
This heater must be installed where it is impossible for switches and other controls to be touched by a person
using a bath or shower.
IMPORTANT - Due to the newness of materials the heater will produce a slight smell for the fi rst few days of
operation. ROOMS MUST BE WELL VENTILATED AND YOUNG CHILDREN, CAGED BIRDS, OR PERSONS WITH RESPIRATORY COMPLAINTS MUST NOT REMAIN IN CLOSE PROXIMITY TO THE HEATER DURING THE FIRST 48 HOURS OF THE COMMISSIONING PERIOD.
IF, DURING ANY REASSEMBLY OF THE HEATER, A PART OF THE THERMAL INSULATION SHOWS
DAMAGE OR DETERIORATION WHICH MAY IMPAIR SAFETY, IT SHOULD BE REPLACED BY AN IDENTICAL PART.
MODELS: 1.7kW/12kWh Storage and 1kW Convector (CSH12 & CSH12A)
2.55kW/18kWh Storage and 1.5kW Convector (CSH18 & CSH18A)
3.4kW/24kWh Storage and 2kW Convector (CSH24 & CSH24A)
COMBINED STORAGE AND
CONVECTOR HEATER
INSTALLATION & OPERATING
INSTRUCTIONS
IMPORTANT
PLEASE READ THIS LEAFLET CAREFULLY
AND RETAIN FOR FURTHER USE NOTE ALSO THE INFORMATION
GIVEN ON THE HEATER
WARNING - This appliance must be earthed.
SUGGESTED FIXINGS
INSTALLATION INSTRUCTIONS
PREPARATION
The heater will arrive separately from its storage bricks, the following bricks will be required.
CSH12 & CSH12A - 8 bricks
CSH18 & CSH18A - 12 bricks
CSH24 & CSH24A - 16 bricks
Only heat resisting cable (min. rating T85) should be used. The wires in the mains cable will be coloured as follows;
GREEN & YELLOW - EARTH BLUE - NEUTRAL BROWN - LIVE
SOLID BRICK/BLOCK - No. 10 Size plastic inserts, 8mm drill bit. Drill hole 15mm deeper than plastic insert length.
PLASTERBOARD - If possible locate studding and use No. 10 woodscrews directly into the wood, otherwise M5 rawlplug intersets are suitable.
NOTE:FOR ALL OTHER WALL TYPES (e.g. Timer frame and follow concrete) SEEK SPECIALIST ADVICE.
FIXING ASSEMBLY
ENSURE THAT FIXING KIT AND FEET HAVE BEEN LOCATED BEFORE DISPOSING OF PACKAGING.
1.
Fit the feet with the open end of the foot to the front of the heater. Secure each foot using the two taptite
screws provided.
2.
2.
4.
Place the heater on its feet and in the desired position against the wall. Ensure the heater is based on a fi rm level surface at least 75mm from any end wall and at least 250mm below any shelf or similar projection. Cut away any gripper rod or carpet which would prevent the heater sitting fi rmly on the fl oor.
4.
Mark the position of the two outside corners of the wall bracket with the heater pushed tight against the wall. Remove the wall bracket from the heater by removing the screw at each end. Place the heater to one side and reposition the bracket against the wall using the corner marks for alignment.
Four fi xing positions must be chosen for the 24, three for the 18 and two for the 12. Mark the positions for the fi xing holes - two at the extreme ends and the others spaced evenly between them. Remove the bracket from the wall, drill the holes in the positions marked, and insert suitable fi xings previously described. Secure the wall bracket to the wall.
5.
5.
If mains connection is to be made from the left hand side, at this point the mains lead must be secured to the back of the heater using ties provided in the fi xing kit.
6.
6.
THE FOLLOWING MUST BE APPLIED WHEN
FIXING THE HEATER TO THE WALL BRACKET
i) If no skirting board is present secure the heater through
the wall bracket slots closest to the wall.
ii) If 100mm (4in.) skirting is present secure the heater
through the outer slots.
iii) If skirting taller than 150mm (6in.) is present this must
be reduced to 150mm (6in.) over the entire width of the
heater plus 25mm (1in.) at each end. Do not fully tighten these screws until the bricks are loaded into the heater as some settling of the heater may occur.
NOTE: NEVER REMOVE THESE SCREWS WITHOUT FIRST UNLOADING THE HEATER.
7.
Circuit Diagram
3.
SH(A) MODELS ONLY - The Room Sensor is located
at the rear of the right hand side of the heater. Carefully slide the sensor plate down from its transit position to its operational position.
3.
Transit Position
Operational Position
7.
8.
Remove the front panel by removing the two self tapping
screws along its bottom edge. With hands positioned on each side of the panel, lift upwards to unhook the top edge whilst pressing down on the top panel with your thumbs.
Ensure the convector element is not damaged when placing this panel to one side.
8.
9.
Remove the inner front panel be removing the screws
along its top and sides. As the front insulation is attached care must be taken when lifting this panel from the heater and placing it to one side. Remove the internal packing by sliding it up and off the elements taking care not to damage the insulation.
9.
10.
10.
Remove one element to allow access for the back row
of bricks. On the 24 remove the element to the right
of centre, on the 18 remove the central element, on the 12 the left hand element should be removed.
Loosen the two screws securing the element tails in the ceramic connector block, and lift the element up and out of the heater.
11.
