INSTALLATION INSTRUCTIONS
FOR
SOLAR ROOF-MOUNTED POWER VENTS
(Solar Panel Mounted on Dome)
Models:
Read all warnings and instructions before starting installation of this fan
FAILURE TO FOLLOW THESE INSTRUCTIONS COULD RESULT IN INJURY OR EVEN DEATH
1. Use this unit only in the manner intended by the manufacturer. If you have any
questions, contact the manufacturer.
2. Installation work and electrical wiring must be done by qualified person(s) in
accordance with all applicable codes and standards, including fire-rated construction.
3. When cutting or drilling into wall or ceiling, do not damage electrical wiring and other
hidden utilities.
4. The combustion airflow needed for safe operation of fuel-burning equipment may be
affected by this unit’s operation. Follow the heating equipment manufacture’s guideline
and safety standards such as those published by the National Fire and Protection
Association (NFPA), and the American Society for Heating, Refrigeration and Airconditioning Engineers (ASHRAE), and the local code authorities.
VX1000SOLDOM Series, CXSOLRFDM Series
CAUTION
1. This fan is controlled by a solar panel and may start unexpectedly if the
panel is exposed to sunlight. Keep the panel securely covered until the fan
is mounted, or when servicing the fan.
2. This unit has an unguarded propeller. Do not use in locations readily
accessible to people or animals.
3. Mount with the lowest moving parts at least 8 feet above floor level.
4. For general ventilating use only. Do not use to exhaust hazardous or
explosive materials and vapors.
5. Carbon monoxide is an odorless, colorless gas that can kill. It may be drawn
into the house by operating this fan if your fuel-burning equipment is not
properly maintained, or if you lack adequate attic intake vents.
VENTAMATIC, LTD.
100 WASHINGTON STREET, MINERAL WELLS, TX 76068-0728
PHONE: (800) 433-1626 - FAX: (940) 325-9311 - www.bvc.com
THIS
INTAK
NEVE
SAFE
WATT
SUIT
Ste
Pla
cent
posi
the
Ste
Wh
cent
insi
hole
follo
Ste
Dra
the
the
in S
the
OOF-MOUNT
S ARE LOC
FROM ROO
ND EFFICIE
.
BLE FOR IN
1
e unit on t
er of the ro
ioned so th
ouse.
2
n this positi
erline direct
e the roof,
will be use
ing operat
3
a referenc
oof using
ole drilled
ep 2 as
enter.
ED UNIT IS D
TED AROUN
OR RIDGE
T OPERATIO
TALLATION
p of shingle
f and close
unit is onl
n is establi
ly between
rill a hole t
as a refer
ons.
e square 2
INS
SIGNED FO
THE EAVES
ENTS. AT LE
N. THE MOT
ON ROOFS
, approxim
to the ridge
visible on
shed, locat
wo rafters
rough the r
nce point f
3/8-in x 25
ALLATI
ATTICS OF
ALTERNATI
AST 400 SQ-I
R OPERATE
P TO 8/12 PI
tely in the
ine, but
ne side of
a
nd, from
of. This
the
3/8-in on
N INST
VERAGE SI
ELY, AIR IN
NET FREE
ON 18 V.D.
CH*
Ste
Wit
rem
dra
Ste
Ne
circl
in S
dec
Ste
Slid
(so
Pos
Ste
UCTIO
E AND OPER
AKE MAY BE
IR INTAKE V
. CURRENT
4
in the squa
ove shingle
n.
5
t draw a 14
e on the de
tep 2 as a c
ing, using
6
the flange
e roofing n
ition the uni
3) to align
S
TES MOST
FROM OPPO
ENT AREA IS
ND THE SO
re, draw a 1
, nails, and
1/2 -in dia
king. Be s
enter of this
he 14 ½-in
of the unit
ails may ne
on the ref
the exhaus
FFICIENTLY
SING GABLE
REQUIRED,
AR PANEL IS
7-in diamet
felt from th
eter circle i
re to use t
circle. Cut
ircle as the
p under th
d to be re
rence squa
opening.
HEN AIR
ENTS, BUT
ER UNIT, FO
RATED AT 1
r circle an
circle just
side the 17
e hole drill
through the
cut line.
shingles
oved).
e (drawn in
.6
-in
d