Carefully fi t the bottom row of the back layer of bricks
placing the two end bricks in position fi rst with the recess towards the element. Fit the top row of bricks also with the recess towards the element.
12.
Refi t the element which has been removed by feeding
the tails down through the hole in the base insulation and into the connector block. Ensure the element is fully pushed home then securely tighten the two screws in the block.
12.
13.
Fit the front layer of bricks again with the recess towards the element. The complete core will comprise:
12 - 2 x 4 Brick Columns
18 - 3 x 4 Brick Columns
24 - 4 x 4 Brick Columns
14.
Replace the inner front complete with insulation by locating its bottom edge behind the front lip of the chassis
and inserting retaining screws along the top and both sides.
15.
Check that the fl ap mechanism operates freely on its hinges and that with the output control set to 1 the
ap is correctly seated in its closed position.
16.
Connection of Supply to Storage - Feed the mains
cable through the cable clamp and make connections as marked on the heater. Pull back any slack through the clamp and tighten clamping screw.
WARNING - This appliance must be earthed.
16.
RESTRICTED SUPPLY
17.
Connection of supply to Convector is through a
cable clamp in the case of the front panel.
Connect the wires as detailed below, pull back any slack through the cable clamp and tighten clamping screws, see picture 16.
17.
18.
Replace the outer
front panel and grille by hooking the grille into its retaining slot on the top panel and lowering it into position. Secure the front panel with two self tapping screws.
18.
19.
Check that the screws securing the heater to the wall
bracket have been fully tightened.
IT IS ESSENTIAL THAT ALL SCREWS ARE REPLACED TO ENSURE EARTH CONTINUITY.
Once installed do not attempt to reposition the heater without rst obtaining the services of a competent electrician.
UNRESTRICTED SUPPLY
OPERATING INSTRUCTIONS
OPERATION
Your CSH(A) heater combines the economy of a storage
heater with the convenience of a convector heater.
The storage heater takes in energy, when electricity tariffs
are low and dissipates it when tariffs are normal.
The convector heater provides an instant boost on
demand from normal tariff electricity.
SAFETY INSTRUCTIONS
1. Ventilate rooms well during commissioning.
2. Do not move the heater in any way once installed without the services of a competent electrician.
3. Do not cover the heater with clothing etc. at any time or position furniture close to or against the heater.
4. Ensure a clearance of at least 150mm between heaters and curtains.
5. Should your heater fail to operate either employ the services of a competent electrician or contact your supplier.
ALSO REFER TO COVER PAGE
COMMISSIONING
Set both the Input Control and the Output Control to 6 and
leave the heater for 48 hours.
Following the commissioning period adjust the controls as
stated below.
SETTING THE CONTROLS
The storage controls are located on the top panel. The convector controls are located at the top of the front panel’s right side.
CONTROL FUNCTIONS
THE INPUT CONTROL
For models CSH12A, CSH18A and CSH24A only:
This heater is fi tted with a user adjustable automatic input control which varies the charge taken in response to weather conditions taking into account the amount of energy already stored in the heater. Set at 6 the heater takes maximum charge and at 1 the heater takes a minimum charge at any room temperature. The casing of the heater, particularly in late evening, may feel cool, this is quite normal. The input control may require a few days experimentation before your comfort level is established. Initially set the control to 4, the following evening if the room is too warm reduce to 3 or if it is too cool increase to 5. On subsequent evenings adjust by half divisions until our comfort level is achieved. Having established the setting the input will automatically carry the amount of heat stored to compensate for weather variations.
THE OUTPUT CONTROL
Most of the stored heat is radiated from the casing during the discharge period. However, some of the heat is emitted through the grille at the top of the heater and this additional heat (boost) is regulated by the Output Control.
With this set to 6 the boost begins in the early afternoon. Turning the control towards 1 will progressively delay the commencement of the boost. At 3 the boost will start in the evening. Once set, the boost will repeat itself automatically day after day.
If no boost is required, e.g. when the room will be unoccupied for along period, set the Output Control to 1. With the control in this position, the heater will take in less energy during the next charging up period.
CONVECTOR HEATER
CONVECTOR HEATER CONTROLS
The convector is selected by an on/off rocker switch which illuminates when switched on ‘1’. With the switch on, the convector element shall be cycled on and off by the room thermostat. With the switch off “0” the convector will not run. The room thermostat knob is marked 1 to 5. The higher the setting number chosen, the higher the level at which the room temperature will be controlled. Your comfort level can easily be established by gradually adjusting the thermostat until the required room temperature is maintained.
CLEANING
To maintain the appearance of the heater wipe occasionally with a dry cloth when the heater is cool. Do not use abrasive powders or furniture polish. Discoloration of wall fi nishes can sometimes occur immediately above a storage heater due to the properties of some paints and decorating materials or the presence of environmental impurities in the air (such as soot or incense generated for the burning of candles, etc.).
438941A SUPPLIED BY APL 87659 : 1 08.2008
For electrical products sold within the European Community. At the end of the electrical products useful
life it should not be disposed of with household waste. Please recycle where facilities exist. Check with your
Local Authority or retailer for recycling advice in your country.
RECYCLING
For models CSH12, CSH18 and CSH24 only:
Initially set the input to 4. If the heater does not maintain a satisfactory room temperature the following day this setting should be increased. Conversely if the room temperature is too high this setting should be reduced.
The input control should only require seasonal adjustments.
Loading...